HomeMy WebLinkAbout2017-02-22 Conservation Commission Minutes
North Andover Conservation Commission Meeting Minutes
February 22, 2017
Members Present: Louis A. Napoli, Chairman, Albert P. Manzi, Jr., Vice Chairman,
Joseph W. Lynch, Jr., Deborah A. Feltovic, John T. Mabon, Douglas W. Saal.
Member Absent: Sean F. McDonough.
Staff Member Present: Heidi M. Gaffney, Conservation Field Inspector
Meeting came to Order at: 7:03PM Quorum Present.
Pledge of Allegiance
Public Hearings: 7:04 PM
242-1689, Salem Street (Lots 1-3) (Livingstone Development Corporation) (Norse
Environmental Services, Inc.) (cont. 2/8/17)
The applicant’s representative has requested a continuance.
A motion to grant a continuance to the March 8, 2017 meeting is made by Ms. Feltovic,
seconded by Mr. Manzi.
Vote unanimous
Documents:
E-mail prepared by Christiansen & Sergi, Inc. requesting a continuance to the March 8,
2017
Plan Proposed Lots 1-3 prepared by Christiansen & Sergi, Inc. October 3, 2016, revised
dated December 28, 2016, revised dated January 11, 2017, revised dated February 17, 2017
242-1699, 1 High Street (RCG North Andover Mill, LLC) (Design Consultants, Inc.) (cont.
from 2/8/17)
The applicants, Tania Hartford and David Steinberg of RCG and David Giangrande of
Design Consultants, Inc. are present.
The applicants discuss the project.
The field inspector states that she received a phone call from Lisa Eggleston of Eggleston
Environmental stating that the project is generally acceptable to her, but she does question
the board system and the possibility to raise the water level higher in the pond than current
conditions.
Mr. Lynch asks about the emergency certification.
The commission discusses with the applicants the headwall work and what will be done with
the old pipes.
The applicants state that the old pipes will be left in place and filled with concrete.
The applicants state that they need the shop drawings on the structures to be installed.
Mr. Manzi asks if they can install some type of warning system to prevent a similar failure
problem in the future.
The applicants discuss that they can possibly camera or do a physical inspection during low
flow conditions.
Mr. Napoli states that is sounds like things are in good shape and they can address any issues
that Eggleston Environmental may have.
The applicant requests a continuance to finalize the plans and address any comments or
issues that Eggleston Environmental has.
A motion to grant a continuance to the March 8, 2017 meeting is made by Ms. Feltovic,
seconded by Mr. Manzi.
Vote unanimous.
Document:
Proposed Pond Outlet Profile Plan prepared by Design Consultants, Inc. dated February 16,
2017
242-1696, 50 Royal Crest Drive (Bio-Retention) (Cornerstone Land Consultants, Inc.)
(cont. from 2/8/17)
Ken Lania of Cornerstone Land Consultants, Inc. is present.
The field inspector briefly reviews the project status.
Mr. Lania discusses Lisa Eggleston’s comments and how he’s addressed them stating that he
can add a post and rail fence as a physical barrier around the bio-retention area to prevent any
inadvertent clearing beyond the bio-retention area.
Mr. Lynch reviews Lisa Eggleston’s comments regarding the maintenance and need for a
fence.
Mr. Lania states that he will work with Jen regarding any trees that can be kept and the fence.
Mr. Manzi states that the fence needs to be something better than a post and rail.
Mr. Lania states that it can be a stockade fence.
The commission discusses that the fence needs to be see through but permanent such as chain
link, as a solid stockade style would encourage dumping behind the fence.
Mr. Lania states he can work on what will work best for a fence and requests a continuance.
A motion to grant a continuance to the March 8, 2017 meeting is made by Mr. Manzi,
seconded by Mr. Lynch.
Vote unanimous.
Document:
No new documents have been submitted
242-1697, 315 South Bradford Street (Smolak Farms) (Civil Design Group, LLC) (cont.
from 2/8/17) (Request to cont. to 3/8/17)
The field inspector states that the applicant has requested a continuance.
A motion to grant the request for a continuance to the March 8, 2017 meeting is made by Ms.
Feltovic, seconded by Mr. Manzi.
Vote unanimous.
Document:
E/Mail prepared by Civil Design Group, LLC request for a continuance to the March 8, 2017
meeting dated February 17, 2017
242-1700, 203 Cotuit Street (Deschamp) (Norse Environmental Services, Inc.)
Maureen of Norse Environmental is present.
The field inspector briefly reviews the status of this filing and the proposed work.
Maureen discusses the proposed project and reviews the patio work that has already been
done as well as the history of the lot.
Mr. Napoli states that the pool as proposed is not approvable.
Mr. Lynch discusses the proposal before them and asks how this project got to this point.
The field inspector reviews the work on the patio that has already been started and the
Enforcement Order status which lead to the current filing.
Mr. Mabon discusses that a waiver may be allowable for the patio and discusses that an
above ground may be eligible for a waiver but the currently proposed pool looks oversized
and they should consider reducing the size and relocating the pool.
Mr. Saal states that they should look at relocating the pool to the side of the house outside of
the 50’ no-build zone.
Maureen discusses the commissions comments and her clients wishes and asks about the
proposed fire pit and what might be possible to do on the lot.
Mr. Manzi states that there is a lot of room for modification of the plan to get what the
owners want but that things need to be moved around.
Mr. Manzi and the commission discuss what may be possible.
Mr. Manzi states that the proposal needs to be changed and they need to come back.
The commission discusses what to do about the EO and that it will be tabled pending the
submittal of a more approvable plan.
