HomeMy WebLinkAboutConservation Permit # 11/22/2006 utr me v4wimn
Bureau of Resource Protection- Wetlands
NACC # 10
WPA Form 5 - Order of Conditions
for DEP use onlyAndove
North r Wetland
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Protection Bylaw. .
Applicant Information
From: The Notice of Intent for this project was filed on:
North Andover December 8, 2000
Cor wvation commission Date
For: The public hearing was closed on:
NACC # 10 December 20, 2000
Prjcrt file Numbe- We
To:
Eight Meadows Realty Trust Title and Date of final Plans and Other Documents:
AppficantName Notice of Intent dated December 8,
700 Great Pond Road
MailingAddtess 2000 and Plans entitled "Lot 6 Great
North Andover
CkylTown Pond Estates" dated 9/27/00
MA 01845
state Zip code REV 12/7/00
The project site is located at: 1 1 e 2 2_2 0 0 6 & 12C 13 c:p
North Andover
aty/fown
63 49
ImessorsMap/Plat/ RraAotl A prpLL S1r:
and.the property is recorded at the Registry of Deeds for: A"'rale COPY
;klw O L4- a-
Essex 3315 295 Town Clerk
Carrly Book Page
--- - - - ---Cetifiate{fregistered-land)
Findings
Furthermore,this Commission hereby finds that the project,as
Findings pursuant to the Massachusetts Wetlands proposed,is:
Protection Act: (check one of the following boxes)
Following the review of the above-referenced Notice of Intent Approved subject to:
and based on the information provided in this application and
presented at the public hearing,this commission finds that the the following conditions which are necessary,in accordance
area in which work is proposed is significant to the following with the performance standards set forth in the wetlands
interests of the Wetlands Protection Act(check all that apply): regulations,to protect those interests checked above. This
Commission orders that all the work shall be performed in
M Public Water Supply accordance with the Notice of Intent referenced above,the
®Private Water Supply following General Conditions,and any other special
E Groundwater Supply conditions attached to this Order.To the extent that the
g Flood Control following conditions modify or differ from the plans,
❑Land Containing Shellfish specifications,or other proposals submitted with the Notice
57 Fisheries of Intent,these conditions shall control.
E Storm Damage Prevention
7 Prevention of Pollution
7 Protection of Wildlife Habitat
n..,..., -cc
Bureau of Resource Protection— Wetlands NACC # 10
WPA Form 5 - Order of Conditions and North Andover Wetland
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Protection Bylaw.
Findings (cont.)
debris,including but not limited to lumber,bricks,plaster,
Denied because: wire,lath,paper,cardboard,pipe,tires,ashes, refrigerators,
motor vehicles,or parts of any of the foregoing.
O the proposed work cannot be conditioned to meet the
performance standards set forth in the wetlands regulations 7. This Order does not become final until all administrative
to protect those interests checked above. Therefore,work appeal periodsfrom this Order have elapsed,or if such an
on this project may not go forward unless and until a new appeal has been taken,until all proceedings before the
Notice of Intent is submitted which provides measures Department have been completed.
which are adequate to protect these interests,and a final
Order of Conditions is issued. 8. No work shall be undertaken until the Order has become
final and then has been recorded in the Registry of Deeds or
0 the information submitted by the applicant is not sufficient the Land Court for the district in which the land is located,
to describe the site,the work,or the effect of the work on within the chain of title of the affected property. In the case
the interests identified in the Wetlands Protection Act. - of recorded land,the Final Order shall also be noted in the
Therefore,work on this project may not go forward unless Registry's Grantor Index under the name of the owner of the
and until a revised Notice of Intent is submitted which land upon which the proposed work is to be done. In the
provides sufficient information and includes measures case of registered land,the Final Order shall also be noted
which are adequate to protect the Act's interests,and a final on the Land Court Certificate of Title of the owner of the
Order of Conditions is issued. A description of the specific land upon which the proposed work is done. The recording
information which is lacking and why it is necessary is information shall be submitted to this Conservation
attached to this Order as per 310 CMR 10.05(b)(c). Commission on the form at the end of this Order,which
form must be stamped by the Registry of Deeds,prior to the
General Conditions commencement of the work.
