HomeMy WebLinkAboutMiscellaneous - 62 FARNUM STREET 11/20/2017 North Andover Health Department
Community and Economic Development Division
November 20, 2017
Brian and Jessica Hickey
62 Farnum Street
North Andover, MA 01845
Re: Subsurface Sewage Disposal System Plan for 62 Farnum Street
(Map 107A Parcel 86)
To Whom. It May Concern:
The proposed wastewater system design plan for the above site dated September 28, 2017 with a
final revision date of October 10, 2017 has been approved.
The design has been approved for use in the construction of a new on-site septic system for a
three (3) bedroom dwelling with a maximum number of nine(9) rooms utilizing a gravity leach
field. This design plan approval is valid until November 20, 2020.
During this time, a licensed septic system installer must obtain a permit and complete this work,
and a Certificate of Compliance be endorsed by the installer, designer and the Town of North
Andover.
This approval is also subject to the following conditions:
1. If site conditions are found in the field to be different from those indicated on the
design plan and/or soil evaluation, the originally issued Disposal System Construction
Permit is void, installation shall stop, and the applicant shall reapply for a new
Disposal Systems Construction Permit(3 10 CMR 15.020(1)).
2. It is the responsibility of the applicant and/or the applicant's septic system designer,
septic system installer or other representative to ensure that all other state and
municipal requirements are met. These may include review by the Conservation
Page 1 of 2
North Andover Health Department
120 Main Street
North Andover, MA. 01845
Phone: 978.688.9540 Fax: 978.688. 9542
62 I"arriurn Street November 20, 2017
Commission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector
and/or Electrical Inspector. The issuance of a Disposal System Construction Permit
shall not construe and/or imply compliance with any of the aforementioned
requirements.
Please feel free to contact the office with any questions you may have. We look forward to
working with you to obtain a wastewater treatment and dispersal system which will be in
compliance with all regulations and assure protection of public health and the environment of
North Andover.
Sincere
7 /1
i in J. CaGrasse, CEHT
Director of Public Health
cc: Hayes Engineering, Inc., 603 Salem Street, Wakefield MA 01880
File
.........................................--......... - — —--------------------------------- .........................................................................................----------------------
Page 2 of 2
North Andover Health Department
120 Main Street
North Andover, MA 01845
Phone: 978.688.9540 Fax: 978.68,8. 9542