Loading...
HomeMy WebLinkAboutDecision - 810 SALEM STREET 12/2/2010 t%ORTH O Stereo ra O m SSAGFBUstit CONSERVATION DEPARTMENT Community Development Division December 2,2010 Samuel Curry c/o Matt Meuse 810 Salem St North Andover,MA 01845 810 Salem St, North Andover Expansion of an Existing Deck Conservation Conditions of Approval,NACC #77 Pursuant to section 4.4.2 A of the North Andover Wetlands Protection Regulations,Matt Meuse, contractor,filed for a small project for work proposed at 810 Salem Street,North Andover.The work consists of expanding the existing deck from 120 s.f. to 300 s.f. Existing and new footings will be used to support the new deck configuration. The decking and railings will be removed from the old deck and replaced. The proposed deck is within the 100-foot buffer zone to a Bordering Vegetated Wetland(BVW) and Riverfront(project is exempt from Riverfront)which is located to the north and east of the site.Additional work includes placing gravel under the deck. Work will be conducted outside of the 50-foot No Construction zone from the edge of the Bordering Vegetated Wetland (BVW). During the December 1,2010 public meeting,the North Andover Conservation Commission(NACC) voted unanimously to approve this project as described above. The following conditions were hereby mandated for the proposed work: RECORD DOCUMENTS: As-Built Plan of Land,North Andover,MA Prepared by: Merrimack Engineering Services Dated: November 25,2008 Revised: December 1,2008 Proposed Deck Added by:Matthew Meuse-B&M Builders LLC Project Description done by Matthew Meuse CONDITIONS: 1. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.http://wn-�v.toxvnofnorthandover.com/conselvel.htm 2. Excess material and construction debris shall be properly disposed of off site and all stockpile areas shall be located more than 50'from the resource area. 3. The applicant shall contact the Conservation Department upon completion of the project for a post-construction inspection. 4. This permit shall expire six months from the date of issue. Please do not hesitate to contact me should you have any further questions or concerns in this regard. Thank you in advance for your anticipated cooperation. Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT (4"_1 Heidi Gaffney Conservation Field Inspector 1600 Osgood Street,Building 20,Suite 2-36,Nordi Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.http://-,vww.townofiiorthandover.com/conservel.htm