1. Failure to comply with all conditions stated herein,and with 9. A sign shall be displayed at the site not less than two square
all related statutes and other regulatory measures,shall be feet or more than three square feet in size bearing the
deemed cause to revoke or modify this Order. words,
2. The Order does not grant any property rights or anyl
exclusive privileges;it does not authorize any injury to NACC # 10'
private property or invasion of private rights.
Project file Number
3. This Order does not relieve the permittee or any other
person of the necessity of complying with all other
applicable federal,state,or local statutes,ordinances, 10.Where the Department of Environmental Protection is
bylaws,_or-regulations. _ __-_ - - requestedto-issue-a Superseding-Order,the-Conservation
Commission shall be a party to all agency proceedings and
4. The work authorized hereunder shall be completed within hearings before the Department.
three years from the date of this Order unless either of the
following apply: 11.Upon completion of the work described herein,the applicant
(a)the work is a maintenance dredging project as provided shall submit a Request for Certificate of Compliance(WPA
for in the Act;or Form 8A)to the Conservation Commission.
(b)the time for completion has been extended to a
specified date more than three years,but less than five 12.The work shall conform to the following attached plans and
years,from the date of issuance. If this Order is intended special conditions:
to be valid for more than three years,the extention date
and the special circumstances warranting the extended Final Approved Plans(attach additional plan references as
time period are set forth as a special condition in this needed):
Order. Plans Entitled "Lot 6 Great Pond "
5. This Order may be extended by the issuing authority for ride
one or more periods of up to three years each upon 9/27/00 REV 12/7/00
application to the issuing authority at least 30 days prior to pared
the expiration date of the Order. Dennis G. Quintal, P.E.
6. Any fill used in connection with this project shall be clean Signed and Stamped by
fill. Any fill shall contain no trash,refuse,rubbish,or NACC
on 61e with
_._------
Bureau of Resource Protection- Wetlands NACC # 10
WPA Form 5 - Order of Conditions and North Andover Wetland
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Protection Bylaw.
Findings (cont.)
Findings as to municipal law, bylaw,or ordinance
13.Any changes to the plans identified in Condition#12 above Furthermore,the
shall require the applicant to inquire of the Conservation North Andover
Commission in writing whether the change is significant
enough to require the filing of a new Notice of Intent. Conservation commission
hereby finds(check one that applies):
14.The Agent or members of the Conservation Commission
and Department of Environmental Protection shall have the ❑ that the proposed work cannot be conditioned to meet the
right to enter and.inspect the area subject to this Order at standards set forth in a municipal law,ordinance,or bylaw,
reasonable hours to evaluate compliance with the condi- specifically
tions stated in this Order,and may require the submittal of
any data deemed necessary by the Conservation Commis-
sion or Department for that evaluation. Name and dation of municipal law,bylaw,or ordinance
15.This Order of Conditions shall apply to any successor in Therefore,work on this project may not go forward unless
interest or successor in control of the property subject to and until a revised Notice of Intent is submitted which
this Order and to any contractor or other person perform- provides measures which are adequate to meet these
ing work conditioned by this Order. standards,and a final Order of Conditions is issued.
16.Prior to the start of work,and if the project involves work J0 that the following additional conditions are necessary to
adjacent to a Bordering Vegetated Wetland,the boundary of comply with a municipal law,bylaw,or ordinance,specifi-
the wetland in the vicinity of the proposed work area shall ally
be marked by wooden stakes or flagging. Once in place, Ch.178 of the Code of North Andover
the wetland boundary markers shall serve as the limit of Name and dtation otmumcipallaw,bylaw,oradinance
work(unless another limit of work line has been noted in
the plans of record)and be maintained until a Certificate of
Compliance has been issued by the Conservation Commis- The Commission orders that all the work shall be performed
sion. in accordance with the said additional conditions and with
the Notice of Intent referenced above. To the extent that the
17. All sedimentation barriers shall be maintained in good following conditions modify or differ from the plans,
repair until all disturbed areas have been fully stabilized specifications,or other proposals submitted with the Notice
with vegetation or other means. At no time shall sediments of Intent the conditions shall control.