Mr. Mabon states that it is always a good idea to enhance the no-disturbance zone as
mitigation.
A motion to continuance to the March 8, 2017 meeting is made by Ms. Feltovic, seconded by
Mr. Lynch.
Vote unanimous.
Documents:
Application Checklist-Notice of Intent
WPA Form 3-Notice of Intent
General Information
Additional Information
Signatures and Submittal Requirements
Copy of State & Town Checks
Affidavit of Service dated February 10, 2017
NOI Wetland Fee Transmittal Form
Narrative of Site Work Proposed
Copy of Enforcement Order dated October 5, 2016
Notification to Abutters Form
Certified Abutters List prepared by the North Andover Assessors Department January 25,
2017
Google Earth Aerial Photo prepared by Norse Environmental Services, Inc. dated June 2015
Google Earth Aerial Photo prepared by Norse Environmental Services, Inc. dated July 2007
Town of North Andover Aerial Photo prepared by Norse Environmental Services, Inc. dated
January 25, 2017
Mass GIS Topographic Aerial Map prepared by Norse Environmental Services, Inc. dated
January 25, 2017
Soil Aerial Soil Map prepared by Norse Environmental Services, Inc. dated January 25, 2017
Firm Flood Insurance Rate Aerial Map dated July 3, 2012
North Andover Wetlands Regulations Riverfront Area Map prepared by Norse
Environmental Services, Inc. dated June 3, 2003
Letter prepared by Norse Environmental Services, Inc. Alternative Analysis for 203 Cotuit
Street dated February 10, 2017
North Andover Conservation Commission Waiver Request Form prepared by Norse
Environmental Services, Inc. dated February 2, 2017
Topographic Plan of Land prepared by Merrimack Engineering Services, Inc. dated January
25, 2017
Photos prepared by the North Andover Conservation Department dated February 15, 2017
General Business: 7:30 PM
242-1580, COC Request, 1018 Osgood Street (JFJ Holdings, LLC) (MHF Design
Consultants, Inc.) (cont. from 2/8/17)
The field inspector states that the planning board voted to release the bond at their 2/21/17
meeting pending the submittal of proof of maintenance of the stormwater system, and that
the conservation commission has already received proof of maintenance.
A motion to issue the COC is made by Mr. Mabon, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Letter prepared by MHF Design Consultants, Inc. request for Certificate of Compliance
dated January 20, 2017
WPA Form 8A-Request for Certificate of Compliance
Letter prepared by Cafua Management Company, LLC This letter is to confirm that we read
and understand the recorded Order of Conditions prior to the purchase of the property at
1018 Osgood Street in North Andover dated January 19, 2017
Massachusetts Quit Claim prepared by JFJ Holdings dated January 12, 2012
Operation & Maintenance Plan and Long Term Pollution Prevention Plan for Stormwater
Management Systems dated October 19, 2012, revised December 7, 2012, revised March 1,
2013, revised April 4, 2013
As-Built Plan prepared by MHF Design Consultants, Inc. dated January 20, 2017
242-1593, Extension Request, 16 Berry Street (North Andover Holdings, LLC) (LEC
Environmental Consultants)
The commission states that the applicant has requested a 2 year extension under the WPA
and that this project was not filed under the Bylaw.
A motion to grant a 2 year extension is made by Mr. Mabon, seconded by Mr. Lynch.
Vote unanimous.
Document:
Letter prepared by LEC Environmental Consultants, Inc. request for extension to the Order
of Conditions dated February 13, 2017
242-1523, Modification Request, 273 Berry Street (Seidel)
The field inspector discusses the request and states that the builder had prepared an as-built
prior to selling the home but that the OOC is still open for plant monitoring, however the new
owner installed a patio sometime in 2015 and has obtained a new as-built showing that the
new patio is outside of the 50’ no-build zone.
The commission discusses.
A motion to grant the modification is made by Mr. Lynch, seconded by Mr. Manzi.
Vote unanimous.
Documents:
Letter prepared by Mr. Joshua Seidel of 273 Berry Street request an after the fact
modification for patio construction dated February 13, 2017
Conservation As-Built Plan prepared by Christiansen & Sergi, Inc. dated January 12, 2017
242-1169, PCOC Request and Partial Bond Release, 2357 Turnpike Street (Meadows)
(Valley Realty Development, LLC) (cont. from 1/11/17) (Request to cont. to 3/22/17)
The field inspector states that the applicant has requested a continuance to the March 22,
2017 meeting.
A motion to grant the continuance to the March 22, 2017 meeting is made by Ms. Feltovic,
seconded by Mr. Manzi.
Vote unanimous.
Document:
E/Mail prepared by Gita Brazelis, Esq. of Law Offices of Michael E. Lombard, LLC request
for continuance to the March 22, 2017 meeting dated February 15, 2017
Request for Determination of Applicability
1160 Great Pond Road (Brooks School) (Whitman & Bingham Associates) (cont. from
2/8/17)
The field inspector states that the planning board heard this at their 2/21/17 meeting and that
Rebecca in the planning department stated that the planning board will be requiring soil
testing for the soil that will be used as fill in the area of the field regrading.
The commission discusses that they do not want to close the hearing until planning is
satisfied with the filing.
A motion to grant a continuance to the March 8, 2017 meeting is made by Mr. Lynch,
seconded by Mr. Manzi.
Vote unanimous.
Document:
No new documents
A motion to adjourn the meeting at: 8:00PM is made by Ms. Feltovic, seconded Mr. Lynch
Vote unanimous.