Loading...
HomeMy WebLinkAboutDecision - 25 MARGATE STREET 7/19/2012 110RT#1 �'gkSFb t�` CONSERVATION T Community Development Division July 19, 2012 Thomas &Linda Bailey 25 Margate Street North Andover,MA 01845 25 Margrate Street, North.Andover Loaming, re-seeding and minor drainage work Conservation Conditions of Approval,NACC #96 Pursuant to section 4.4.2 Q) of the North Andover Wetlands Protection Regulations,Thomas and Linda Bailey (owners) filed for a small project for work proposed at 25 Margate Street,North Andover. The proposed construction includes minor drainage work and grading including the installation of a 4" drainage pipe connected to the existing gutters, discharging at the edge of the existing lawn (more than 25' from the edge of Bordering Vegetated Wetland (BVW)) and the loaming and reseeding of the existing lawn more than 25' from the edge of BVW as shown on the herein referenced plan. The gutters currently discharge directly onto the lawn and are eroding the soil and the lawn,preventing the grass from growing and preventing stabilization. The drainage work is permitted in order to allow for proper stabilization of the soil. During the July 11,2012 public meeting, the North Andover Conservation Commission (NACC) voted unanimously to approve this project. The following conditions are hereby mandated: RECORD DOCUMENTS: Small Project Filing Including: Description dated 5/29/12,prepared by Peter Breen Site Plan with hand edits stamped received on 5/29/2012 Aerial photograph Prepared by: Thomas and Linda Bailey Date: Materials received 5/29/2012 CONDITIONS: 1. Prior to the start of construction the applicant shall ensure that the site contractor has reviewed the small project permit and is aware of the wetland resource area and the limits of the proposed work and shall contact the conservation department for a pre-construction site visit. 1600 Osgood Street,Btulding 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.658.9530 Fax 978.688.9542 Web X"'W-W.http://,,,-N7,w.towtiofnorthandover.con-i/conservel.htm 2. Prior to the start of construction, the applicant shall install erosion controls at the north and west edges of the existing lawn. The Conservation Department shall be called to inspect the erosion controls once installed. 3. Prior to the start of construction, the applicant shall install six (3) wetland markers (available at the Conservation Department—2 round 1 square) at the existing tree line. 4. Excess material shall be properly disposed of offsite. 5. Upon completion of the approved project and site stabilization,please contact the Conservation Department for a final inspection. 6. This permit shall expire six months from the date of issue. Should you have any question or comments regarding the contents of this letter,please do not hesitate to contact the undersigned at 978.688.9530 at your earliest convenience. Thanking you in advance for your anticipated cooperation with this matter. Respectfully, NORTH ANDOVER CONSERVAI'I®N DEPARTMENT Jennifer A. Hughes Conservation Administrator 1600 Osgood Street,Building 20,Siete 2-36,'tiorth Andover,Massachusetts 01845 Phone 978.6889530 Fax 978.688.9542 Web tvv-,-w.http://u%vw.townofnorthandover.com/conserv-el.htm