be deposited in a wetland or water body. During construc-
_ -- - ----tion,the-applicant-or-hWherdesignee_shall-inspect-the
Additional conditions relating to municipal law,bylaw,or
erosion controls on a daily basis and shall remove
accumulated sediments as needed. The applicant shall ordinance:
immediately control any erosion problems that occur at the See attached Conditions
site and shall also immediately notify the Conservation
Commission,which reserves the right to require additional
erosion and/or damage prevention controls it may deem
necessary.
Special Conditions(Use additional paper if necessary)'
. See attached Conditions
n �—fC
NACC#10
Therefore, the North Andover Conservation Commission(hereafter the
"NACC")hereby finds that the following conditions are necessary, in
accordance with the Performance Standards set forth in the State Regulations,
the local ByLaw and Regulations, to protect those interests noted above. The
NACC orders that all work shall be performed in accordance with said
conditions and with the Notice of Intent referenced below. To the extent that the
followiniz conditions modify or differ from the plans, specifications or other_
-roposals submitted with the Notice of Intent, the conditions shall control.
GENERAL CONDITIONS
1) Failure to comply with all conditions stated herein, and with all related
statutes and other regulatory measures, shall be deemed cause to revoke or
modify this Order.
2) This Order does not grant any property rights or any exclusive privileges; it
does not authorize any injury to private property or invasion of property
rights. However, the NACC, agent of the NACC or the Department of
Environmental_Protection(DEP)reserves the right to enter and inspect the
properly at all reasonable times until a Certificate of Compliance is issued,
to evaluate compliance with this Order of Conditions, the Act(310 CMR
10.00), the North Andover Wetland ByLaw and Regulations, and may require
any information,measurements, photographs, observations, and/or
materials, or may require the submittal of any data or information deemed
necessary by the NACC for that evaluation. Further,work shall be halted on
the site if the NACC, agent or DEP determines that any of the work is not in
compliance with this Order of Conditions. Work shall not resume until the
NACC is satisfied that the work will comply and has so notified the applicant
in writing.
3) This Order does not relieve the permittee or any other person of the necessity
of complying with all other applicable federal, state or local statutes,
ordinances, by-laws or regulations.
4) The work authorized hereunder shall be completed within three years from
the date of this order.
5) This Order may be extended by the issuing authority for one or more periods
of up to one year each upon application to the issuing authority at least thirty
days (30) prior to the expiration date of the Order (Refer to Section VIII
(B)(p.33) of the North Andover Wetland Regulations).
NACC# 10
6) The NACC reserves the right to amend this Order of Conditions after a
legally advertised public hearing if plans or circumstances are changed or if
new conditions or information so warrant.
7) Where the Department of Environmental Protection(DEP)is requested to
make a determination and to issue a Superseding Order, the Conservation
Commission shall be a party to all agency proceedings and hearings before
the Department.
8) The conditions of this decision shall apply to, and be binding upon, the
applicant, owner,its employees and all successors and assigns in interest or
control. These obligations shall be expressed in covenants in all deeds to
succeeding owners of portions of the property.
9) The term "Applicant' as used in this Order of Conditions shall refer to the
owner, any successor in interest or successor in control of the property
referenced in the Notice of Intent, supporting documents and this Order of
Conditions. The NACC shall be notified in writing within 30 days of all
transfers of title of any portion of property that takes place prior to the
issuance of a Certificate of Compliance.
10)The proposed work includes: Construction of a single family dwelling
within the buffer zone to an isolated wetland subject to protection under
the North Andover Wetlands Protection Bylaw and Regulations.
11)The work shall conform to the following(except as noted in the remainder of
this document where revisions may be required):
Notice of Intent filed by: Eight Meadows Realty Trust
700 Great Pond Road
North Andover,MA 01845
Site Plans prepared by: Civil Construction Management,Inc.
8 Merrimac Road-Box 225
Newton,NH 03858
Dated 9/27/00 REV 11/`13/00 REV 12,/7/00
Stamped by Dennis G. Quintal,P.E.
