NOTICE OF DECISION ;SAS I.4C"U S E 1,`
SITE PLAN REVIEW SPECIAL PERMIT
Any appeal shall be filed
within(20)days after the
date of filing this notice in
the office of the Town Clerk.
Date: November 18,2014
Public Hearings: October 21,2014;November
18,2014
Date of Decision:November 18,2014
Petition of: Great Circle LLC
8 Washington Street
Beverly,MA 01915
Premises Affected: Appx. 85 Terminal Road,Leased Lot on Lawrence Municipal Airport
492 Sutton Street
Assessors Map OOOO.B,Parcel 1
North Andover,MA O 1845
The above petition for a Site Plan Review Special Permit is in accordance with the requirements of the North
Andover Zoning Bylaw, Sections 8.3 and 10.3,and MGL C.40A, Sec.9.
This petition is to allow for the construction of a box-style,2-story, 17,388 square foot airplane hangar at the
Lawrence Municipal Airport. The hangar will house up to three(3)private planes for personal and corporate
use by the Applicant,and will be constructed on a 48,800 square foot lot to be ground-leased from the Airport
Commission. The site is located within the Industrial-2 Zoning District. The application was submitted by
Glovsky&Glovsky,LLC.on behalf of the Applicant,Great Circle Center LLC.,with plans dated September
19,2014,revised November 6,2014,and prepared by Meridian Associates.
After a public hearing given on the above dates,and upon a motion by David Kellogg, seconded by Lynn
Rudnicki,the Planning Board APPROVES the Site Plan Review Special Permit as amended and with
conditions.A vote of 5-0 was made in favor of the application.
i
^ 1 4,h,- I
On behalf of the No dover Planning Board
John Simons,Chair
Michael Colantoni
David Kellogg
Lora McSherry
Lynne Rudnicki
Peter Boynton,Associate
1
Town of North Andover
Site Plan Review Special Permit—85 Terminal Road
- November 18,2014
The Planning Board herein APPROVES/DENIES the Site Plan Review Special Permit for the
construction of one new airport hangar at the Lawrence Municipal Airport with accompanying access
road and ten(10)parking spaces.The hangar will also contain an accessory office space. The application
was filed with the Planning Board on September 22,2014.The public hearing on the above referenced
application was opened on October 21,2014, and closed on XXX. The applicant submitted a complete
application,which was noticed and reviewed in accordance with Sections 8.3 and 10.3 of the Town of
North Andover Zoning Bylaw and MGL C.40A, Sec. 9.
The Planning Board makes the following findings as required by the North Andover Zoning Bylaw,
Sections 8.3 and 10.3.
FINDINGS OF FACT:
1) The specific site is an appropriate location for the project as it is located in the Industrial-2 Zoning
District and is located within the Lawrence Municipal Airport's existing footprint.
2) The Applicant anticipates approximately 100 flights annually out of the Lawrence Municipal Airport.
Given the existing volume of flights at the airport,this use, as developed,will not adversely affect the
neighborhood.
3) There will be no nuisance or serious hazard to vehicles or pedestrians.
4) Adequate and appropriate facilities will be provided for the proper operation of the proposed use. The
hangar will use water and sewer provided by the Town of North Andover.
5) This Special Permit Granting Authority makes a specific finding that the use is in harmony with the
general purpose and intent of the Zoning Bylaw.
6) The proposed project includes the construction of ten(10)parking spaces immediately adjacent to the
hangar. This number of spaces is sufficient given that the primary expected use of the airport hangar
is for storage of aircraft, which would not likely require a high volume of guest parking spaces;
additional parking spaces are located on-site at the Lawrence Municipal Aiport.
7) The Applicant shall comply with all applicable regulations associated with facilities on airport lands,
including FAA and local airport regulations.
8) The Town of North Andover Fire Department has reviewed the proposal and determined that the
proposed site affords adequate access and egress in an emergency.
9) The North Andover Zoning Board of Appeals is requiring the Applicant to apply for a zoning
variance because the dimensions of the proposed hangar as it relates to the dimensions of the leased
space would not be compliant with the North Andover Zoning Bylaw.
10) The proposed stormwater infrastructure has been independently reviewed and is sufficient. Post-
construction stormwater infrastructure maintenance will be the responsibility of the Applicant and/or
all lease successors or owners of land.
Finally, the Planning Board finds that this project generally complies with the Town of North Andover
Zoning Bylaw requirements as listed in Section 8.3,but requires conditions in order to be fully compliant.
The Planning Board hereby grants an approval to the Applicant,provided the following special conditions
are met.
2
Town of North Andover
Site Plan Review Special Permit—85 Terminal Road
November 18,2014
PERMIT DEFINITIONS
1) The "Locus" refers to the approximately 1.1-acre parcel of leased land at the Lawrence Municipal
Airport at approximately 85 Terminal Road,referenced on Assessor's Map OOOO.B,Parcel 1.
