HomeMy WebLinkAboutMiscellaneous - 9 TURTLE LANE 11/22/2017 North Andover Health Department
community and Economic Development Division
i
I
November 22, 2017.
William Durfree
9 Turtle Lane
North Andover, MA 01845
i
Re: Subsurface Sewage Disposal System Plan for 9 Turtle Lane (Map 10613, Lot 104)
t
Dear Mr. Durfree:
The proposed wastewater system design plan for the above site dated October 16, 2017 with a
final revision date of November 6, 2017 and received on November 6, 2017 has been approved.
The design plan has been approved for use .in the construction of a new on-site septic system for
a Four (4)bedroom home with a maximum of Nine (9) total rooms utilizing a pump chamber and
leaching field system. This design plan approval is valid until November 22, 2020.
During this time, a licensed septic system installer must obtain a permit and complete this work,
and a Certificate of Compliance be endorsed by the installer, designer and the 'Town of North
Andover. In the event an imminent health problem, such as sewage backup into the dwelling is
occurring,the North Andover Board of Health may reduce the time period for which this plan is
valid.
This approval is also subject to the following conditions:
1. If site conditions are found in the field to be different from those indicated on the design
plan and/or soil evaluation, the originally issued Disposal System Construction Permit is
void, installation shall stop, and the applicant shall reapply for a new Disposal Systems
Construction.Permit (3 10 CMR 15.020(1))
2. It is the responsibility of the applicant and/or the applicant's septic system designer,
septic system installer or other representative to ensure that all other state and municipal
requirements are met. These may include review by the Conservation Commission,
Page 1 of 2
North Andover Health Department
120 Main Street
North Andover, MA 01845 1
Phone: 978.688.9540 Fax: 978.688.9542
9 Turtle Lane November 22, 2017
Zoning Board, Planning Board, Building Inspector, Plumbing Inspector and/or Electrical
Inspector. The issuance of a Disposal System Construction Permit shall not construe
and/or imply compliance with any of the aforementioned requirements.
Please feel free to contact the office with any questions you may have. We look forward to
working with you to obtain a wastewater treatment and dispersal system which will be in
compliance with all regulations and assure protection of public health and the environment of
North Andover.
Sincerely,
Arian.f.' I,aGrasse, CEHT
Director of Public Health
Encl. Installers list
cc: Benjamin C. Osgood, Jr., PE, 157 Bluff Street, Salem, NH 03079
Page 2 of 2
North Andover Health Department
120 Main Street
North Andover, MA 01845
Phone: 97 .688.9540 Fax: 978,688.9542