CAWinword\OOC\NACC 4 10 2 NACC 01/03/2001
NACC# 10
12)The following wetland resource areas are affected by.the proposed work.-
Buffer
ork:Buffer Zone to a Freshwater Wetland. These resource areas are significant
to the interests of the Act and Town ByLaw as noted above and therein. The
applicant has not attempted to overcome the presumption of significance of
these resource areas to the identified interests.
13)The NACC agrees with the applicants delineation of the wetland resource
areas on the site as shown on the plans dated referenced herein.
14)The NACC finds that the intensive use of the upland areas and buffer zone
proposed on this site will cause further alteration of the wetland resource
areas. In order to prevent any alteration of wetland resource areas a twenty
five foot(25`) No-Disturbance Zone and a fifty foot(50`) No-Construction
Zone shall be established from the edge of the adjacent wetland resource
area. The Conservation Administrator and/or other agents of the NACC do
not have the authority to waive these setbacks as established under the local
bylaw. No disturbance of existing grade, soils or vegetation is permitted in
the No-Disturbance zone. (See Section III(D) &Appendix G of the local
Regulations).
15)There shall be no increase in the post development discharges from the storm
drainage system or any other changes in post development conditions that
alter the post development watershed boundaries as currently depicted in the
Notice of Intent and approved by this Order of Conditions, unless
specifically approved in writing by the Commission.
16)This document shall be included in all construction contracts, subcontracts,
- - -and specifications-dealing-with the work proposed and-shall-supersede any
conflicting contract requirements. The applicant shall assure that all
contractors, subcontractors, and other personnel performing the permitting
work are fully aware of the permits terms and conditions. Thereafter,the
contractor will be held jointly liable for any violation of this Order resulting
from failure to comply with its conditions.
CAWinword\OOC\NACC# 10 3 NACC 01/03/2001
NACC# 10
17)The owners of the project and their successors in title,in the event they
proceed to alter areas subject to the Commission's jurisdiction under the
order, agree that the Order does not in itself impose upon the Town any
responsibility to maintain the proposed drainage system and that said Town
shall not be liable for any damage in the event of failure. By acceptance of
this Order,the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on
this property pursuant to the Order. Issuance of these Conditions does not in
any way imply or certify that the site or downstream areas will not be subject
to flooding, storm damage or any other form of water damage. Maintenance
of the drainage system,if accepted by the Town as part of a public way,
becomes the responsibility of the Town.
18)Issuance of these Conditions does not in any way imply or certify that the site
or downstream areas will not be subject to flooding, storm damage or any
other form of water damage.
CAWinmrd\OOC\NACC# 10 4 NACC 01/03/2001
NACC#10
I F PRIOR TO CONSTRUCTION
19)No work shall be undertaken until all administrative appeal periods from
this Order have elapsed or, if such an appeal has been filed, until all
proceedings before the Department or Court have been completed.
20)This Order shall be recorded by the applicant at the Registry of Deeds
immediately after the expiration of all appeal periods. No work shall be
undertaken until the Final Order has been recorded in the Registry of Deeds
or the Land Court for the district in which the land is located, within the
chain of title of the affected property. In the case of recorded land, the Final
Order shall also be noted in the Registry's Grantor Index under the name of
the owner of the land upon which the proposed work is to be done. In the
case of registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is
to be done. The recording information shall be submitted to the North
Andover Conservation Commission on the form at the end of this Order
prior to commencement of the work. Any Order not recorded by the
applicant before work commences may be recorded by the NACC at the
applicant's expense.
21)A sign shall be displayed at the site not less than two square feet or more
than three square feet in size bearing the words "Massachusetts Department
of Environmental Protection, File Number NACC- '
'A
22)Any changes in the submitted plans caused by the applicant, another Board's
decision or resulting from this Order of Conditions must be submitted to the
NACC for approval prior to implementation. If the NACC finds said
changes to be significant, the NACC will call for another public hearing (at
the expense of the applicant).Within 21 days of the close of said public
hearing the NACC will issue an amended or new Order of Conditions. Any
errors found in the plans or information submitted by the applicant shall be
considered as changes. The proposed project may be still under review by
other local or state boards or agencies. This may result in changes to the
project plans or wetland impacts. If any such changes occur a revised plan
and an explanation of the revisions shall be submitted to the NACC for
review and approval prior to the start of construction. No work shall begin
on a project until written approval has been granted by the NACC.
