Approval of Minutes of 11/15/17
A motion to accept the meeting minutes of 11/15/17 as drafted and reviewed is made by Mr. Lynch
and seconded by Ms. Feltovic.
Vote: unanimous
Public Hearings:
Notice of Intent (NOI)
242-1719, Massachusetts Ave. @ Chickering Rd. (MassDOT) (Green International Affiliates)
(cont. from 11/15)
A motion to continue until December 13, 2017 meeting is made by Ms. Feltovic and seconded
by Mr. Lynch.
Vote: unanimous
Documents
Email dated 11/28/2017, from Kristen Hayden request a continuance until the December
13, 2017meeting.
242-1723, Lots 2 & 3 Kelsey Lane (Belford Construction) (Ranger Engineering & Design LLC.)
Ben Osgood Jr., Ranger Engineering and Design, gives a brief background on the proposed
project. This is a Buffer Zone project with an isolated wetland located on the east side of the
property located off property, there is a bordering vegetated wetland on the west side which
has a vernal pool located within it. This project meets the 50 foot no disturb and 75 foot no
build to the westerly wetland, this project is in the 100 foot buffer zone primarily.
The Administrator states that this project abuts the State Forest and the trails, therefore would
like to see some of the deciduous hardwood trees flagged and saved.
Mr. Osgood states that he would try to save trees but there is a lot of work being done on the
site and he will try to save some in the back of lot 2 in the area shown as a stockpile location.
The Administrator also notes that the Commission might want to have the No disturb Zone
monumented, the standard is the 2x2 dry elate field stone wall, at the 50 foot on lot 2. Also
noted would be the Planning Board condition regarding the rain gardens.
Ms. Feltovic asks if there is a rain garden O&M and a regular O&M.
The Administrator states that there is only a rain garden O&M.
Mr. Manzi asks if there are any abutters present that would like to be heard.
No response
Mr. Manzi states that there are no abutters present.
A motion to close the public hearing and issue an Order in 21 days is made by Mr. Lynch and
seconded by Ms. Feltovic.
Vote: unanimous
Documents
WPA Form 3 Notice of Intent
Project Description, prepared by Ranger Engineering & Design, dated 10/31/2017
US Geological Survey Map 25K MASSGIS Quadrangle (OLIVER) Locus Map, prepared by
Ranger Engineering & Design
Natural Heritage Map, prepared by Ranger Engineering & Design
FIRM Map dated July 03, 2012, prepared by Ranger Engineering & Design
ed 10/16/2017, prepared by Ranger Engineering & Design
Affidavit of Service, dated 11/01/2017, prepared by Ben Osgood Jr. P.E.
Abutter List, dated 10/17/2017
Notification to Abutters
NOI Wetland Fee Transmittal Form
Copy of Checks to Town of North Andover and Commonwealth of Massachusetts
Application Checklist - Notice of Intent (NOI)
Proposed Site Plan, dated 11/01/2017, prepared by Ranger Engineering & Design
09/14/09.
242-1721, 562 Boxford Street (Street (Sirius Development, LLC) (Christiansen & Sergi, Inc.)
The Administrator gives an overview of the proposed project and a definition on the buffer
zone for an ephemeral pool habitat located within a Wetland.
TJ Melvin, Christian & Sergi, is here to speak on behalf of the applicant. The applicant is
looking to demolish the existing single family home and build a new single family home, due
to the Zoning restrictions it puts the new home and septic system with in the 50 foot and 75
foot zones. The proposed house would be 44 feet off the Wetland line and the new septic
would be 55 feet. He states there is high ground water on the site. A foundation drain is being
proposed as part of this project. This project as shown will need variances from the Zoning
Board of appeals for lot size, contiguous buildable area and a setback.
The Administrator asks if the applicant has filed with the ZBA and about the proposal for
monumentation of the no-disturbance zone.
Mr. Melvin states that no the applicant has not filed with the ZBA yet and that pole markers
are being proposed. The applicant is open to walls if that is what the Commission requires.
The Administrator states that there has been no response received from Natural Heritage.
Mr. Melvin states that no response has been received by the applicant from Natural Heritage.
There is discussion among the Commission regarding the location of the proposed building
in proximity to the BVW and the ephemeral pool, and if there is a potential to move the
proposed building over by 6 feet to locate it out of the 50-foot zone.
Mr. Lynch states a side lot line variance.
Mr. Manzi asks if there are any abutters present that would like to be heard.
No response
Mr. Manzi states that there are no abutters present.
A motion to continue the public hearing at the request of the applicant to the December 13,
2017 meeting is made by Mr. Saal and seconded by Ms. Feltovic.
