Loading...
HomeMy WebLinkAboutApproved Septic Plan - 9 TURTLE LANE 11/22/2017 DESIGN DATA PERC OLA flON RATE�4,MR S0fl-CLASS:CLASE, I LOAMY SA61) LOADING RATE,074 GAI LIONS PE�,�S(l FT DEMIGN FLOW!4 BEDROOMS x1ld,GALI IONS PER BEDROOM=,440 GALLONS SYSTEM SVE REQUIlRED'440 GAL(ONS PER DAY M 74=594,SO,FV SYSTEM SIZE PROVIDED�USE A ZX X 30' PIlPE IN ST(DNE LE&L,A FIELD WITH 600 SQLIARE FEET OF LEACH AREA. SEPTIICTANK REQUIREE)�200%OF DMLY H OW(440 GALLONS x 2 8PA)(ALLONS) SEP"11C"'r'ANK PROWDED, USE NEW1500 GALI ON SEPT1C.."TANK PUMP CHAMBER: USE NEW 1000 G)kLLON PUMP CHAMBER PERCOLATION TEs,r DATE: 9-22-17 HOLE# N/f-;' P'T'l ell ELEV OF PERC 9635 DO"ITI-i OF PERG, 2472,00' GUILD START PRE SOAK 9-49 END PRE SOAK 10�05 TIME @ 12" 10,05 ('0MA4(')NWFAjTff TIME @ 9" 1014 'nME @ 6"' '10 26 MASSACTIuSu"ns .IMF(9._6')1 12 WNUTE RATE MIINANCI-1 4 MINANCH N/F ADAMS PERCOLATION TESTPERFO�'MED BY BENJAMIN C OSGOOD,JR.AND WITNESSED BY ISAAC ROWE,NORTH ANDOVERHEALT'll f)EPARTMENT'REPRE�SEN"rA,'�'IVE, LIMIT OF SAND,/ PROPOSED 1000 GAL.1_0 N LOCAL UPGRADE APPROVALS 9 TtY.W.1"LE L,ANE POLY BARRIER- PUMP CHAMBER 'L ALLOWTHE REDUCTION IN"OlE REOURED OFFSErBETWEEN THE BOTTOM OF THE LEACH 4" SCH 40 PERF. PVC AREA FROM4'REQUIRED BYTITLE5 SECTION 195,212(1)(A)TO. 3' PROP. '1500: GALLON ASSESSORS MAP 1-06B 101" 104 28.23' + LEACH P'IPE 4J�579 S.F. R= 25.(X)' All 1�p, SEPTIC TANK N/F S = 0,0057' /Z GIRLD 20' X30" LEACHFIELD ING SEPTIC 'T'ANK 14 OBSERVATION PORT 9TUR"I'LE LANE GENERAL NOTES NiF ASSESSORS MA GALIAGIffilt 4 �P 106B Im 104 EXISTING POR(30FUDECK 43,579SX R-2$NY SYSTEM NO,r DESIGNED TO ACCOMMODATE A GARBAGE GMNDER, 2, SYSTEMSFALL BE MAINTAINEi)BY PUMPING EVERY TWO YEARS OR AS OTHERNSE REQUIRED BY Traf 5, LEACH FIELD _R HEALTH DEFIAR"I"MErfr'REPRE�SENI"ATIVL �ls 1 E)EEP OBSERVA"nON 110LES P�,RFORMED ON SEID7EMBER 22,2017 BY BENJAWN C. OSGOOD,JR AND WrrNESSED BY ISSAC ROWE, 9 NORTH ANDOVE 97 9 4. DME'LLING L.00ATION, TEST PtIA.0CATION,AND"roPOGRAPHIC INFORMA7110N TAKEN FROM AN ONT'HE GROUND SURVEY PERFORMEE)BY BENJAWN C.(,)S(300D,JR., 0 5, TFfERE ARE NO WFIA-S LESS T�AN 100 FEET FROM THE PROPOSED SUBSURFACE DISPOSAL sys,rEM md 10 PORCH -ANDS LE13S THAN 150 FEET,NIO TRIBUTARIES LESS"r��N 325 FEET,NO RESERVOIRS LESSTMIN 400 FEETAND 6. THEREARE NO V%E"T'l po"I'll "TEW NO DRAINS LESSTHAN 50 FEF--I FROM THE PROPOSED SUBSURFACE DISPOSAL SYS PORCI xtsnW3 rAWUjlw; so DIISPOSAL sys,rEM,EXCLUDINC, EDTO FURNISH DESIGN AND CONSTRUGr�ON PLANS FOR THIS SUBSURFACE 7. BENJAMIN C OSG(Xm)D,,JR