Loading...
HomeMy WebLinkAboutDecision - 100 BRIDLE PATH 5/21/2010 `koRTH a OL O A �TRQDN9TfD�Ppy�S 9UACHUS! '.. CONSERVATION DEPARTMENT Community Development Division May 21,2010 Brendan Salach 100 Bridle Path North Andover,MA 01845 100 Bridle Path, North Andover Deck Replacement and Extension Conservation Conditions of Approval,NACC #69 Pursuant to section 4.4.2 (A) of the North Andover Wetlands Protection Regulations,Mr. Brendan Salach (applicant/homeowner) filed for a small project for work proposed at 100 Bridle Path,North Andover. The proposed work includes the razing of an existing deck and stairs, and the construction of two decks (14'x 17' and 8'x 7'joined) and associated stairs. The old footings will be removed and seven (8) new 12" cement filled sono-tubes will be dug and placed by hand, as shown on the attached plan.Work will be conducted 50' from the edge of Bordering Vegetated Wetland (BVW) at its closest point. The North Andover Conservation Department agrees with the location of the wetland boundary. During the May 19,2010 public meeting, the North Andover Conservation Commission (NACC) voted unanimously to approve this project.The following conditions are hereby mandated: RECORD DOCUMENTS: Plan of Land in North Andover,Massachusetts Prepared for Brendan Salach Dated: May 21,2010 Updated Sketch drawn on Mortgage Plot Plan Drawn by Brendan Salach Dated: May 26,2010 Sketch prepared by Brendan Salach CONDITIONS: 1. Prior to the start of construction, erosion controls (toed-in silt fence and/or hay bales) shall be installed at the limit of work shown on the herein referenced plan. 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.http://www.townofnorthandover.com/conservel.htm 2. Prior to the start of the construction the applicant shall stake the deck location and contact the Conservation Department for a pre-construction inspection. 3. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 4. All sonotube footings shall be dug by hand as proposed. 5. Excess material shall be properly disposed of offsite. 6. Upon completion of the approved project and site stabilization,please contact the Conservation Department for a final inspection. 7. This permit shall expire six months from the date of issue. Should you have any question or comments regarding the contents of this letter,please do not hesitate to contact the undersigned at 978.688.9530 at your earliest convenience. Thanking you in advance for your anticipated cooperation with this matter. Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT Jennifer Hughes Conservation Administrator 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.http://www.townofnorthandover.com/conservel.httn