HomeMy WebLinkAboutDecision - 400 DALE STREET 3/15/2012 tyORTp
Q`tt'I. is qti
0 t
**
'%; -"
CONSERVATION DEPARTMENT
Community Development Division
March 15,2012
Pat Danahy
400 Dale Street
North Andover,MA 01845
400 Dale Street, North Andover
Sewer System Connection
Conservation Conditions of Approval,NACC #91
Pursuant to section 4.4.2 D of the North Andover Wetlands Protection Regulations,Daniel A. Giard
Septic Service filed for a small project on behalf of Pat Danahy,homeowner,for work proposed at 400
Dale Street,North Andover.The work consists of abandoning an existing septic system per Board of
Health regulations and connecting to Town of North Andover sewer service. The sewer line will be
trenched from the street for a length of approximately 220 feet along the east side of the driveway and
connected to an existing septic tank in the south west corner of the house. Work is proposed within
the buffer zone to Bordering Vegetated Wetland (BVW)which is located on the west side of the
existing driveway and extends to the north portion of the lot. Excavation will be approximately 35-
feet from BVW at the closest point.
During the March 14,2012 public meeting,the North Andover Conservation Commission(NACC)
voted unanimously to approve this project as described above and in the documents referenced
below. The following conditions were hereby mandated for the proposed work:
RECORD DOCUMENTS: Aerial view of the property with the proposed sewer location drawn in
by hand for 400 Dale Street,North Andover,MA
Hand drawing by Daniel A. Giard
Received: March 6,2012
Letter dated March 12,2012 describing the work
Prepared by: Daniel A. Giard
CONDITIONS:
1. Erosion controls (to be approved by Conservation Department) shall be installed along the
west side of the driveway for the length of the project.
1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.http://www.townofilorthandover.com/conservel.htm