RE, HAS BEEN RETAINE CON'STRUCTION SUPERVISION, BENJAMIN C.OSGOOD,JR,RE.CER"nFIES THAT " 'I r P AN CONFORMS TOTHE RULES OF'J"ITLE 6,EXCEPT WHERE NOTED, NO GUARAN`rY OR WARRAwry,EXPRESSED fj I, RAISE SHED DECK TO"THE CLIENT OR UL.TIMATE U SER NTH RE$PECTT0,FUTURE SYSTEM FUNCTIONING, OR IMPLIED,IS MADE VII 8, LOT LWES SI-K)WNAR- E FORTHE USEOF INSTALLINGTHE SUBSURFACE DISPOSALSYSTEMONLY. 9, DEED REFERENCE: BOOK 4031 �)AGE 1(97 REGORDED AT ESSEX NORTH REGISTRY OF DEEDS. DWELLING blow 1(11� PLAIN IREFERENCE�PLAN7574 NORT11 ESSEX REGISTRY OF DEEDS �jj 970 IP2 0 P40 CHANGES ARE TO BE MADE 114"THE FIELD WITI #9 -IOUTAPPROVAL,OF' 11 IE BOARD OF HIE v ',ALTH AGENT AND Tf IF CONDITIONS ARE r'OUNID W"IFIE FIELD CONTRARY TO THM PLARTHE D,ESIGN ENGINEER SHALL BE NOT�F-IE DESI1133N EN(31NEER, _t - c PLAN, IED"TO REDESIGN THE '12 S I I_L,77" 96- TpVPTl_ THM PROPERTY IS N07 LOC,,ky'��vD IN A NITROGEN SENSRIVE AREA, 13. 7 HIS PROPERTY IS NOT LOC ATUD IN THE WATERSHED,OF LAKE C010 ilICHEWICK (jil CONSTRUCTION NOTE.S, t SCOPE OF W( D-BOX -92�67 1%110 N I'HE MORE RESTMICTIVE PROV01 40N SHALL APPLY. 'T'ALLATION 0F$LfflSURFACf,,SEWAGE DISPOSAL SYSTEMS IN THETOWN OF NOR TH ANDOVER,WTHE EVENTOF A CON I ,"�zz PLAN IN ACCORDANCE W1114 311,CMR 15-00 STATE ENVIRONMENTAL CODE TITLE 5 AND 1 HE MINIMUM REQUIREMENrS FO�R THE (FMD) 1�< I rHER INCOEN'fALS NECESSARY TO SATISFACTORILY COMPLETE�rHE WORK AS SF10WN ON THIS If., J+ MATERIALS,EQUIPMENT,AND C 'ACE SEWAGE DISPOSAL SYSTEM INCLUDING THE FURNISHING OF AIA. I ABOR, 00 GAUAGHM ZRK� INSTAIJA110N OF SUBSURF 1.IC'T, 0 0. .......... 100 2. CONTRACTOR SFIALL ENGAGE 1:ESIGN ENGINEER TO PROVIDE AS-BLY11-11"PLAN AND CERTIFICATIONTHAT GONSTRUC,710N 3 TP 2" (30MPLIES WTHTHIS DESIGN R AN, " , I X AI OVERALI, SITE PLA,,,N ED NIT'HIN A 5 FOOT HORIZONTAL DISTANCE FROMTHE SOIL ABSORPTION SYSTEM AND REPLACED HORIZONS SHALL BE REMOVE -ERIAL,SPIEURCALLY THE FILI.AND(c,)LD A VENT 3, rOP'SOIL,SUBSOIL, INCLUDING I HE EXIST ING SAS AND OTHER UNSUITABLE MAI TiON 15,255 PARAGRAPH 3 AS REVISED ON C ro ER 20, BENCHNIARK-� V0 1111 SAND MEEIIN(.3� rHE GRAIE�NT0N REQUIREMENTS OFT'ri-LE 5,SEC 1995 TOP OF SAND SliAll.BE A'CrHESAMF S("ALE 1 50' 7, 4. FILL USED Sf HCHAMBEIRS, 100, 94 Cf AMBERS SO THkr SAND"LL EXTEND TO A MINIMUM DEP`TH OF 6"'BELOW THE BOTTOM OF THE L.EAC ,UI4"ABL.