Loading...
HomeMy WebLinkAboutDecision - 124 BRIDLE PATH 7/11/2013 NORTFI O�ts�eD 46+®'yO o 9 DRITED�Ppy.cT'7 �SSacHuS CONSERVATION DE A TENI" Community Development Division July 11,2013 William&Margaret Orlansky 124 Bridle Path North Andover,MA 01845 124 Bridle Path, North Andover Sewer System Connection Conservation Conditions of Approval, NACC #113 Pursuant to section 4.4.2 D of the North Andover Wetlands Protection Regulations,ARCO Excavators,Inc.,contractor/representative for the property owner,filed for a small project for work proposed at 124 Bridle Path,North Andover. The work consists of abandoning an existing septic system per Board of Health regulations and connecting to Town of North Andover sewer service. The sewer line will be trenched from the existing Sewer Man Hole in the street and will then be trenched along the south edge of the driveway approximately 280 feet where it will be connected to a pump chamber at the rear of the house. Work is proposed within the buffer zone to Bordering Vegetated Wetland (BVW) located on both sides of the driveway and connected by an existing culvert under the driveway. The sewer line is proposed to be insulated and will be installed above the culvert. Excavation will be approximately 2-feet from BVW at the closest point. During the July 10,2013 public meeting,the North Andover Conservation Commission (NACC) voted unanimously to approve this project as described above and in the documents referenced below.The following conditions were hereby mandated for the proposed work: RECORD DOCUMENTS: MIMAP Aerial Plan titled"124 Bridle Path" with the proposed sewer and pump chamber locations drawn by hand in color. Hand drawing by ARCO Excavators,Inc. Received:July 8,2013 Small Project application checklist Received: July 8,2013 Signed by:Tom Sawyer Project Narrative from ARCO Excavators,Inc. Received: July 9,2013 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web ww,v.http://wtvw.townofnoithandover.com/conservel.htm CONDITIONS: 1. Erosion controls (to be approved by Conservation Department) shall be installed along the south side of the driveway. 2. Prior to the start of construction the applicant shall contact the Conservation Department for a pre-construction inspection of the erosion controls. 3. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 4. Excess material and construction debris shall be properly disposed of off site and all stockpile areas shall be located outside the 50-foot No-Build Zone. 5. All disturbed areas shall be loamed and seeded post construction. 6. Upon completion of the permitted work and stabilization of the disturbed areas, the applicant shall contact the North Andover Conservation Department for a post-construction inspection. Erosion controls will be removed with the approval of the Conservation Department. 7. This permit shall expire six months from the date of issue Please do not hesitate to contact me should you have any further questions or concerns in this regard. Thank you in advance for your anticipated cooperation. Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT -'LL cr4l �� Heidi Gaffney Conservation Field Inspector 1600 Osgood Street,Building 20,Suite 2-36,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web ivww.http://-,vww.townofnorthandover.com/conservel.htrn