Loading...
HomeMy WebLinkAboutDenial - 1975 SALEM STREET 1/2/2017 i i 1 i North Andover Health Department Community and Economic Development Division January 2, 2018. Philip Christiansen,P.E. Christiansen and Sergi, Inc. 160 Summer Street Haverhill, MA 01830 Re: Lot 3 - 1975 Salem.Street(Map 106B,Lot 16) Dear Mr, Christiansen, The proposed wastewater system design plan for the above site dated December 22, 2017. and received on December 28, 2017 has been reviewed, Unfortunately, the plan cannot be approved until the following items are corrected. The specific section in Title 5: 310 CMR 15,000, or North Andover regulation that is not met by this design follows each item where applicable. 1, On sheet 1 of 2,the benchmark is shown greater than 75 feet to the proposed septic system (3 10 CMR 15.22.0(4)(q)), A note on the design plan indicating a benchmark shall be set prior to construction is sufficient, 2. On sheet 1. of 2,the test pits should be graphically depicted to accurately reflect the orientation they were dug during the soil evaluation, 3. Since the Infiltrator Chamber system is proposed as an alternative soil absorption system the "Standard Conditions for Alternative Soil Absorption Systems with General Use Certification and/or Approved for Remedial Use"will apply. Please provide the following as required by the approval conditions Section II(6): c) The record drawings, approved by the LAA, must clearly indicate an area for a full-sized conventional primary SAS and a full-sized conventional reserve area that are far the sole purpose of on-site sewage disposal; i I Page 1 of 2 North Andover health Department, Town Hall, 120 Main Street, North Andover, MA 01845 Phone: 978.688,9540 Fax: 978.688, 9542 Section litm: c) a certification, signed by the Owner of record for the property to be served by the Technology, stating that theproperty Owner.- 1. has been provided a copy of the Title 5 IIA technology Approval, the Owner's Manual, and the Operation and Maintenance Manual, and the Owner agrees to comply with all terms and conditions; 2. for Systems installed under a Remedial Use Approval, the owner agrees to jufflill his responsibilities to provide a Deed Notice as required by 310 CMI? 15.287(10) and the Approval; 3. for Systems installed under a Remedial Use Approval, the owner agrees to fulfill his responsibilities to provide written notification of the Approval to any new Owner, as required by 310 CMI? 15.287(5),- 4. if the design does notprovidefior the use oj'gjirbage grinders, the restriction is understood and accepted; and 5. whether or not covered by a warranty, the System Owner understands the requirement to repair, replace, modify or take any other action as required by the Department or the LAA, if the Department or the LAA determines the System to be failing to protect public health and safety and the environment, as defined in 310 CMR 15303. Please feel free to contact the office or Mill River Consulting at 978-282-0014 with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will I be in compliance with all regulations and assure protection of public health and the environment of North Andover. Sincerely, Brian .1.'> 'aGrasse, CEH'T Director of Public Health cc: Livingstone Development Corp. File Page 2 of 2 North Andover Health Department, Town Hall, 120 Main Street, North Andover, MA 0184,5 Phone: 978.688.9540 Fax: 978.688, 9542