CAWinword\OOC\NACC# 10 5 NACC 01/03/2001
NACC# 10
23)It is the responsibility of the applicant, owner, and/or successor(s)to ensure
that all conditions of this Order of Conditions are complied with. The project
engineer and contractors are to be provided with a copy of this Order of
Conditions and referenced documents before commencement of construction.
24)Prior to any work commencing on-site,the applicant shall submit to the
NACC for approval, a detailed sequence of construction, including the
construction of compensation and retention areas, installation of
sedimentation/erosion control devices and re-vegetation to be completed
before other work begins on-site.
25)Wetland flagging shall be checked prior to start of construction and shall be
re-established where missing. All wetland flagging shall remain visible and
enumerated per the approved plan(s)throughout the life of the project and
until a Certificate of Compliance is issued so that erosion control measures
can be properly placed and wetland impacts can be monitored. The
proposed limit of work shall be shall be clearly marked with stakes or flags
and shall be confirmed by the NACC. Such markers shall be checked and
replaced as necessary and shall be maintained until all construction is
complete. Workers should be informed that no use of machinery,storage of
machinery or materials, stockpiling of soil, or construction activity is to occur
beyond this line at any time. All flags used for the above purposes shall be of
a color different from other flagging used on the site.
26)A row of staked hay bales backed by trenched siltation fence shall be
placed between all construction areas and wetlands. The erosion control
barrier will be properly installed and placed as shown on the plans approved .
and referenced herein and shall be inspected and approved by the NACC
- prior to thestartof-construction-and-shall remain intact-until all disturbed -
areas have been permanently stabilized to prevent erosion. All erosion
prevention and sedimentation protection measures found necessary during
construction shall be implemented at the direction of the NACC. The NACC
reserves the right to impose additional conditions on portions of this project
to mitigate any impacts which could result from site erosion, or any
noticeable degradation of surface water quality discharging from the site.
For example, installation of erosion control measures may be required in
areas not shown on the plan(s)referenced in this Order of Conditions.
Should such installation be required by the NACC,they shall be installed
within 48 hours of the Commission's request
CAWinword\00C\NACC# 10 6 NACC 01/03/2001
NACC# 10
27)The applicant shall have on hand at the start of any soil disturbance,removal
or stockpiling, a minimum of 20 hay bales and sufficient stakes for staking
these bales (or an equivalent amount of silt fence). Said bales shall be used
only for the control of emergency erosion problems and shall not be used for
the normal control of erosion.
28)A check payable to the Town of North Andover shall be provided in the
amount of$3,000 which shall be in all respects satisfactory to Town Counsel,
Town Treasurer, and the NACC, and shall be posted with the North Andover
Town Treasurer through the NACC before commencement of work. Said
deposit of money shall be conditioned on the completion of all conditions
hereof, shall be signed by a party or parties satisfactory to the NACC, and
Town Counsel, and shall be released after completion of the project,
provided that provisions, satisfactory to the NACC,have been made for
performance of any conditions which are of continuing nature. The applicant
may propose a monetary release schedule keyed to completion of specific
portions of the project for the NACCs review and approval. This condition
is issued under the authority of the local ByLaw.
29)The applicant and/or the legal owner of that portion of land upon which
these Orders of Conditions have been placed shall provide to the NACC
prior to transferring,or assigning any portion of said land to another party,
subject to said Orders of Conditions,the"Compliance Certification Form
Affidavit"attached via"Appendix A" signed under the pains and
penalties of perjury,stating that said applicant and/or owner has read
these Orders of Conditions and is in compliance with each and every
condition. This document shall apply to each of the conditions referenced
herein and shall be provided to the Conservation Department at least five
- (5) business days prior to the-closing of said land transaction.