�ENA"l'URALC)CC(JRRING',',O�1-1,'3WTI,,I�NV'OFI'�-JE OTTO OFTHEINFIL.TrIATOR BE REMOVED IN THE EVENT F ELEVATION AS TOP OF THE WFILTRATOR CHAMBER&ADDITIONAL SOIL SHAI Ir 8 M NAIL IN TREE -'ER DELrETFRIOUS MATERIALS, -IAI..,L BE CLEAN AND FREE FROM LARGE STONES,CONSTRUCTION DEBRIS,,STUMPS,OR OTT ELEV = 1001,00 \vl, (ASSUMED) S SHAIA BE LOCATED PRIORTO CONSTR1juriON, 5, UNDERGROUND(YnUTIE, 6 1ASTURBED AREAS, �NCLUDING'ViOSE DAMAGED BY VEHICLES AND EQUIPMEN"'r ACCESSING SITE,S�Wll,BE FINISWGRADED AS TP 1/ P,r I SHALL REMAIN ON SITE� ,514OWN AND TOPPED wrm 4 IW',11ES OF TOPSOIL, RAKED FREE OF s,rONES,FERTILIZED,,AND SEEDED, E,.`XuTrING"I'a. PS0II_ B OA 7 ........I...11/1 7, TREES, BRUSH,SHRUBS,AND OTHER VEGETATION SHALL, BE CUT FLUSHTO 7HE GROUND, STUMPS SHALL.BE REM0VED, 7 CLEARED MA,rERI,ALS ANO E`XCEI'�S SOILS MATERIALS SHALL BE DISP0,SED OF OFF SIT'E, A z OF PROPERLY, 1 11 1 8, EEMSTING SEPTIC TANK SHALL 80, PUMPED,CRUSHED, REMOVED AND DISPOSEF __EXISTING PRESSURE 9 BENCHMARK- SPIKE IN TREE, El-li VADON=, 100,00(ASSUMED DATUM) P'nclANK&DISTRIBLJT�ON BOX SHALL BE PLACED IN 12"LIFrS AND MECHANICALLY COMPAurEf3i D/ `E 10 I­ILL UNDER"f'FIE SE' WATER SERVICE I I PIIPE PENETRA,rims IN FOUNDA"JON, SEPUC TANK, AND mrliw'TiON BOX SHALL BE SEAL,ED WITH HYDRAULIC Cr,,ME .....I.I... ........... I Ul '12� PIPING SHALL.BE 40 PVC LAID INA STRAIGHT'LINE ATAC0NSI%TENTGFW..)E ON A PINE COMPACTSASE. '13 MAGNIE"m LOCATINGTAPE SHAL,, BE PLACED 6"ABOVE PIPING,SEPTICTANK, DISTRIBUTION BOX AND LEACH FIELD�PIPIW,. 14 MANHOLE COVERS AT FINISH GRADE SHALL BE SECUREDTO PREVENTUNAlffliORIZED ACCESS. =7 R st,,�rION BOX 011 I-Fi RISER 15� POLY BARRIER SHALL BE 40 Mil.MINIMUM THICKNESS, 102 16. SYSTEM STONE SLIALL f3E rX)LIB�'E WASHED AND FREE OF�RON PARTICLES, FINES AND DUST IN PLACE. TOI 001fiN 6"OF FlNISH GRADE LEGEND INVERT IN 96,541 INVERT OLI"T'96.37 101 R�SERS AT GRADE ELEV. 96 77 PROPOSED GRADE RISERS TO WT111N WT174 CASTIRON 2"'1/8"To 11/2"'WASHED s rONE 6"OF GRADE C 0 V ER 0 V ER 301'OF 4"SCH 40 PERF. FIVIC&=01)()51f EXISTING GRADE TOP ELEV 96.62 SOIL LOG CASIT RON COVER PLIMP ACCE&S 92.62 100 10"114"10 1-112"WASHED STONE rl3l ____ � __ AT GRADE OVER --------_- OUTLETOPENING INSPECTION PORT 40 NIL IMPERVIOUS BARRIER SOIL 110RIYX)N SOIL TEXTURE SOIL(701.,OR S011,M01-17LIN(3 99 CONNEC F PIPE E NDS TO VE,NT WIT H GWkRC0AL.F I LTER RETAINING WALL B SL� 110YR 5/6 9"MIN 2 7".-84" c I'S @48" 343"MAX. COVER EXISTING SP01 GRADES 99+99 10 YR 5t8 98 PR(.')PoSED GRADE OPE 2%MIN NO WEEPING NO TANDWIG NO REFUSAL 9"MIN PROPOSED SPOT GRADES SOIL, LOG COVE."R EMSTING GRADE TEST PIT I E1.17V 96,017 ......... 