Loading...
HomeMy WebLinkAboutApproved Septic Plan - 11 PURITAN AVENUE 8/24/2017 LEGEND OF SYMBOLS & ABBREVIATIONS: Prepared Fo,r: A 5 9 UIZ T 5 KS TEU TIE-5 2- ,,,a,,, EXIST, SPOT ELEVATION TEST HOLE R-C=62.5' G-C=79.6 A 100--------- EXIST, CONTOUR A-D=71.X 6?-D=69. 7` G-D=,34.9' 1--4" DIA INLET '10-4" DIA OUTLET A J_ rr PLASTIC PIPE SEAL 0 A-E=76.J` S-E=82.J G-E=J72 1 00 PROP. SPOT ELEVATIONS DRNN MANHOLE 101. IVIF A-F=41.6' Ar-F--76. I G-F=80.4' /1 7" 04] PROP. CONTOURS CATCH BASIN /I IJ8 A C. 8VILDfR5, INC. t.-A C 00 ' CHW 2" PROP. WATER SUPPLY LINE WATER SUPPLY 7 60 8EID 0 0,0 DRI VC PLAN VIEW NO. ANDOVER, MA. C.- INV=168 J2' DIST Z90)( SECTION VIEW WELL, 0 Cq M 107- Z 150 0 MW PROP. INSPECTION PORT/MCNITCRING WELL C)L 0 0 P0 D.- INV=168-07 INV=168-58(11V 'CL 0 0:2- PRECAST 10 OUTLET DISTRIBUTION BOX > < 0 E� INV=168.08 INV=168-41(OUT) NOT' TO SCALE BENCHMARK REFERENCE DATUM: -;�,p C;IV Qit 21% NOI 1, SHEA CONCRETE ITEM NI B-ODE18 SHOWN. EQUWALENT PRODUCT MAY BE SUBSTITUTED. TOP SPINDLE HYDRANT AT CIRCLE. ELEV'.=175.75' ,0�9 XD - 2, CONI *,000 PSI MINIMUM AFTER 28 DAYS. 0 ,9 F NV=168-J,?_ 3. DESIGN CONFORMS WFFH 310 CMR 15.0010, DEP TM.E 5 REGS, FOR DISTRIBUrION BOXES, _0 5 4. EXTEND ACCESS COVER TO WITHIN 6" OF FINISH GRADE 170.04:' n IJ RIM OF CATCH BASIN AT CIRCLE. ELEV. 155,46 RIP-I?AP 1500 GALLON 0 CL ............ CONTRACTOR TO CHECK BETWEEN BENCH MARKS BEFORE INSTALLING TRENCHES X CL 61VI _.-.J 5E-P;rlC TANK 4t� 1%4* z:a 6' INV=168. Prepared By: CLEANOUT W1 PLUG 4" SCH1410 157�Oa AT PVC TEE -7 190(OtIT) /1134 WITH PERF. P.V.C. 2* OF 1/8"-1/2" 90' ELBOW INSPECTION: PORT- WASHED PEASTONE OIR FILTER FABRIC BUG 'SCREEN ' P_ C 'I -4,B3 COt ONYAZ 1 IS&67 (TYP', 4 PLACES) SCH 40 PVC VENT PIPE- -3- FINISHED GRADE E S81:YY:?j-E- (SEE NOTE 25) A VENUf MIN� (:>� a T) t.I 2X MIN, S 36. ��.L, I I ocus MAX. MINIMUR L E *1 63 C014"R ]�T 1 154.43 17158 4* DIA. SCH40 PERF. P.V.C. W Id W 05,30W .22 543 '104011 1 1,"1 NATURAL, $OIL > 7 PURTIAN a- u- § 611 EXCAVATION ZI 142 15 E4 Z 02 S16& A VENUf 154.96 OEPTH STOW 3/4--1 1/2- J 04J DOUBLE WASHED- LA 150 4�93 LOT 12 :P STONE 31 1 4' 5' 24, ''1",58, 0 WR016 050 .5.F. 050 W29 7H NVW 0)(80W ..."LOT 13. 1JT1 CA7S77NO WaasJ exisnNo 157.98 Is Im _11��: � -"*- 11, N C/Rcz E Design By: gr WALt 25, 675 71 LTJ 158J5 LEACHING TRENCH DETAIL Drown By. gr NOT TO SCALE ............ Checked By� pjo ... .......... Project File� NOA-0084 NOTE", Camp. No,: NOA1 9 12"" / ,p PROPOSED LEACH TRENCHES TO BE INSTALLED AT SAME ELEVATIONS AS SHOWN []Issued, For Permit <ell ON AS BUILT. El Issued For Review DRIVEW Y '900 REPLACE EXISTING DIST. BOX AND INSTALL RISER TO WITHIN 6':' OF FINISH GRADE. Dissued For Bid ...... INSTALL "SPEED LEVELERS"' IN OUTLET PIPES. ............ /"I, EJ Issuied For Construction 4 LOCUS, MAP ........... 4uv .4 INSTALL FILTER, IN OUTLET PIPE AND INSTALL RISER TO FINISH GRADE WITH HEAVY tion ION El Not For Construc TING f OUNDA 7, 66 LOT I I DUTY RIM AND COVER. *N Ole SCALE: 1 III`=15001' 9 CONNECT ENDS OF EXISTING PIPE AND PROPOSED PIPES TO FORM A VENT. 4 22oJ47 S.F. r)c, GN DATA: AS SUBMITTED BY ez7asmv WQ DESI .5< A INSPECTION PORTS TO BE INSTALLED IN ALL TRENCHES, HAYES ENGINEERING IN 1996 'A OVERDI:G MAY BE REQUIRED IF ANY UNSUITABLE SOIL FOUND IN AREA OF 00 OMH N PROPOSED LEACH TRE CH. NUMBER OF BEDROOMS: 4 70. RIM-168.47 VI 10 DESIGN FLOW: 1101 G.P.D./BA. "�POO DRM A Y V CAIV EXISTING TRENCHES TO REMAIN. DAILY FLOW: 4 x 110 = 440 G.P.D. JASCAJI -`x 74NAe' SEPTIC 'TANK REQUIRED: 880 GAL� SEPTIC TANK USE,D:, 1500 GAL, PROPOSkD 15 111!�, I -%-% \% v LEACH AREA REQIUlkED: .0 $ VENr CLASS I SOILS LTAR = 030 G,P.D./S.F. NIF L =5.p, .....................1 ..Z i' ', f- NOTE: INFORMATION FOR TH11S PLAN COMPILED FROM 0 L cv 440 G.P.D./ 030 G.P.D./SI,17. 629 S.F. RONG WU 170.04 "AS-BUILT SEPTIC SYSTEM DESIGN" DATED NOVEMBER 6, 1997 71 > 0 SCO777i' L. WYA 7T 14 PURIrAN AVE 0 00 AND "AS-BUILT PLAN OF LAND LOT's 12 AND 13 COLONIAL AVE." LEACH AREA USED: ,630 S.F. DATED NOVEMBER 6, 1997 BOTH BY HAYES ENGINEERING, INC. M 107- L 13,Y 0 '00 NO GARBAGE DISP6SALS ALLOWED 0. :7%,, v BA-93 LEACHING AREA CALCULATIONS: NOV. 4,, 1996 13� = 135 S.F. BOTTOM: (3*W)(45"Q SIDES: (2)(2D)1(45'Q = 180 &F� LEACHING AREA PER TRENCH = 3151 &F. 2- TOTAL LEACH AREA, PROVIDED: z CA TA VIIII (2 TRENCHES)(315 S.F./TRENCH) 630 S.F. UA Rff A NO KIVgi REL v SOIL LOG,S'. L OT 14 A VE C00PFR5,r51tV 0 -9 0 WSO 2 1 JJ COL ONIA L AVE DATE OF TESTING: 3-4-92 L=96. 10', M 1'07- L IJJ 5-3-93 R=60.00 6-11-93 HyQRAAIT 6-6-96 4-J 75-7� Cc) .0 4i OJI A) SOIL EVALUATOR: GORDON1 ROGERSON --0 .41 APPROVEI'D BY' CC)) BOARIII) 01;` I�I'IE REICEIVED 0 4571N,_ I BOARD OF HEALTH: SANDY STARR '10 .