Stevens Memorial Libra!y Roof Preservation
Kathleen Keenan — Director of Stevens Memorial Library,and
Eva Hamori —Chair of Stevens Memorial Library Board'of Trustees and past Chair of Stevens
Memorial Library Building Committee, Senior Project Planner— STV Group Engineering
Company* gave presentation
• describing current conditions of library
• showing photos of inside of library
4P regarding the library's needs and how CPA can help and the possibility of other sources
of help
Discussions:
multiple leaks utilizing 'water collection devices'
current clay tile roofs have nails holding them which have rusted and there is no flange
around the nail head
life safety issues
- due to the large amount of money needed may need to be phased project: 3-5 year
plan, but preferably 1-2 year plan.This presents a sequence problem if done in phases.
Tile roofs are above, rubber roofs are below.
- Capital Improvement Plan beginning with life safety
- 1907, 1968 and 1996 construction diagrams and materials used
- warranty periods have.expired
- roof traffic (custodian, air conditioning, maintenance personnel)
- review of testing results performed by Gale Associates Roof Evaluation Report October
22, 2015
- review of diagram showing Library Project Phases
- review of Stevens Memorial Library Building Envelope Stqd What repairs will cost,
based on the engineering study's best guess. This is not a bid or an estimate, It is from
Kathleen and Steve Foster based on what Gale Associates recommended
- renovation is considered Historic Preservation in part or whole due to keeping design
and integrity of the library intact
- shelf-life of repair/ maintenance plan/ warranty (New code mentions tiles to be attached
in a different way — hook mechanism)
- Steve Foster to lead Quality Inspection Team He estimates life expectancy of rubber
roof—20 years, and clay tiles — 50+ years.
- criteria requested from CPA regarding 'next step procedure'for application guidelines
l
1
t
"s
}
k
Concerns were voiced regarding:
- if roof has been leaking for many years, what is underneath, will this hold the project up
and where will money come from.
- air quality may be compromised
paint removal
- 5% contingency 1
- Capital Improvement Plan Request i
phasing this project versus one fell swoop
time line/sequence/pricing
clarification given regarding "refasten"versus"replace" and subsequent pricing
insurance claims
logistics of project
safety; securing entrances
moving library during construction versus cordoning ofcertain areas
�
Next Step to include;
- hire a Roof Design Engineer.
- plan to be contingent if done in phases or all at once (full design, or smaller phased
projects)
- price escalation/years ,
need strong commitment from CPA or other for funding
labor/pricing/material bids
cost advantage: Economles of Scale to get entire project done at once
Recommendations made:
To.use seed money to get bid for design.for final project
Make decision based on final project design bid
Include contingency in budget 2F
u
Historical doors have been completely restored, and have been clear-coated: solid oak with
custom-made hinges (can be painted if needed).
* STV Group Engineering Company :private, employee-owned corporation specializing in
engineering, architectural, planning and construction management services, serving the building
and facilities, transportation, energy, and infrastructure market sectors.
35 Milk Street Property_{4.5 acres
B. Wakeman reviewed
agreement of approval at last meeting to hire appraiser for mock sub-division/highest =
and best use of property.
utilizing the house for veterans housing; 1-family house for veteran.
E
6
gg�
1
Ff
3
contract with N. Aikenhead, Conservation Consulting and Real Estate Consulting, will �
take care of negotiating and all related paperwork. Also plans to meet with Fields
Committee for land usage possibilities, �
t
34 Acres- O en Space 1
- owner would like to keep property undeveloped
- wants fair value of property
- with town sewer to property line, on town accepted road, with road widening easements
and drainage easements
- would involve commitment between Community Preservation, state grant money, and
Friends of the Trustees
Middle School Pro"ect f
T. Holland met with Town Manager, Andrew Maylor on Thursday, December 10, 2015
plans to survey neighborhood for land usage ideas
- exploratory committee will come together to.,lay out possible plans, but will not be ready
for May 2015 Town Meeting
- design plans predicted for 2017
- Town and Scl-iool Departments are 100% on board with enhancements
multiply funding sources
- will be a multi-phased project (3)
- additional property.may be available—.3 house lots, possibly wet land
Ridgewood Cemetery
- upper wall and walkway are complete, new,trees replaced old
- some work left on lower wall and cobbles
- made good use of time
well-done project
Next Meeting:
January 14, 2016