HomeMy WebLinkAboutDecision - 188 CHESTNUT STREET 8/9/2006 oRrh SAC 9 CONSERVATION Community Development Division August 9,2006 188 CHESTNUT STREETFILE CA7-! North Andover �}`` Construction of a Deck Conservation Conditions of Approval,NACC #18 On August 7,2006 J. Sirois Woodworking&Construction (contractor) filed for a small project review(section 4.4(A) of the North Andover Wetland Regulations) on behalf of the homeowner of 188 Chestnut Street.The proposed work includes razing the existing deck in order to construct a 26'x12' deck (specificaUy18'x12' deck with an 8'x12'landing)within the Buffer Zone to an adjacent Bordering Vegetated Wetland(BVW).The deck will be built larger than what currently exists, and new sonotubes will be added to bring the structure up to the MA Building Code.The deck is proposed approximately 85' from the wetland resource area at its closest point.All demolition and construction activities will be performed by hand. Conditions: 1. The total square footage of the proposed deck exceeds the 300 s.£maximum area allowed under the small projects review,as described under Section 4.4(A) of the North Andover Wetlands Regulations.Therefore,the deck will need to be reduced by one (1) foot in any location to comply with the maximum square footage allowed under the aforementioned provision.This modification shall be reflected in the building permit application. 2. Due to the flatness in topography,the distance from the wetland to the approved work,and that the work is being completed by hand,erosion controls are not required. However,the NACC reserves the right to impose the use of erosion controls (hay bales &/ or silt fence)if the site exhibits erosion,or any noticeable degradation of surface water quality discharging from the site. Should the erosion control be required by the NACC or the Conservation Department,they shall be installed within 48 hours of the request The erosion control barrier will be properly installed (silt fence trenched 4—6-inches into the ground,backed by double-staked hay bales) and shall be inspected and approved by the Conservation Department These temporary erosion control measures shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the Department or the NACC. 3. Accepted engineering and construction standards and procedures shall be followed in the completion of the project 4. Upon completion of the approved project and site stabilization,please contact the Conservation Department for a final inspection. 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688,9530 Fax 978,688.9542 Web www.http://www.townofnorthandover.com/con serve I.ht nw �00 S FT-, ,2 t I i � I I i