HomeMy WebLinkAboutDecision - 25 MARGATE STREET 7/19/2012 110RT#1
�'gkSFb t�`
CONSERVATION T
Community Development Division
July 19, 2012
Thomas &Linda Bailey
25 Margate Street
North Andover,MA 01845
25 Margrate Street, North.Andover
Loaming, re-seeding and minor drainage work
Conservation Conditions of Approval,NACC #96
Pursuant to section 4.4.2 Q) of the North Andover Wetlands Protection Regulations,Thomas and
Linda Bailey (owners) filed for a small project for work proposed at 25 Margate Street,North
Andover. The proposed construction includes minor drainage work and grading including the
installation of a 4" drainage pipe connected to the existing gutters, discharging at the edge of the
existing lawn (more than 25' from the edge of Bordering Vegetated Wetland (BVW)) and the
loaming and reseeding of the existing lawn more than 25' from the edge of BVW as shown on the
herein referenced plan. The gutters currently discharge directly onto the lawn and are eroding the
soil and the lawn,preventing the grass from growing and preventing stabilization. The drainage
work is permitted in order to allow for proper stabilization of the soil.
During the July 11,2012 public meeting, the North Andover Conservation Commission (NACC)
voted unanimously to approve this project. The following conditions are hereby mandated:
RECORD DOCUMENTS: Small Project Filing Including:
Description dated 5/29/12,prepared by Peter Breen
Site Plan with hand edits stamped received on 5/29/2012
Aerial photograph
Prepared by: Thomas and Linda Bailey
Date: Materials received 5/29/2012
CONDITIONS:
1. Prior to the start of construction the applicant shall ensure that the site contractor has reviewed
the small project permit and is aware of the wetland resource area and the limits of the proposed
work and shall contact the conservation department for a pre-construction site visit.
1600 Osgood Street,Btulding 20,Suite 2-36,North Andover,Massachusetts 01845
Phone 978.658.9530 Fax 978.688.9542 Web X"'W-W.http://,,,-N7,w.towtiofnorthandover.con-i/conservel.htm
2. Prior to the start of construction, the applicant shall install erosion controls at the north and
west edges of the existing lawn. The Conservation Department shall be called to inspect the
erosion controls once installed.
3. Prior to the start of construction, the applicant shall install six (3) wetland markers (available at
the Conservation Department—2 round 1 square) at the existing tree line.
4. Excess material shall be properly disposed of offsite.
5. Upon completion of the approved project and site stabilization,please contact the Conservation
Department for a final inspection.
6. This permit shall expire six months from the date of issue.
Should you have any question or comments regarding the contents of this letter,please do not
hesitate to contact the undersigned at 978.688.9530 at your earliest convenience. Thanking you in
advance for your anticipated cooperation with this matter.
Respectfully,
NORTH ANDOVER CONSERVAI'I®N DEPARTMENT
Jennifer A. Hughes
Conservation Administrator
1600 Osgood Street,Building 20,Siete 2-36,'tiorth Andover,Massachusetts 01845
Phone 978.6889530 Fax 978.688.9542 Web tvv-,-w.http://u%vw.townofnorthandover.com/conserv-el.htm