Loading...
HomeMy WebLinkAboutDecision - 400 DALE STREET 3/15/2012 tyORTp Q`tt'I. is qti 0 t ** '%; -" CONSERVATION DEPARTMENT Community Development Division March 15,2012 Pat Danahy 400 Dale Street North Andover,MA 01845 400 Dale Street, North Andover Sewer System Connection Conservation Conditions of Approval,NACC #91 Pursuant to section 4.4.2 D of the North Andover Wetlands Protection Regulations,Daniel A. Giard Septic Service filed for a small project on behalf of Pat Danahy,homeowner,for work proposed at 400 Dale Street,North Andover.The work consists of abandoning an existing septic system per Board of Health regulations and connecting to Town of North Andover sewer service. The sewer line will be trenched from the street for a length of approximately 220 feet along the east side of the driveway and connected to an existing septic tank in the south west corner of the house. Work is proposed within the buffer zone to Bordering Vegetated Wetland (BVW)which is located on the west side of the existing driveway and extends to the north portion of the lot. Excavation will be approximately 35- feet from BVW at the closest point. During the March 14,2012 public meeting,the North Andover Conservation Commission(NACC) voted unanimously to approve this project as described above and in the documents referenced below. The following conditions were hereby mandated for the proposed work: RECORD DOCUMENTS: Aerial view of the property with the proposed sewer location drawn in by hand for 400 Dale Street,North Andover,MA Hand drawing by Daniel A. Giard Received: March 6,2012 Letter dated March 12,2012 describing the work Prepared by: Daniel A. Giard CONDITIONS: 1. Erosion controls (to be approved by Conservation Department) shall be installed along the west side of the driveway for the length of the project. 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.http://www.townofilorthandover.com/conservel.htm