July 31,2009
Brenda&Eric Faulkner
45 Woodbury Lane
North Andover, MA 01845
45 Woodbury Lane, North Andover
Expansion of an Existing Deck,New Patio and Associated Grading
Conservation Conditions of Approval, NACC #57
Pursuant to section 4.4.2 A,F and J of the North Andover Wetlands Protection Regulations,Brenda
and Eric Faulkner, applicants/ homeowners,filed for a small project for work proposed at 45
Woodbury Lane,North Andover. The work consists of the construction 112 square foot(8' x 14') deck,
a 294 square foot stone patio and stairs (partially pervious) and associated grading. All work is
within the 100-foot buffer zone to a Bordering Vegetated Wetland (BVW) associated with an
intermittent stream which is located approximately 61 feet to the west of the proposed work at its
closest point. Soil disturbance for the work is limited to minor grading by a small bobcat. A
berm/stonewall and two driveways separate the proposed work from the wetland resource area. The
Conservation Department conducted a field inspection of the property and agreed with the location
of the wetland boundary.
During the July 22,2009 public meeting,the North Andover Conservation Commission(NACC)
voted unanimously to approve this project as described above. The following conditions were hereby
mandated for the proposed work:
RECORD DOCUMENTS: Email of July 22,2007(from Brenda Faulkner to Jennifer Hughes)
regarding 45 Woodbury Lane,photo (1 page),and plan titled
Woodberry lane,North Andover,Mass:Utility Easement Plan,
received July 8, 2009;
CONDITIONS:
1. Accepted engineering and construction standards and procedures shall be followed in the
completion of the project.
2. Excess material and construction debris shall be properly disposed of off site.
1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.http://www.townofnorthandover.com/conservel.htm
3. Per section 4.4.5 of the Town of North Andover Wetland Protection Bylaw Regulations, hay bales
shall be placed at the drainage outlet located on the west side of the driveway to prevent the
erosion of stockpiled materials into the wetland resource area.
4. Upon completion of the approved project and site stabilization (loam and seed),please contact the
Conservation Department for a final inspection.
5. This permit shall expire on December 31,2009.
Please do not hesitate to contact me should you have any further questions or concerns in this regard.
Thank you in advance for your anticipated cooperation.
Respectfully,
ORTH ANDOVER CON�fSERVATION DEPARTMENT
Ji'e er A. he
CQ�servation Administrator
1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.http://www.townofnorthandover.com/conservel.httn