North Andover Health Department
Community and Economic Development Division
August 8, 2017
Philip D'Antonia
42 Foster Street
North Andover, MA 01845
Re: Subsurface Sewage:Disposal System Plan for 42 Foster Street (Map 1041), Parcel 51)
To Whom It May Concern:
The proposed wastewater system design plan for the above site dated May 19, 2017 with a final
revision.date of July 21, 2017 and received on July 28, 2017 has been approved. The design has
been approved for use in the construction of a new on-site septic system for a 3-bedroom house
with a maximum of 7 total rooms, utilizing a pump chamber and Presby Enviro-Septic system.
The approval includes the following variances:
1. Setback reduction between the leaching area and wetlands from 100' to 65';
2. Setback reduction from the septic tank and wetland area from 75' to 62.7';
3. Setback reduction from the septic tank and the deck from 5' to 2';
4. Setback reduction from the pump chamber and the deck from 5' to 3.8';
5. Setback reduction from the deck and the leaching field from 10' to 6.6'.
The approval includes the following I.,ocal Upgrade Approvals
1. Separation reduction from the septic tank and pump chamber inverts to groundwater;
2. Allow more then 3' of cover over the pump chamber j
i
This design plan approval is valid until August 8, 2020.
_.._ ._____ _ _._........._.._._._....__.____
..............__._ ____.._ __...._.............____._.__
Page 1. oft
North Andover Health Department, Town Hall, 120 Main Street,
North Andover, MA 01845 Phone: 978.688.9540 Fax:: 978.688. 9542
42 Foster Street August 8, 2017
During this time, a licensed septic system installer must obtain a permit and complete this work,
and a Certificate of Compliance be endorsed by the installer, designer and the Town of North
Andover.
This approval is also subject to the following conditions:
I. Prior to the issuance of the Disposal Works Construction Permit,the applicant must
submit a foundation as-built at the same scale as the approved plan
2. Prior to the issuance of the Disposal Works Construction Permit, the applicant must
submit the floor plans of the proposed dwelling showing no greater than 4 bedrooms
or a total of 9 rooms.
3. If site conditions are found in the field to be different from those indicated on the
design plan and/or soil evaluation,the originally issued Disposal System Construction
Permit is void, installation shall stop, and the applicant shall reapply for a new
Disposal Systems Construction Permit (3 10 CMR 15.020(1)),
4. It is the responsibility of the applicant and/or the applicant's septic system designer,
septic system installer or other representative to ensure that all other state and
municipal requirements are met. These may include review by the Conservation
Cornission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector
and/or Electrical Inspector. The issuance of a Disposal System Construction Permit
shall not construe and/or imply compliance with any of the aforementioned
requirements.
Please feel free to contact the office with any questions you may have. We look forward to
working with you to obtain a wastewater treatment and dispersal system which will be in
compliance with all regulations and assure protection of public health and the environment of
North Andover.
Sincere.
, y
---- -------
B/rian aGrasse, CEHT
Director of Public Health
Encl. Installers list
cc: Christiansen & Sergi, Inc., 160 Summer Street, Haverhill MA 01830
File
.......... .............
Page 2 of 2