Loading...
HomeMy WebLinkAboutConservation Permit # 12/4/1997 .11 f1 CMR 10.99 _ p ,Fgr•rTr�. _ r 3 DEP Ra Na. I NACC err 7 .� .'. f ro cm cxwasM7 tY uep) CommonwealthCdy,Town Norl� Andover of Massachusetts Eight.Meadows Realty Trust EF. Order of C'anditions Massachusetts Wetlands Protection Act G.L. c. 1-31-, §40 and under- the ra" af. North Andoverrs bylaw Cl;apter'..178 From NORTH ANDOVER CONSERVATION COtLMISSION TO Eight Meadows Realty Trust Same (Name of Applicant) (Name of properly owner) 700 Great Pond- Road No.. Andover, MA 01.845 — 1`-,dress - Address :. This Order is-issued-and delivered as follows: /by by hand-delivery to applrcant or rep reseFlalive on fdalsj by certified-mail, return receipt requested-on December 4, 1997 This project is locatedat_..... Lot _3 saile way The property iarecorded at the Registry 01_____Norr_liern F•_sse� Book 3315- Page 295 Certilicate:(if registered) The Notice.of Intent for this project was filed an October 6, 1997 ldatel November 19, 1997 The public hearing was closed on (dale) Findings The Andover Canservaticn Commission has reviewed the above relnre,iced rlalice o! Intent and plans and has held a public hearing on the project. Based on the infarmatron availaote Ic Me . NACC at this time. the SIA('('. - . � ,rt• Nis deternmied Hmt the area an which the,proposed work is to to done is significant to the following inleresls in accorcance v.ilh the Presumptions of Si nifica ce a in the re u,latrons far each Area Subject io Prolec;iori Under the g g. si� Recreation Act (check as anprcQriate): Ch U8 : Prevention .of Erosion & Sedimentation Ch. 174f WildILLe Putiic water supply Flood coniral containing shellfish Private water supply Storm damage prevention i Fisheries Ground water supply Prevention of pollution PW� Prolection of wildlile Habitat' Total Filing Fee Submitted $25.00 State Share $0,00 Cily/Tewn Share $25.00 (Vler, in r?xccss at S?31 Total Refund Due S City/Town Portion S State Pariiari S ('/z total) (Yz to(al) . NACC#7 Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of-Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS _ 1. Failure to comply with all conditions stated herein,.and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. _. 2. -This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the-right to enter and.inspect-the property at all reasonable times, until a Certificate.of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act, the North Andover Wetland ByLaw and Regulations, 310.CMR 10.00, and may require a any information, measurements, photographs;"observations, and/or materials, or may require the submittal of any data or information deemed 6 necessary by the NACC for that evaluation. Further,work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply, and has so notified the applicant in writing. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. "o 4. The work authorized hereunder shall be completed within three years from the date of this order. 5. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section VIII (p.15) of the North Andover Wetland Regulations). 3 CAWinword1000NACC#Tdoc I NACC 1214197 3 3 NACC##7 6. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information is so warrant. 7. Where the Department of Environmental Protection (DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department.. 8. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, itsemployees and all successors and assigns in interest or i control. These,obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 9. The term "Applicant' as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intentr.supporting documents and this Order of Conditions. The NACC.shall be notified.in writing within 30 days of all transfers of title of any-portion of property that takes place prior to the issuance of a Certificate of Compliance. 10. The proposed work.includes- Construction of a single family dwelling within.the Buffer Zone of an isolatedwetland subject to protection under the North Andover Wetland Bylaw and Regulations. 1 i' C:1Winword100C\NACC V-doc 2 NACC 1214197 NACC #7 11. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): Notice of Intent filed by: Eight Meadows Realty Trust DATED 10/6/97 Plans prepared by: Civil Construction Management,inc. Entitled "Lot#3 Great Pond Estates" DATED 1012/97 12. The following wetland resource areas are affected by the proposed work- Buffer Zone to Freshwater Wetland. These resource areas area significant to the interests of the Act and Town ByLaw as noted above. These resource areas are also significant to the recreational, and wildlife interests of the` ByLaw. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. I 13. The NACC agrees with the applicant's delineation of the wetland resource --.. areas on the site as shown on the plans dated 10/2,/97 Prior to the issuance of a Certificate of Compliance, the applicant will submit a plan showing the 9 site's wetland delineation at a scale identical to the Town wetland map-for athis location. - s 3 14. The NACC finds that the intensive use of the upland areas and:buffer zone proposed on this site will cause further alteration of the wetland resource d areas. In order to prevent any alteration of wetland resource areas a twenty u five foot (25') No-Disturbance Zone and a fifty foot(50') No-Construction Zone shall be established from the edge of the adjacent wetland resource area eexcept where otherwise indicated on the plan referenced under Condition #11. The Conservation Administrator and/or other agents of the NACC do y not have the authority to waive these setbacks as established under the-focal e bylaw. No disturbance of existing grade, soils or vegetation is permitted in 0 the No-Disturbance zone. (See Appendix 5 of the local Regulations). 15. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. y 'i CAWinword100CINACC#7.doc 3 NACC 12/4197 3': NACC#7 PRION.TO'CONSTRUCTION 16. No work shall be undertaken until, all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 17. s Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken un ' einar er as been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land,_the Final Order shall also be noted in the Registry's Grantor Index under the name-of the owner of the land upon which the proposed work is to be done. Ih.the case of registered land,. the Final Order-shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation.Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. - 18. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "NACC #7". 19. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicantshall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC. 24. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of 0 1 CAWinword100CINACC#7,doc 4 NACC 1214197 I i I NACC#T Conditions and referenced documents before commencement of construction. 21.. Prior to any work on-site the applicant shall submit to the NACC for approval a sequencing plan for construction. 22. Wetland flagging shall be checked prior to start of construction and shall be _... re-established where missing so that erosion control measures can be properly placedand wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with stakes or flags and shall be - _- confirmed by the NACC.. Such markers shall be checked and replaced as _ necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery _. or materials,'stockpiling of soil, or construction activity is to occur beyond this line atany time:..All flags used for the-above purposes shall be of a color different from-other flagging used on the site: -- gg� g ... 23. A row of staked hay bales backed by trenched siltation fence shall be placed betweerrall construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC -- prior to the start of construction and shall remain intact until all disturbed areas have been permanently-stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any -= noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures maybe required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commission's request. 24. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of twenty (20) hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems, and shall not be used for the normal control of erosion. - 25. A check payable to the Town of North Andover shall be provided in the amount of$4,000 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall CAWinword100CINACC#7.doc 5 NACC 1214197 I _ NACC #7 e be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provision, satisfactory to the NACC, has been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACCs review and approval. This condition is issued under the authority of the local ByLaw. 26. The applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with-an NACC representative, the contractor, the engineer, and the applicant.to_ ensure that all.of the Conditions of this Order are understood. This Order, shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the periri:itked work are fully aware of tH6 permit's terms and conditions. Thereafter;.the contractor will be held jointly liable for any violation of this Order of - Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity_of the on-site construction supervisor hired to coordinate construction and,to ensure. compliance with this Order. A reasonable period of time shall be provided_ as notice of the pre-construction meeting (e.g. 72 hours). DURING CONSTRUCTION 27. Upon begriming work, the applicant shall submit written progress reports every two (2) months detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 28. Any fillused in connection with this project shall be clean fill, containing no trash, refuse rubbish or debris, including but not limited to lumber, bricks, plaster, wire,lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the foregoing. 29. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC. 30. No regrading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. Q%Winword1000WACC#7.doc 6 NACC 1214197 NACC#7 31. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. 32. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. 33. All waste_generated by; or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall-be no burying of spent construction materials or disposal of waste on the site-,by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. 