30)The applicant shall submit revised site plans incorporating Wetland Flag
A-14A into the wetland delineation.
CAWinword\000NACC# 10 7 NACC 01/03/2001
NACC# 10
31)Once these above mentioned pre-construction requirements are complete,
the applicant shall contact the Conservation Office prior to site preparation
or construction and shall arrange an on-site conference with an NACC
representative,the contractor,the engineer,wetland scientist and the
applicant to ensure that all of the Conditions of this Order are understood.
This Order shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any
conflicting contract requirements. The applicant shall assure that all
contractors, subcontractors and other personnel performing the permitted
work are fully aware of the permit's terms and conditions. Thereafter, the
contractor will be held jointly liable for any violation of this Order of
Conditions resulting from failure to comply with its conditions. The
applicant or contractor shall notify the NACC in writing of the identity of the
on-site construction supervisor hired to coordinate construction and to ensure
compliance with this Order. A reasonable period of time shall be provided
as notice of the pre-construction meeting (e.g. 72 hours).
CAWinword\OOC\NACC# 10 8 NACC 01/03/2001
NACC#10
DURING CONSTRUCTION
32)IMPORTANT: Immediately upon completion of the dwelling foundation,
and prior to further construction activities associated with the site,the
applicant shall complete a plan prepared by a Registered Professional Land
Surveyor of the Commonwealth(R.P.L.S.)which accurately depicts the
foundation location and ifs proximity to wetland resource areas as approved
under this Order of Conditions. Said.plan shall be submitted to the
Conservation Administrator for approval.
33)Upon beginning work,the applicant shall submit written progress reports
every week detailing what work has been done in or near resource areas, and
what work is anticipated to be done over the next period. This will update
the construction sequence.
34)Any fill used in connection with this project shall be clean fill, containing no
trash,refuse, rubbish or debris, including but not limited to lumber, bricks,
plaster,wire.,lath,paper,cardboard,pipe;tires, ashes,refrigerators, motor
vehicles or parts on any of the foregoing.
35)No exposed area shall remain unfinished for more than thirty (30) days,
unless approved by the NACC.
36)No re-grading in the buffer zone shall have a slope steeper than 2:1
(horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide
permanent stabilization.
37)There shall be no stockpiling of soil or other materials within twenty-five (25)
feet of any resource area.
38)[Washings from concrete trucks, or surplus concrete, shall not be directed to,
any drainage system, or wetland resource area.
39)All waste generated by, or associated with, the construction activity shall be
contained within the construction area, and away from any wetland resource
area. There shall be no burying of spent construction materials or disposal of
waste on the site by any other means. The applicant shall maintain
dumpsters (or other suitable means) at the site for the storage and removal of
such spent construction materials off-site. However,no trash dumpsters
will be allowed within 50'of areas subject to protection under the Act or
local ByLaw.
CAWinword\OOC\NACC# 10 9 NACC 01/03/2001
NACC# 10
40)Accepted engineering and construction standards and procedures shall be
followed in the completion of the project.
41)During and after work on this project, there shall be no discharge or spillage
of fuel, or other pollutants into any wetland resource area. If there is a spill
or discharge of any pollutant during any phase of construction the NACC
shall be notified by the applicant within one(1) business day. No
construction vehicles are to be stored within 100 feet of wetland resource
areas, and no vehicle refueling, equipment lubrication, or maintenance is to
be done within 100 feet of a resource area.
C:\Winword\OOC\NACC# 10 10 NACC 01/03/2001
NACC# 10
AFTER CONSTRUCTION
42)No underground storage of fuel oils shall be allowed on any lot within one-
hundred (100) feet of any wetland resource area. This condition shall survive
this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland protection
ByLaw.
43)Fertilizers utilized for landscaping and lawn care shall be slow release,low-
nitrogen types (<5%), and shall not be used within 25 feet of a resource area.
Pesticides and herbicides shall not be used within 100 feet of a wetland
resource area. This condition shall survive this Order of Conditions and shall
run with the title of the property. This condition is issued under the
authority of the Town's Wetland Protection ByLaw and shall remain in
perpetuity.
