Hi George,
I'm okay with the channel drains and landscape basins to collect the runoff, as long as the flow will ultimately be
infiltrated, and with clean-outs at the bends. You will need to show the Cultec infiltration system on the plan,
and provide design details for all the structures. It is also up to you to ensure that the depth is adequate to
prevent freezing or frost damage.
Rebecca, you might want to check with Jennifer as to whether the plants called for on the proposed landscape
plan meet the criteria for native species that require minimal watering and chemical application. I suspect some
do not.
Lisa D. Eggleston, P.E.
Eggleston Environmental
17018 W 86th Ave
Arvada, CO 8007-6741
Te1508.259.1137
hftps://mail.google.com/mail/u/0/?shva=1#search/lisa%40egglestonenvironmental.com/15blad377a7lf4da 1/1
i` I MI) )C,<-- 0 1
5/9/2017 58 Country Club Circle-atanticB4@gmail.com-Gmail Pon
Hi Lisa T7
I've attached the landscape plan and a clip of our site plan (draft only)
Because of the extent of landscaping, grading etc. we will be changing the infiltration method to utilize pre-
formed channel trench drains along the perimeter of the pool deck were possible.
In the curved area or the pool deck the trench drains are not possible and it is planned to capture the runoff
utilizing 2 yard catch basins. The basin would be placed down slope of the deck adjacent tot he landscape bed.
The raised landscape bed would enable the runoff to collect to permit entry into the basins.
All the structures would be routed to an underground Cultec system for recharge via HDPE pipe.
Questions:
Is the use of the shallow landscape CB's acceptable to you to capture the deck runoff from the curved area of the
deck?
Along the HDPE pipe runs do you prefer clean-outs or manholes at bends?
Anything I may have missed that you know you will request?
FYI this is the final landscape plan-I will submit it again with our site plan and drainage revisions
George J. Zambouras, P.E.
978-778-5035 cell
Atlantic Engineering& Survey Consultants,Inc.
97 Tenney Street
Georgetown,MA 01833
978-352-7870 phone
978-352-9940 fax
atlantic84(aa gmail.com
https:Hmail,google.com/mail/u/0/?shva=l#search/lisa%40egglestonenvironmental.com/15b1ad377a71f4da 1/1
PROP. CHANNEL DRAIN (TYP)
SILTATION a
BARRIER i
& LIMIT wF 2
OF WORK p 2 0Z
0
OSED i-F M PROPOSED S GO BLOCK p �N 'so.
FENCE RET WALL ip
DRAIN (TYP)
\i
74 a h 02 02
( N GPP� \ s o
P O P N
Rp p� tu
R
r
\ P P �4 \ \ `\ Sss � S�Re�AC = P
f SO 20 CD
,/o
1 t1 FRDM NF o �
/ PROP. LANDSCAPE CATCH BASIN
,r r
r \ 48' —
. SILTATION
0 13 N a BARRIER
& LIMIT All
�0� ` OF WORK A10
�� =PROPOSED MAP 64 PARCEL 6 & 7
\ I-.
\ PROPOSED " 1 ¢ SEG. BLOCK
/\ PATIO \ RET. WALL NIIF
E
• \, NORTH ANDOVER COUNTRY CLUB
oo Ag
� I
#58 I
EXISTING DWELLING � 3 - — PROP. CHANNEL DRAIN (TYP)
PROPOSEDr A8
WALK ^tea �� ,? r PROP. EDGE
LAMMDSCAPINiG
va
PROPOSED PSN
r
WALK i� � R,2 _ A7