34. Accepted engineering And construction-standards and procedures shall be followed a—tlze completion of the project: 35. During andafterwork on this project, there shall be no discharge or spillage of fuel, or other%pollutants into any wetland resource area. 1f there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are tb be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. I C:1Winword\000WACC V.doc 7 NACC 12/4/97 i NACC ##7 AFTER CONSTRUCTION 36. No underground storage of fuel oils shall be allowed on any lot within one- hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions, and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland protection Bylaw. -----37. Fertilizers utilized for landscaping and lawn care shall be slow release, low- nitrogen types, and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. Thiscondition is issued under the authority of the Town's Wetland Protection ByLaw and shall remain in perpetuity. 38. Upon completion of construction and grading, all disturbed areas located 9 outside resource areas shall be stabilized permanently against erosion. This shall be done either by loaming and seeding according to SCS standards. If �._ the latter course is chosen, stabilization will be considered complete once -- p _ vegetative cover has been achieved. o 9 p 39. Upon,completion of the project, the applicant shall submit a letter to the NACC from a Registered Professional Civil Engineer certifying compliance with this Order of Conditions and the approved plans referenced herein (or approved revisions). Certification includes, but is not limited to, verification that the limit of work coincides with the approved "NO- DISTURBANCE/NO-BUILD" NO-DISTURBANCE/NO-BUILD" zones. A stamped "As-Built" topographic plan of all areas within the jurisdiction of the Wetlands Protection Act and ByLaw shall be submitted when a Certificate of Compliance is requested. This plan will include: a) "As-Built' elevations of all drainage structures constructed within 100 feet of any wetland resource area; b) "As-Built' elevations and grades of all filled or altered wetland resource areas; c) Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, stone walls, pools, retaining walls, and approved decl<s; CAWinword100C\NACC#7,doc $ NACC 1214197 y' I: I NACC #7 d) A line showing the limit of work. "Work" includes any disturbance of soils or vegetation; e) Location of all subsurface utilities entering the property; f) Location of existing erosion controls. 40. Furthermore, the following information must be submitted to the NACC when requesting a Certificate of Compliance: a) The name and address of the current landowner; b) The name and address of the individual/trust or corpordtion to whore the compliance is to be granted; c) The streetaddress and assessor's map/parcel number for,-the project; d) The DEP file number, e) A statement certifying compliance with the Order of Conditions and approved plans. 41. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: • 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas except in those locations approved under NACC #7. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC (refer to Section XI(page 18) of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local Bylaw; • Discharge or spillage of pollutants (Condition #35); • Prohibition of underground fuels (Conditioi6#36); • Limitations on the use of fertilizers, herbicides, road salts, de-icing compounds and pesticides (Conditions #37). CAWinword10001NACC#7.doe 9 NACC 1214197 I _. .. NACC #7 i Issued By NOR DOVE Conservation Commission Signature(s) r This Order must be signed by armajority of the Conservation Commission. On this 3rd day of December 19 97 before me personally appearett Joseph W. Lynch, Jr. to me known to be the person described in and who-executed the foregoing instrument and acknowledged that he/she executed the same as his/her free ac.t and deed. J December 11, 2003 Notary PublicMy commission expires The applicant,the owner,any person aggrieved by this Ordar, any owner at land abutting the land upon which the proposed work Is to be. done or any len residents of the city or town in which such land is located are hereby notified of their righl to request the Department of Environmental Qualily'Engineering to issue a Superseding Order,providing the request is made by certilied mail or hand delivery la the Department,with the appropriate filing fee and Fee Transmittal Form as provided in 010 C41A 10.05(7),wilhin len days from Ifie data of issuance of this Order.A copy of the request shall at the same time be sent by cer6had mail or hand delivery la the Conservation Commission and the applicant, If you wish to appeal this decision under the Town Bylaw, a complaint must be filed in Superior Court. in accordance with M.G.L. Chapter 249, S.4 RECORDING INFORMATION: North Andover Conservation Comm. riot to commencement of work, Detach on dotted line and submit to the —prior .....................:............................................................................................................................................. North Andover Conservation Commission, 120 Main St. , North Andover A 018/5 To ssumg AuI ority Ptease be advised that the Order of Conditions for the project a1 File Number 242 has been recorded at the Regisiry of Deeds , Northern Essex and has been noted in the chain of title of the alfected property in accordance with General Condition 8 an__ t 9 If recorded land, the instrument number which identifies this transaction is It registered land, the document number which identifies this Iransaction is_ _---- - — I Apniican I Signature i . 5.4A