44)Upon completion of construction and grading, all disturbed areas located
outside resource areas shall be stabilized permanently against erosion. This
shall be done either by loaming and seeding according to SCS standards. If
the latter course is chosen, stabilization will be.considered complete once
vegetative cover has been achieved.
45)Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of
Compliance:
a) WPA Form 8A-"Request for a Certificate of Compliance."
b) A letter from the applicant requesting a Certificate of Compliance.
c) The name and address of the current landowner.
d) Signed statements from the individual property owners shall be
submitted with the request for a Certificate.of Compliance indicating
that they read and understood the recorded Order of Conditions prior
to purchasing their property.
e) The name and address of the individual/trust or corporation to whom
the compliance is to be granted.
f) The street address and assessor's map/parcel number for the project.
CAWinword\OOC\NACC# 10 11 NACC 01/03/2001
NACC# 10
g) The DEP file number.
h) A written statement from a Registered Professional Civil Engineer of
the Commonwealth certifying that the work has been conducted as
shown on the plan(s) and documents referenced above, and as
conditioned by the Commission.
i) An"As-Built' plan prepared and signed and stamped by a Registered
Professional Civil Engineer of the Commonwealth, for the public
record. This plan will include:
➢ "As-Built' post-development elevations of all drainage&
stormwater management structures constructed within 100 feet
of any wetland resource area. NOTE: If portions of the
stormwater systems exist partially within the Buffer Zone than
the entire structure must be depicted to accurately verify
compliance.
➢ "As-Built'post-development elevations and grades of all filled
or altered wetland resource areas including the encompassing
buffer zone which is regulated as a resource area under the
local Wetland Protection Bylaw.
➢ Distances from structures to wetland resource areas. Structures
include (but are not limited to) septic systems,additions,fences,
sheds, stone walls, pools,retaining walls, subsurface utilities
and decks.
➢_ A line showing the limit of workand the extent of existing
erosion control devices. "Work." includes a_v disturbance of
soils or vegetation.
➢ Location of all subsurface utilities entering the property.
CAWinword\OOCWACC# 10 12 NACC 01/03/2001
NACC# 10
46)The following special conditions shall survive the issuance of a Certificate
of Compliance(COC)for this project:
➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall
be established from the edge of adjacent wetland resource areas
except in those locations approved under DEP #242-
Future
42=Future work within 100' of existing wetland resource areas will
require a separate filing with the NACC(refer to Section XI
(page 18) of the Regulations for performance standards within
these zones) The Conservation Administrator and/or other
agents of the NACC do not have the authority to waive these
setbacks as established under the local ByLaw;
➢ Discharge or spillage of pollutants (Condition#40);
➢ Prohibition of underground fuels (Condition#41);
➢ .Limitations on the use of fertilizers, herbicides, and pesticides
(Condition#42).
CAWinword\OOC\NACC# 10 13 NACC 01/03/2001
MdWidGUU3V1&4 LIVUaIUIN1 114 UN 181WRIVINEIRWIS"S 1 .v...v.ev.. NACiCi # 10
Bureau of Resource Protection— Wetlands
WPA Form 5 - Ordef of Conditions
and North Andover Wetland
Massachusetts Wetlands Protection Act M.G.L.. c. 131, §40 Protection Bylaw.
Findings (cont.)
This Order is valid for three years,unless otherwise specified On this
as a special condition pursuant to General Conditions#4, 3rd
from the date of issuance.
January 3, 2001 day of January
Date
Month
2001
This Order must be signed by a majority of the conservation
ar
commission.The Order must be mailed by certified mail Y`
(return receipt requested)or hand delivered to the applicant. before me personally appeared
A copy also must be mailed or hand delivered at the same Scott Masse
time to the appropriate regional office of the De ent of
Environmental Protection.
to me known to be the person described in and who executed
Signatures: the foregoing instrument and acknowledged that he/she
executed the ame as his/her free act and deed.