Vote Unanimous
Documents
WPA Form 3 Notice of Intent, dated 11/02/2017, prepared by Sirius Development
Application Checklist Notice of Intent (NOI), dated 11/02/2017
Conservation Filing Fees
Notification to Abutters
Town of North Andover Abutters Listing
MASSGIS Locus
Copy of Check made out to the Town of North Andover
Copy of Check made out to the Commonwealth of Massachusetts
Letter, dated 11/07/2017, prepared by Philip G Christiansen P.E.
Alternatives Plan, dated 11/07/2017, prepared by Christiansen & Sergi, Inc.
Notice of Intent Plan, dated 10/30/2017, revs. 11/07/2017, prepared by Christiansen &
Sergi, Inc.
242-1722, 173 Campbell Road (Prescott) (Wood)
The Administrator gives background on this request, and states that the Commission had
asked for a survey plan at the November 15, 2017 meeting, and that a new plan was
submitted today by the applicant. The proposed project is to add a small master bathroom,
where an existing old deck was located.
Mr. Lynch would like to see the brush pile addressed as a preconstruction condition.
The Administrator asks if the Commission is going to require an As-Built plan at the end of
this project or will an Engineers certified letter work.
Mr. Manzi states that as long as it is a certified R.P.E or R.P.L.S referencing the plan
presented today.
A motion to close the public hearing and issue an Order in 21 days is made by Mr. Lynch
and seconded by Ms. Feltovic
Vote unanimous
Documents
Plan of Land in North Andover, Mass. Showing Proposed Addition Lot 10 173 Campbell
Road date: November 28, 2017 prepared by The Morin-Cameron Group, Inc.
242-xxxx, 21 High Street ((RCG) (Civil Design)
The Administrator gives a short description on this application. The request is to construct a
new 51 unit residential building behind the current East Mill along the side of the existing
Pond, the proposed Building itself is outside the 50 foot no build zone, there will be activity
within the 50 foot no build and 25 no disturb zones some of which will require waivers. All
of the proposed is within existing maintained lawn area. Currently this proposed project is
under peer review with TEC. In the proposed planting plan there are some ornamentals
proposed for the 25 foot no-disturb zone, traditionally the commission would like native
species to be planted there. The Administrator would like noted that there was a large
weeping willow that was knocked over into the pond during the Halloween storm and as part
of the plantings plan the applicant proposes to remove this tree and replace it with native
trees. The Administrator states that this project does not have a DEP number yet and is
currently being heard by the Planning Board.
Tania Hartford, representing RCG who is here with Phil Henry, Civil Design Group, and
Julie Vondrak, Wetland Permitting Consultant, The proposal is to construct 51 residential
units. This Phase is being called 2B, this proposal is also been submitted to the Planning
Board where it will be heard on December 5, 2017 meeting. RCG has also met with the
Machine Shop Village Committee to talk about the design.
Mr. Henry shows the Commissioners the East Mill Rear Building Site Plan - 5 OVERALL
SITE, to show where the proposed 51 residential units will be located. The proposed units
will be facing the current garage on Prescott Street, and the back of the units will be facing
the Pond.
Mr. Henry shows the Commissioners the Site Plan 6, to show that the proposed Building
will make use of the existing parking lot. The non-rooftop impervious coverage will increase
by approximately 4500 square feet. This area of the site gently slopes from the parking area
towards the Pond and drops approximately 3 feet over 100-150 foot distance. Due to the
ground water being high, the grade has been picked up in the design of the building making
the first floor elevation at about 97, in order to get some recharge of the rooftop underneath.
The parking lot shown on this plan will be treated via a grass swale and infiltration system.
As part of this project proposal the pedestrian walkway will be expanded for the new
building and parking area. The proposed new building will be about 380 feet long and 35 feet
deep, and 4 floors in height. Comments have been received from TEC, Police and the DPW,
Fire has not provides comments to date. Civil Design and RCG are currently reviewing these
comments and will be providing a response.
The Administrator shows the Commissioners the submitted planting plan for the project
(Table 4.3-1).
Mr. Lynch asks for a description of the Stormwater Management at the rear of the building.
Mr. Henry states that it will be an Infiltration system pipe that will run underground to collect
the runoff.
There is discussion amongst the Commission regarding the placement of the proposed
infiltration system being within the 50 buffer zone, the discussion also questions if the fire
department will require access around the building.
Mr. Manzi is reviewing the TEC letter dated 11/27/2017 staring with number 22 on the Letter
in regard to the proposed Stormwater management, have the concerns in this letter been
address or are they going to be addressed?
Mr. Henry states that he will be addressing all of the comments in the TEC letter.
Mr. Manzi asks if there are any abutters present that would like to speak.
