Loading...
HomeMy WebLinkAboutBuilding Permit # 4/26/2017 5/5/2017 *Building Permit#24464-View Point Cloud 24,464 *Building Permit—Construction of Additions,Alterations,and Remodeling O Building Permit Issued TIMELINE OSubmission received Apr 20,2017 at 11:43am 10 Building Department Review Completed Apr 21,2017 at 7:56am © Conservation Department Review Skipped Apr 21,2017 at 8:29am Planning Department Review O * M. Completed Apr 21,2017 at 9:03am OHealth Department Revies Completed Apr 21,2017 at 9:09am ODPW Engineering Review Completed Apr 21,2017 at 8:42am ODPW Operations Review Completed Apr 21,2017 at 8:13am J1%% Fire Department Review Completed Apr 21,2017 at 7:59am � OTreasurer Review Completed Apr 21,2017 at 12:14pm https://northandover m a.vi ewpoi ntcl oud.com/#/records/24464 1/5 5/5/2017 *Building Permit#24464-View Point Cloud OBuilding Inspector Approval Completed Apr 26,2017 at 1:08pm OAdditions/Alterations/Remodeling Bldg Permit Fee Paid Apr 27,2017 at 7:41am OPermit Issued Issued Apr 27,2017 at 7:40am *Building Permit#24464 Construction of Additions,Alterations,and Remodeling Applicant Location James Testa 48 HAWKINS LANE , NORTH ANDOVER, MA t- 978-682-2023 Owner @ testabandr@comcast.n.. AHLHOLM JR, FREDERICK W Attachments PDF f 11 XL x111111F hu Aj ri`_20 12017 "1 Uploaded by James Testa on Apr 20,201711:43 AM , Application Submission Required information varies depending on who is applying for a building permit. Are you submitting this application as the Homeowner?' https://northandoverma.viewpointcloud.com/#/records/24464 2/5 5/5/2017 "Building Permit#24464-View Point Cloud NO Primary Contractor Search for your contractor using the search bar below. Either the Licensee Name or License#is required. Firm(Business)Name Licensee* License#* License Expiration Date* License Type* License Active License Status Mailing Address JAMES M TESTA CS-054718 06/08/2018 Construction Supervisor O Active N ANDOVER MA 01845 Preferred Telephone#:* Alternate Phone# Email 9786822023 1 certify,under the pains and penalties of perjury,that the information on this application is true and complete. IR Project Information Persons contracting with unregistered contractors do not have access to the guaranty fund. Fee Schedule: Building Permit: Project Cost(if new construction base on $125 per square foot and if addition/alteration/renovation base on actual contract price). ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector. Type of Improvement* Proposed Use* Description of Work to be Performed* Is property on Town water* Is property on Town sewer Alteration One-Two Family 1 Yes No Project Cost(if new construction base on$125 per square foot and if addition/alteration/renovation base on actual contract price)" 47,790 Does this project require a temporary construction trailer? NO Does this project require a temporary construction sign? NO hftps://northandoverma.viewpointcloud.com/#/records/24464 3/5 5/5/2017 "Building Permit#24464-V ewPoint Cloud Danger Zone Literature(MGL CHapter 166 Section 21A-F and G min.$100-$1,000 fine) NO Registered Design Professional Architect/Engineer Name Architect/Engineer Address Architect/Engineer Phone Number Architect/Engineer Reg.# Insurance INSURANCE COVERAGE: I have a current liability insurance policy or its substantial equivalent. Yes If yes,indicate the type of coverage* If other,specify Liability Worker's Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers To be filed with the permitting authority Are you an employer?Select the appropriate type.Any applicant that selects#1 must also fill out the section below showing their workers'compensation policy information. 2. 1 am a sole proprietor or partnership and have no employees working for me in any capacity.(No workers'comp. insurance required). Type of project* 8. Remodeling Workers' Compensation Affidavit Signature hftps://northandoverma.viewpointcloud.com/#/records/24464 4/5 5/5/20 17 *Building Permit#u#n4 wewPnmQmm /uohereby certify under the pains and penalties mperjury that the information provided above istrue and correct. ~ RV igTo Be Completed By Town Staff la Zoning District~ la|sthis a1onYear n,older structure~ la|sproperty within anOverlay District~ |sthe property within the Floodplain~ |sthe project within 1on'of Wetlands?~ R2 No No No No mps://northandovermumewpointc|oud.com/#"/rmmrds/24464 5/5