/`NotaryPubtic
Mycommission expires
This Order is issued to the applicant as follows:
❑ by hand delivery on
Date
[X by fffaMmail,J@U(KJftY&J Lgg@LVAon
January 5, 2001
we
Appeals
The applicant,the owner,any person aggrieved by this Order, The request shall state clearly and concisely the objections to
any owner of land abutting the land subject to this Order,or the Order which is being appealed and how the Order does not
any ten residents of the city or town in which such land is contribute to the protection of the interests identified in the
located,are hereby notified of their right to request the Massachusetts Wetlands Protection Act(M.G,L.c.131,§40
appropriate.Department of Environmental Protection Regional and is inconsistent with the wetlands regulations(310 CMR
Office to issue a Superseding Order of Conditions.The request 10.00).To the extent that the Order is based on a municipal
must be made by certified mail or hand delivery to the bylaw,and not on the Massachusetts Wetlands Protection Act
Department,with the appropriate filing fee and a completed or regulations,the Department of Environmental Protection has
Appendix E:Request for Departmental Action Fee Transmittal no appellate jurisdiction.
Form,as provided in 310 CMR 10.03(7)within ten business
days from the date of issuance of this Order.A copy of the
request shall at the same time be sent by certified mail or hand
delivery to the conservation commission and to the applicant,
if he/she is not the appellant.
n...... A -f C
Md»ac:uuacu�ycYanu.cua v■ ........................_-__-._o.
Bureau of Resource Protection— Wetlands NACC ii 10
WPA Form 5 - Order of Conditions and North Andover Wetland
Massachusetts Wetlands Protection Act M.G.L, c. 131, §40 Protection Bylaw.
0 Recording Information
This Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is
located,within the chain of title of the affected property. In the
case of recorded land,the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the
land subject to the Order.In the case of registered land,this
Order shall also be noted on the Land Court Certificate of Title
of the owner of the land subject to the Order of Conditions.The
recording information shall be submitted to the
North Andover
consavation commission
on the form below,which must be stamped by the Registry of
Deeds.
Detach on dotted line and submit to the Conservation Commission.
--•--------------------- ----------
To:
Conservation Commission
Please be advised that the Order of Conditions for the project
at
ProjectLocation DEP File Number
has been recorded at the Registry of Deeds of
County
and has been noted in the chain of title of the affected property
in
Book
Page
in accordance with the Order of Conditions issued on
Date
If recorded land,the instrument number which identifies this
transaction is
Instrument Number
If registered land,the document number which identifies this
transaction is
Document Number
Signature ofAppiicant
Bureau of Resource Protection- Wetlands
WPA Appendix E - Request for Departmental Action Fee Transmittal Form
and North Andover Wetland
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Protection Bylaw.
Please type or
print clearly all Request Information
information
requested on this
form. 1. Person or party making request(if appropriate,name the 2. Applicant(as shown on Notice of Intent,Abbreviated Notice
citizen group's representative): of Resource Area Delineation,or Request for Determination
of Applicability):
Name
Name
Mailing Address
Mailing Address
City -n
City/fown
State Zip Code
State Zip Code
Phone Number
Phone Number
Fax Number(if applicable)
Fax Number(fapplicable)
Project Location: DEP File Number:
StreetAddress
CkylTown
Instructions
1. When the departmental action request is for(check one): 2. On a separate sheet attached to this form,state clearly and
concisely the objections to the Determination or Order
❑ Superseding Order.of Conditions which is being appealed.To the extent that the Determina-
- -_ - - - ❑ Superseding-Determination of Applicability -tion or Order is based on a municipal-bylaw;-and-not-on the -
❑ Superseding Order of Resource Area Delineation Massachusetts Wetlands Protection Act or regulations,the
Department of Environmental Protection has no appellate
Send this form and a check or money order for$50.00, jurisdiction.
payable to the Commonwealth of Massachusetts,to
3. Send a copy of this form and a copy of the check or money
Dept.of Environmental Protection order with the Request for a Superseding Determination or
Box 4062 Order by certified mail or hand delivery to the appropriate
Boston,MA 02211 DEP regional office as listed in Appendix A.
4. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the conservation commis-
sion and to the applicant,if he/she is not the appellant.