Linda (inaudible), 4 East Water Street, states that there is a lot of wildlife in this area and
over the last couple of years there has been several trees and bushes removed and would like
to know who has authorized these projects.
development has been before the Commission several times, with respect to Stormwater and
a pipe repair. The Commission has provided permits for them to do this work.
Mr. Lynch states that it might be home owner upkeep to their personal property that might
not require permits, but if you would like to contact the Conservation Department someone
would be able to look at the area to see what the circumstances are.
Mr. Henry is showing the Commissioners the Grading and Drainage Plan 7, there is a pipe
that discharges onto the property from Walker Road and over the years it appears that the
flow has increased. One of the things that we would like to explore with the Commission is
the potential to make a hard connection from that Walker Road pipe to an existing 12 inch
RCP pipe that is in relatively good condition.
The Administrator has a concern that this would be largely untreated water discharging
directly into the Pond, one of the possibilities would be a rain garden but the problem is that
the applicant does not own the land.
A motion to continue the public hearing at the request of the applicant to the December 13,
2017 meeting is made by Mr. Lynch and seconded by Ms. Feltovic.
Vote Unanimous
Documents
WPA Form 3 Notice of Intent, dated 11/02/2017, prepared by Sirius Development
Application Checklist Notice of Intent (NOI), dated 11/17/2017
Attachment A Table of Contents
Attachment A Narrative
FIRM Map, dated 07/03/2012
Figure 1 USGS Plan, dated 10/27/2017, prepared by Civil Design Group
Site Photographs (Photo 1 View of Mill Pond facing west from bridge)(Photo 2 Proposed
location of new residential building facing west)(Photo 3 Existing parking lot located
north of the proposed building facing east)(photo 4 The of Mill Pond Bank during low
water conditions)(photo 5 existing 12-inch outfall into Mill Pond)(Photo 6 View of ROW
and former railroad bed vegetated w/Japanese Knotweed facing northeast)(Photo 7
potential wetland area at the base of the ROW slope facing west)(Photos 8 ROW outfall
pipes that deposit stormwater drainage onto the project Site)(photo 9 water flow path
across the maintained lawn from the up gradient drainage outlet pipes)(photo 10
Overland flow scouring stone dust path during storms. Water sheet flows into Mill
Pond)(Photo 11 & 12 Soil plot 1 was documented within the manicured lawn and soil
plot 2 within the overgrown herbaceous are at the base of the slope)(photo 13 Soil Plot 3
was documented within the maintained lawn area within the overflow path from the up
gradient drainage pipes)
DEP NOI Wetland Transmittal Form
Copy of Check made out to the Town of North Andover
Copy of Check made out to the Commonwealth of Massachusetts
Affidavit of Service
Notification to Abutters
Town of North Andover Abutters Listing
North Andover Conservation Commission Waiver Request form
Phase IIB Definitive Plan for Pond Building @ East Mill Cover sheet, prepared by Civil
Design Group, LLC. Sheet 1
Existing Conditions Plan, dated 05/22/2015(Revs. 10/30/17), prepared by Odone Survey &
Mapping sheet 2
Existing Conditions Plan, dated 05/22/2015(Revs. 10/30/17), prepared by Odone Survey &
Mapping sheet 3
Demolition & Erosion Control Plan, dated 11/02/2017, prepared by Civil Design Group
sheet 4
Overall Site Plan, dated 11/02/2017, prepared by Civil Design Group sheet 5
Site Plan, dated 11/02/2017, prepared by Civil Design Group sheet 6
Grading & Drainage Plan, dated 11/02/2017, prepared by Civil Design Group sheet 7
Utility Plan, dated 11/02/2017, prepared by Civil Design Group sheet 8
Landscape Plan, dated 11/02/2017, prepared by Civil Design Group sheet 9
Construction Details, dated 11/02/2017, prepared by Civil Design Group sheet 10
Construction Details, dated 11/02/2017, prepared by Civil Design Group sheet 11
Construction Details, dated 11/02/2017, prepared by Civil Design Group sheet 12
Construction Details, dated 11/02/2017, prepared by Civil Design Group sheet 13
Stormwater Management Narrative, prepared by Civil Design Group
Site Location and Description
Methodology
Soils and Ground Water
Points of Analysis
Existing Drainage Watershed
Proposed Drainage Watershed
PEAK FLOW RATE
WATER QUALITY
GROUNDWATER RECHARGE
DRAINAGE CONVEYANCE SYSTEM
COMPLIANCE WITH THE MA DEP STORMWATER HANDBOOK
FIGURE 1: USGS PLAN
FIGURE 2: SOIL MAP
FIGURE 3: PRE-DEVELOPMENT WATERSHEDS
FIGURE 4: POST-DEVELOPMENT WATERSHEDS
BORING LOGS
HYDROLOGICAL CALCULATIONS
PRE-DEVELOPMENT HYDROCAD CALCULATIONS
POST-DEVELOPMENT HYDROCAD CALCULATIONS
APPENDIX-1
MASSACHUSETTS DEP STORMWATER REPORT CHECKLIST
APPENDIX-2
OPERATION AND MAINTENANCE PLAN (O&M)
(WITH LONG-TERM POLLUTION PREVENTION PLAN)
Town of Andover Division of Public Works Letter, dated 11-22-2017, prepared by John
Borgesi.