\IN A?21 44, !Pe" oc�l A y/4"2"/;41 e, " I I,/ SUSAN FORD AME MIKE ROSSETTI 2,10,1,7 ISK 70P oil. FOX.,^ TOWN OF NORTH ANDOI FOUNDA 6101V DATE ., PERCOLATION RATE: P12A. 6 min./iin., f_ZfV-175�57 HEALTH DEPARTMENT P1 2B. 5 min./in. �6,f I /S,?, - Drawing "ritle: J OOX M 3� R=30 00 I=27 4.0 C TO G L,A W 0 CL S 0 _13 DEPTH SOL MI S014 SOIL 7: 'T TEXTURE CONSISTE N-,r\ A -M HORIZON/ COLOR-WI :NCE IRE I 7y (In.) LAYER (MUNSELL) (USDA) (MOIST) E 4­ SIGAt _4 001�-Os* AP -A 24" DW ­­­_C \J 0 24,'-'152" KD ...... Z� C VZ N7 C) L. (7) ZONE PRO (R-2) VR. \TP 6 ` `>' \ ` NO RFrusAL; No sTATic WATER-, No WEEPINC, "TIMI SEASONAL HIGH GROUNDWAURTAOLF DOWN 152* AT ELEVATION - 163,7' W ES -k MINIMUM SE784CKS.- > V V-4 �G ......... 4 0 C)L CL .10 N1. FRONr 20 08"-18" aw fall ................... 91 5149C 20 (SU 6C. 6.5.6.0 1) C C) _V I , � \ "N RE4R 20 ------- NO REFUSAI NO STATIC WATER, 140 WEEPIN ESTIMATED SEASONAL HIGH GROUNDWXTER TASS DOWN 108- AT ELEVAPON 9.0- -931 0 (7) TP81A CONSTRUCTION NOTES" 'Ile 1 Excavate all topsoil, subsoil, and any other unsuitable ......... qr _z_ material within the finnits of excavation and replace to, top of .. ....... peastone elevation with select on--sfte or Imported soil 4.1l'-65* cl 4 7� material, consisting of Clean granular sand, free from No I REFUSAI; NO STATiC WATER,WO WI ING, 66 S4 organic matter land deleterious substances. 9 z 2. R111 mateeml shoR not contain I mateiial larger than two EiniiWED' SEASONAL HIGH GROUNDWATER TABLE D N 65* AT ELEVATION - 160I,X 7:�F (2) inches. The fill material sholi comply with Title 5, State �4 Environmental Code 3,10 CMR 15.255 (3) as revised. CD V) 3' 1 Contractor to supply to 'the town a, current sieve test analyses report at their own expense if required by the Seal Drawing No.- local approving outhorfty. 5" vo:ry c�oorse sa 00M loom PETER J ,q "11� MATERIAL NOTES: `7 owr fs SK DETAIL Leach Bedding,: ............ & silt loarn Vf5 NO 27'14 SCALE: 1 10' 1. Clean double washed Stone shall be free of iron particles, fines and dust in place. o9at course sand icps 7 sid lioamy L y P L 2, Bottom stane in leach area shall be 3/4" to 1-1/2" double washed stone as ........ J I tine son,d �omy rn C=7:D MUM Op 4 1 'L SOIL indicoted in note 1 above. Its 'Sull ................. StO -0ty, 1 91 all. 1 Top stone in leach area shal,f be 1/81" to 1/2" doubW washed peastone as fine 92!!�t_lpa fW, rn 2 indicatied in note 1 above. G,eotextile fabric may be substituted for the mIinimu _V---7 11TT ................._CJ a Y`_- C !v Ine sand oam inch loyer of: double washold peastone. Qkt10*1 SHEET 1 OF 1 0 z z