36"MAX. 99*99 97 51U..ELEV 96,56- ESll('i`W 9107 TP2 PERCOLATIONTEST 96 DEFY111 SO I,,HOR l7f)N x SOILTEXT'URE SOIL,COLOR S011,M0711,ING ...... INV� 96,12 A SL 10 Y'R 3 P� B S L 10 yp 5/6, V 95 �v� BOTTOM OF BED 27 30" LS SY 514, E LEV,915 62, 0 3o, 60' 10 YR W8 901, NO VVE.,PING NO!"4ANDING NO REFUSAL, FOUNDAT0N z LIW I OF SAND M ------- 94 INVER,r ELEV r.,.94,5 P" ESHGW (SEE CONs,r_ NOTE K3) 4"SCH 40 PVC- I z. '92 62 a�' PROPOSED SUBSURFACE 93 Lu o V) / -40 WIL�MPERVIOUS BARRIER TES"I PITs,PERFORMID ON SEPTEMBER 22,2017 BY BENJAMIN C. OSGOOD,JR,P.E.,AND '77 RECEIVED TOP EL.EV.=96 SEWAGEDISPOSAI, SYS'lli-M WfTNESSED BY ISAAC,"ROWE, NORTH AND(WER HEALTH DEPARTMENT REPRESEfTrA"nVE. B0170M REV.=94,5 9 TURTLE LANE,, NO, RTH ANDOW 92 I'vi 0 6 2 0117 R, M A I CERTIFY]D T'HE FOLLOWN(.3 N07F_ gowli ANDOVE�R ASSESSORS MAP 106.B, LOT 104 "rHE ELEVATION OF THE BOTT'(W OF SAND�S TAKEN FROM niE TF I­EALPi DET-AR11AH'IT PREPNRED FOR THA f IN NOVE'MBER 1995�PASSED THE'S(AL EVALUA rOR EXAMINATION APPROVED BYTHE DEPARTMENTOF 91 '.'$1 PITTHAT IS CLOSIES1 10 THE PROPOSED ML ABSORPTON AREA. THE ACTUAL SIT" WILLIAM DIJRF,!�,j; ENVIRONMENTAL PROTEC110N AND no'T THE ABOVE ANALYSIS WAS PERFORMED BY M;E CONSISTE9T WITFITHE EL EVA I ION OF T4E Borrom OF THE EXCAVATION PER GONSTRU('�F'�o oT REQIIARED1 r4A�N��q(l�, EXPER'T�tSE,/kN[)���XPERIENCEDESCR:�BED�N310CMRi5,Ol7. N N E 9TjjRTLE LANE�, NOR"llf ANDOVER,MA 01845 #3 MAY VAr�Y,AND,$4�ALL BE AGAAVrt-.D AS NECESSMY DUMING CONSrrRUCTION, GROUND, 90 I CERT&YTHE LOCAl IONS,, ELEVATIONI5,AND-TIES SHOWN ON T H��$PLAN RESIJLT FROM AN ACTUALSURVEY MADE ON Tj�qE SCALE: I = 20' OCTOBER -16, 2017 REVISED HAVE COMPLETEDTHE TRAINING REQUIRED T(",)DES�GN AND INSTALL THE INFILTRATOR(>iAMBER SYSTEM AND FHAT'THE PROPOSED 1500 GALLON DESIGN ON THIS PLAN CONFORMS WITHTHE MASSACHUSETTS DEP APPROVAL.F'OR GENERAL USE ANDTHE�NMI-TRATOiR 89 SEPI'IC TAW INLET ELEV,94 30 NOV 6, 2017 DESIGN AND INSTALLA flON MANUAL Fin,R V I N MASESAC,H L)SE-TTS. I "_ , ''I_� " R. RE. it lk 01ITLET ELEV,94 0:5 BENJAMIN C. OSG 300'j), j PROPOSED 10DO GALLON 157 BLUFFS'TREffr 88 PUMP CHAMBER SYSTEM PROFILE' �NLE,r ELEV, 94,00 SCALE 1 20' HOR, I"= 2'VER SALEM, Nfl 030719 OUTLET ELEV, 93,75 (978) 435-1324. (603) 458-2883 _t2= �SIGAIA IRE OF DESE 87 [)ATE cq lk SHEET W.- TIECKED BY: DRAWN BIY: B.C.O. JR. I of I B.C.o. in L OCUS MAP NOTTO SCALE MLE#: DESIGN BY: C.O.Jr. D E S'G_N I DA T A ��A N RA -E 4 0 A I 0 74(,A 4 FDRO P t S('F7ZR 0�'61N RAT L C)A .,S I_L.c)W D E �(�N Y..T� M E M&z TF � E: H(DVIllt A GRAD p L Up - _1 )cT THE R )N )W 3L RCIM'r ri _D By PAR AF F N ZK POR( I or R