HomeMy WebLinkAboutDecision - 77 BEAR HILL ROAD 12/13/2012 taoRTy
® ggLeo ,e'
'8 ®L
O
it
��4TE0 PPa`y.cy '.
CONSERVATION DEPARTMENT
Community Development Division
December 13, 2012
David J. McGillivray
77 Bear Hill Road
North Andover,MA 01845
77 Bear Hill Road,North Andover
Construction of a 12' x 24' Deck on Sono-tube Footings
Conservation Conditions of Approval,NACC #104
Pursuant to section 4.4.2 (A) of the North Andover Wetlands Protection Regulations,William
Foster (builder), filed for a small project for work proposed at 77 Bear Hill Road,North Andover.
The proposed work includes of a new 12' x 24' deck on hand-dug sono-tube supports.The deck is
approximately 60 feet from the edge of an intermittent stream and associated Bordering Vegetated
Wetland (BVW) as shown on the herein referenced plan. The BVW area also serves as a stormwater
detention basin.The detention basin was built in the late 1970's within a resource area and has been
determined to be jurisdictional by the North Andover Conservation Commission (NACC).
During the December 12,2012 public meeting, the NACC voted unanimously to approve this
project.All work shall conform to the following:
RECORD DOCUMENTS: Small Project Filing Including:
Application Checklist and narrative;
Interior layout plans prepared by William Foster;
Site Plan and aerial photograph both with hand edits;
Filing received: December 5, 2012
The following conditions are hereby mandated:
CONDI'T'IONS:
1. Prior to the start of construction the applicant shall ensure that the site contractor has reviewed
the small project permit and is aware of the wetland resource area and the limits of the proposed
work.
2. Prior to the start of construction,the applicant shall install erosion controls (trenched silt fence,
hay bales, silt sock, etc.) between the proposed work and the resource area. Please contact the
Conservation Department to inspect the erosion control before work begins.
1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.http://uww.townofnorthandover.com/conservel.htrn
3. Excess construction material shall be properly disposed of offsite and accepted engineering
and construction standards and procedures shall be followed in the completion of the
project.
4. Upon completion of the approved project and site stabilization,please contact the Conservation
Department for a final inspection.
5. This permit shall expire nine months from the date of issuance.
Should you have any question or comments regarding the contents of this letter,please do not
hesitate to contact the undersigned at 978.688.9530 at your earliest convenience.Thanking you in
advance for your anticipated cooperation with this matter.
Respectfully,
)Je
ORTH AN OVCO SERV TION DEPARTMENT
nifer A. Hughesnservation Administrator
1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.http://www.townofnorthandover.com/conservel.htm