HomeMy WebLinkAboutMiscellaneous - 9 TURTLE LANE 11/28/2017 SEPTIC SYSTEM INSTALLER PROJECT MANAGEMENT OBLIGATIONS
As the North Andover licensed installer for the construction for the septic system for the property at:
TUt2-4-le- LANA I
(Address of septic system) For plans by
/�"" (Engineer)
�1
Relative to the application of A Mef, "( (c-r+
(Installer's name) And dated 4;c-r, f�, t_ 2 o l -7
ri i al date
Dated Nb V 2-1 , 2--b j-I
o ay s ate With revisions dated IV « 2-0 117,
{Last re-6sed date)
I understand the following obligations for management of this project:
1. As the installer,I am obligated to obtain all permits and Board of Health approved plaits pxxox to
performing any work on a site. I must have the approved plans and the permit on site when ahy work is
being done.
2. As the installer, I must call for any and all.inspections. If homeowner, contractor,project manager, or any
other person not associated with my company schedules an inspection and the system is not ready, then
item three shall be applicable.
3. As the installer, I am required to have the necessary work completed prior to the applicable inspections as
indicated below. I understand that re uestin an ins ection without cote letion of the items in accordance
with Title 5 and the Board of Health Regulations may result in a$50.00 fine being levied against me and/or
my co=any,
a. Bottom of Bed—Generally, this is the first (V5 inspection unless there is a retaining wall,which
should be done first. The installer must request the inspection but does not have to be present.
b. Final Construction Inspection—Engineer must first do their inspection for elevations, ties, etc.
As-built of verbal OK (or e-mail to. healthdept@northandoven a.gov) from the engineer roust be
submitted to the Board of Health, after which installer calls for an inspection time. Installer must be
present for this inspection. With a pump system,all electrical work trust be ready and able to cause
pump to work and alarm to function.
c. Final Grade—Installer must request inspection when all grading is complete. Installer does not
have to be on-site.
4. As the installer, I understand that only I may perform the work (other than sii*le exccauatim)and I am required
to complete the installation of the system identified in the attached application for installation. I further
understand that work done by others unlicensed to izzstall septic systems in North Andover can constitute
reasons for denial of the system and/or revocation or suspension of my license to operate in the Tow of
North Andover, si ficant fuzes to all persong involved are also possible.
5. As the installer, I understand that I trust be on-site during the performance of the following construction
steps:
a. Determitnation that the proper elevation of the excavation has been reached.
b. Inspection of the sand and stone to be used.
c. Final inspection by Board of Health staff otconsultant.
d Installation of tank, .D-Box,pzpes, stone, tent,pump chambex, xetaitaing wall and other
components.
6. As the installer,I understand that fain solely responsible for the installation of the system as pet the
ateproved plans. No instructions by the homeowslet, eza.eral contractor, or any other persons shall absolve
me of this obligation-
Undersigned Licensed Septic Installer: 2,7 '� E (Today's Date) ll�� /7