TEC Letter, dated 11-27-2017 prepared by Peter Ellison
Enforcement Order
981 Johnson Street (Bohenek)
The Administrator givessome background on this Enforcement Order which originated when
the new home owner was looking to replace his deck and found out that there was an
unpermitted retaining wall on the property. At the last meeting the Commission made a
recommendation of possibly grading out the yard and removing the wall. So the proposal that
has been submitted to the Commission is to remove the existing retaining wall and to grade
the yard and to put a fence at the top with signage to monument the new no disturbance zone,
Mr. Bohenek has also agreed to have the Conservation Department provide the list of
acceptable plants and trees for the area.
Mr. Bohenek owner of the property states that he believes this proposal is consistent with
what the Commission asked for and that the fence is being proposed for safety measure and
to keep things out of the no disturb zone.
The Administrator asks what the proposed fence would connect to or will it be freestanding
fence that goes across the back of the property.
Mr. Bohenek states that the proposed fence would be a free standing fence across the back.
A motion to issue a new Enforcement Order to allow for the plan to be implemented is made
by Ms. Feltovic and seconded by Mr. Saal.
Vote: Unanimous
Documents
Plan of Land, prepared by Merrimack Engineering, dated 11/27/2017
440 Great Pond Road
A motion to continue the public hearing at the request of the applicant to the January 10,
2018 meeting is made by Mr. Feltovic and seconded by Mr. Lynch
Vote Unanimous
Documents
Email from Robert Prokop, dated 11/16/2017
242-1709. MOOC, 75 Nutmeg Lane (TZK)
This item is taken out of order as the applicant is the last audience member present at the
hearing.
There is discussion among the Commission regarding the proposal to accept a new record
plan showing a reduction in impervious area for both the house and the driveway.
A motion to approve the new record plan as a minor modification is made by Ms. Feltovic
and seconded by Ms. Lynch.
Vote unanimous
Documents
Letter dated 11/28/2017, prepared by Tom Zahoruiko
Plot Plan of Land, dated 06/09/2017, prepared by Sullivan Engineering Group
General Business
242-1713, COC Request, 127 Vest Way (Marino) (Serwatka)
There is discussion among the Commission regarding the project
The Administrator states that the site has not been stabilized and due to the time of year this
site will not be stabilized until next April of 2018.
A motion to continue to April 25, 2018 is made by Ms. Feltovic and seconded by Ms. Lynch.
Vote unanimous.
Documents
WPA form 8A
Letter, dated 11/15/2017, prepared by Joseph J. Serwatka
As-built, dated 11/07/2017, prepared by Joseph J. Serwatka
242-1715, COC Request, 127 Tucker Farm Rd (Moscarito)
The Administrator states that the erosion controls have not been removed and signage have
has not been erected.
A motion to continue until the December 13, 2017 meeting is made by Ms. Feltovic and
seconded by Ms. Lynch
Vote unanimous
242-1661, COC Request
There is discussion among the Commission regarding the project.
The Administrator reviews the buffer zone plantings and states the site is in compliance.
A motion to approve as conditioned is made by Mr. Ms. Feltovic and seconded by Ms.
Lynch.
Vote unanimous.
242-158, PCOC Request, 450 Bear Hill Road (Collins- Kelly) (Zachary Realty)
The Administrator states the lots are non-jurisdictional.
There is discussion among the Commission regarding the project.
A motion to issue the PCOC for lots 75, 76 & 77 is made by Ms. Feltovic and seconded by
Ms. Lynch.
Vote unanimous.
Documents
WPA form 8A
Letter, dated 11/21/2017, prepared by SKM, Amanda C Collins-Kelly, Esq.
WPA Form 4 OOC, dated 09/08/1982
Primitive Subdivision Plan of Land of Bear Hill, dated 3/14/1982
Residential Property Card, 450 Bear Hill Road
Public Lands Preservation Act (PLPA; S281; aka the Article 97 bill and no-net-loss bill)
The commission agrees to support the changes to the Article 97 legislation as proposed.
Documents
Copy of PLPA S281
A motion to adjourn is made by Mr. Lynch and seconded by Ms. Feltovic. Vote unanimous.