2) The "Plans" refer to the plans entitled "Site Development Plans, 85 Terminal Road", prepared by
Meridian Associates, dated September 19,2014 and revised November 6,2014.
3) The"Project"refers to the construction of an airport hangar, including construction of an access road,
installation of utilities, installation of stormwater management infrastructure, and construction of ten
(10)new parking spaces.
4) The "Applicant" refers to Great Circle Center LLC., the applicant for the Site Plan Review Special
Permit.
5) The "Project Owner" refers to the person or entity holding the fee interest to the title to the Locus,
which can include but is not limited to the Applicant,developer, and/or owner.
SPECIAL CONDITIONS
Upon reaching the above findings,the Planning Board approves this Definitive Subdivision Plan with the
following conditions:
PRIOR TO ISSUANCE OF A BUILDING PERMIT
1) The Plans and this Notice of Decision must be recorded at the Essex North Registry of Deeds. Two
(2) copies of the signed and recorded Plans and Notice of Decision must be delivered to the Planning
Department.
2) A Performance Guarantee bond in the amount of$3,000 shall be posted for the purpose of insuring
that the site is constructed in accordance with the approved plans and that a final as-built plan is
provided.
PRIOR TO THE START OF CONSTRUCTION
3) In consultation with the Town Planner, the Applicant shall designate an independent construction
monitor. The monitor shall make weekly inspections of the project, provide monthly reports to the
Planning Department, and detail any areas of non-compliance and corrective actions. The monitor
will also provide reports following heavy rain events. The monitor must also be available upon notice
to inspect the site accompanying a Planning Department designated official.
4) A construction schedule shall be submitted to the Planning Department for the purposes of tracking
major milestones and general construction.
5) A pre-construction meeting must be held with the developer, contractors, Planning Department,
Applicant, and other applicable representatives to discuss.scheduling of inspections and construction
schedule.At this same meeting,the activities for conditions 6 and 7 below may be also conducted.
6) Yellow "Caution"tape must be placed along the limit of clearing and grading as shown on the plan.
The Planning Department must be contacted prior to any initial cutting and/or clearing on-site.
Existing trees that will remain in the landscaped area are to be marked.
7) All applicable erosion control measures must be in place and reviewed and approved by the Planning
3
Town of North Andover
Site Plan Review Special Permit—85 Terminal Road
November 18,2014
Department.
8) The Applicant shall provide the Planning Department of evidence of filing and approval of the EPA
General Construction Permit(GCP)for this project.
DURING CONSTRUCTION
9) Any stockpiling of materials must be maintained using all relevant Best Management Practices
(BMPs)including covering of loose stockpiles and/or implementing dust mitigation measures.
10)It shall be the responsibility of the Applicant to ensure that no erosion from the site of construction
shall occur which will cause the deposition of soil or sediment upon adjacent properties or public
ways, except as normally ancillary to off-site sewer or other off-site construction. Off-site erosion
will be a basis for the Planning Board to make a finding that the project is not in compliance with this
Notice of Decision, and the board shall give the developer written notice of any such finding and
provide ten(10)days to implement corrective actions.
11) In an effort to reduce noise levels, the developer shall keep in optimum working order, through
regular maintenance,any and all equipment that shall emanate sounds from the construction site.
12) Hours of construction are limited from 7:00am to 5:00pm Monday through Friday, and 8:00am to
5:00pm on Saturdays.
PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY
13) The Applicant must submit a letter from the architect or/and engineer of the project stating that the
building and site layout substantially comply with the approved Plans. Alternatively, the applicant
may provide a bond, determined by the Planning Board, to cover the full amount of the landscaping
materials and installation if weather conditions do not permit the completion of the landscaping prior
to use of the building.
14) It shall be the Applicant's responsibility to assure the proper placement of driveways. The Planning
Board requires any driveway to be moved at the owner's expense if such driveway is at a catch basin
or stone bound position.
15)All slopes must be stabilized with regard to erosion and safety.
16) The lot must be raked, loamed, and seeded, sodded or mulched.
17) The Planning Board reserves the right to review the site after construction is complete and require
additional site screening as it deems necessary and reasonable.
PRIOR TO THE RELASE OF SECURITY AND/OR ESCROWED FUNDS
18)A final set of as-built plans showing final topography, location of utilities, structures, drainage
facilities, and easements must be submitted to the Planning Department. Plans shall show all relevant
site elements including but not limited to stormwater infrastructure, landscaping, building footprints,
impervious and pervious surfaces, sewer and water connections, and other pertinent site features. One
paper copy and one electronic copy (PDF) shall be submitted to the Planning Department. If over 1
year has elapsed from the issuance of the Certificate of Occupancy, the applicant must submit a
second letter from the architect and/or engineer verifying that the on-site conditions still substantially
comply with the approved Plans.
4
Town of North Andover
Site Plan Review Special Permit—85 Terminal Road
November 18,2014
19) The Planning Board must by a majority vote make a finding that the site is in conformance with the
approved plan.
