Loading...
HomeMy WebLinkAboutDecision - 67 CRICKET LANE 1/11/2008 NORTH 16 O O t A �A4Tfo I.PP '(y pS$ACNUSE� CONSERVATION DEPARTMENT Community Development Division January 11,2008 Robin Markowsky 67 Cricket Lane North Andover,MA 01845 67 Cricket Lane, North Andover Expansion of an Existing Deck Conservation Conditions of Approval, NACC #38 Pursuant to section 4.4.2 K of the North Andover Wetlands Protection Regulations,Robin Markowski, applicant/ homeowner,filed for a small project for work proposed at 67 Cricket Lane,North Andover. The work consists of expansion of an existing addition by six feet and the construction of a 28' x 12' deck with a 24' x 12' pyramid deck off that with associated stairway. Approximately 288 total s.f. of work (deck and stairs) is within the 100-foot buffer zone to a wetland resource area which is located across the street. Soil disturbance for the work is limited to the installation of nine (9) new 12-inch sonotube footings. Installation of the sonotubes will be performed using a small bobcat type piece of equipment because of the number of footings required. Work will be conducted approximately 88 feet from the edge of a Bordering Vegetated Wetland(BVW) located across Cricket Lane at its closest point. The Conservation Department conducted a field inspection on December 10, 2007 and agreed with the location of the wetland boundary. During the January 9,2008 public meeting,the North Andover Conservation Commission(NACC) voted unanimously to approve this project as described above. The following conditions were hereby mandated for the proposed work: RECORD DOCUMENTS: Scaled Sketch prepared by the contractor,Dan Gobeil; Copy of a portion of the record Walnut Ridge Plan for the site (242- 904); Letter of proposal/description of work prepared by Dan Gobeil dated December 16,2007. CONDITIONS: 1. A row of staked hay bales backed by trenched siltation fence shall be placed at the toe of slope between the construction area and the roadway. The erosion control barrier will be properly installed and shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.http://ww-vv.towtiofnorthandover.com/conservel.htin Further, erosion control measures consisting of either haybales and stone or filter fabric shall be placed around the existing catch basin located in the driveway. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not mentioned herein. Should such installation be required,they shall be installed within 48 hours of the Commissions request. 2. Upon installation of the aforementioned erosion controls and prior to the commencement of construction, the Conservation Department shall be contacted at least 48 hours in advance to verify that said erosion controls have been properly installed. 3. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 4. Access for construction shall be limited to the existing driveway unless otherwise discussed with and approved by the Conservation Department. 5. Excess material and construction debris shall be properly disposed of off site. 6. Upon completion of the approved project and site stabilization, please contact the Conservation Department for a final inspection. 7. This permit shall expire on July 31,2008. Please do not hesitate to contact me should you have any further questions or concerns in this regard. Thank you in advance for your anticipated cooperation. Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT Alison E. McKay Conservation Administrator 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.http://www.townofnorthandover.com/conservel.htm :�4z N.MAIPd srrF��; AN[�OUVER��M���1�1A0 ASSOCIATES, _IhlC. [..(9713) 474--4410 FAX:(978) 474-5067 MORTGAGOR: JYARREN A. & ROBIN J. MARKOWSK DEED REF, . LOCATION. 67 CRICKET LANE .PLAN REF. C;TY STATE: NORTH ANDOVER, MA, SCALE: I" = 80' DATE: 03-10-00 _ 50' JOB #: Z000f122 REVISED. 6-1—DD co A co 23.19' `"'��•o,,,. , ` 10.42' 16.36' ego Po 5 El? � ry cb LOT 11A 43660 sf.± f yam\ encl.porch } • /', � J / existing / `b'QCs dwelling �'�`