20) The Town Planner shall verify that all Planning, Conservation, Board of Health, and Division of
Public Works requirements are satisfied and that construction was in compliance with all respective
approved plans and conditions.
GENERAL CONDITIONS
21) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
22) Gas, telephone, cable, and electric utilities shall be installed underground as specified by the
respective utility companies.
23) The provisions of this conditional approval shall apply and be binding upon the Applicant, its
employees, and all successors and assigns in interest or control.
24)Any action by a town board, commission, or department which requires changes in the plan or design
of the building, as presented to the Planning Board, may be subject to modification by the Planning
Board.
25)Any revisions shall be submitted to the Town Planner for review; if the revision is deemed
substantial,the Applicant must submit revised plans to the Planning Board for approval.
26) This Site Plan Review Special Permit shall be deemed to have lapsed on November 18, 2016 (two
years from the approval date), exclusive of the time required to pursue or await determination of any
appeals, unless substantial use or construction has commenced within said two-year period or for
good cause as determined by the Planning Board.
27) The following information shall be deemed part of this decision:
Plans Titled: Site Development Plans, 85 Terminal Road
North Andover,MA 01845
Prepared for: Great Circle Central LLC.
54 Logan Lane,Unit C
Santa Rosa Beach,Florida 32459
Prepared by: Meridian Associates
500 Cummings Center,Suite 5950
Beverly,MA 01915
Scale: 1"=200'
Date: September 19,2014 revised November 6,2014
Sheets: 1-10
5
Town of North Andover
Site Plan Review Special Permit—85 Terminal Road
November 18,2014
cc: All Town Departments
Applicant
Engineer
Abutters
Assessor
6
Town of North Andover
ZONING BOARD OF.APPEALS
Albert P.Manzi III,Esq.Cbairman
Men P McIntyre,� Vice-chairman RTH .2915TER 3 *
Aicbardj-Byers,Esq.Clerk of tkO +
D.FaulKochjr.Esq.
0
Allan Cuscia
Ja
Associate Members
Michael A Liporto
DeneyMorganthal
DougLudg:in ACHUS Town Clerk Time Stamp
Any appeal shall be filed within Notice of Decision
(20)days after the date of filing Year 2015
of this notice in the office of the
Town Clerk per Mass.Gen.L.ch.40A,§17 Property at: 85 Terminal Road(Lawrence Municipal Airport)
NAME:Great Circle Central LLC HEARING(S): October 14,2014 and December 9,2014,The
following continued Hearings were continued at the request of the
Petitioner,November 13,2014,Januaryl.3,2015
ADDRESS: 85 Terminal Road(Map 000.B,Parcel 0001), PETITION: 2014-008A&2014-008B
(Lawrence Municipal Airport)
North Andover,MA.01845 1 1
The North Andover Board of Appeals held a public hearing at Town Hall,at 120 Main Street,North Andover,MA on Tuesday,
February 10'h,2015 at 7:30 PM on the application of Great Circle Central LLC located at 85 Terminal Road (Map 0003,Parcel
0001), North Andover, MA 01845. Petitioner was requesting a Variances and a Special Permit for construction of a new
airplane hangar in the 1-2 Zoning District.
A Special Permit from the Zoning Board of Appeals under Section 9,Paragraph 9.1 of the Zoning Bylaw for non-conforming use
was needed(airport)in the Industrial-2 Zoning District.
Petitioner was also requesting a Dimensional Variance that was also required from the Zoning Board of Appeals under Section 7,
Paragraph 7.3&Table 2 of the Zoning Bylaw for all setbacks from lease lines in order to construct a new airplane hangar.Also
lot area was insufficient.
The Petitioner of Great Circle Central LLC at 85 Terminal Road(Map 000.11,Parcel 0001),North Andover,MA 01845 has now
requested the petitions be"Withdrawn Without Prejudice"
The following voting members were present: Albert P.Manzi,Ellen P.McIntyre,Richard J.Byers,D.Paul Koch Jr and Allan
Cuscia. The following Associate members was present:Doug Ludgin
Koch made a motion to allow for the respective petitions to be"Withdrawn Without Prejudice",for Great Circle Central LLC,for
location at the Lawrence Airport,address 85 Terminal Road(Map 000.13,Parcel 001).
Cuscia second the motion
The following members voted in favor to Grant the petitioner to"Withdraw without Prejudice",McIntyre,Byers,Koch and
Cuscia
Not in favor to Grant the Petitioner to"Withdraw without Prejudice%Manzi.
4-1 Petition is withdrawn without prejudice.
Nort Andover Zoning oard of ppeals
Alb�rt P.Manzi 1111,Esq., Chairman
Ellen P.McIntyre, Vice Chairman
11chard J.Byers,Esq.,Clerk
D.Paul Koch Jr.
Allan Cuscia.
2014-008A.
2014-008B
Page 1 of 1