Loading...
HomeMy WebLinkAbout1986-03-26 Conservation Commission Minutes TOWN OF NORTH ANDOVER, MASSACM ISETTS OFFM9 OF TELATHW,W 683-7105 „ 1a.'° w Minutes of the Meeting of March 26, 1936 Present : C. Vicens J. Lindon H. Fink T. :deter, Cons . Assistant R. Mansour M. Boudrot, Secretary Eclu urian Drive (lo _ 3A) T. :deter to check erosion control in one week. A Pell.itier to send letter to owner about Lot 23A. Lot IA Winter ,Street A Lindon motion to issue a negative determination. H. 1'u''ink second, motion carries . Bear Hill Dr. Namay of Ortho Construction owner of Lots 60 and 69 attended meeting, along with his Attorney : ohmil.l regarding our issuing an Enforcement OrderRobert Mansour made a motion to have the Enforcement lifted on both lots as they are not in our Order of Conditions . J. :Bandon secondAhtion carries. J, Undon to view lots. T. Goodwin from Designer Homes submitted an erosion control plan on Bear Hill Lots . Plan was looked at and siltation fabric was discussed. R. Mansour to review type of fabric to be used. J. Lindon motion to accept the erosion control preliminary plan to be stabilized and filter fabric installed within one week; to lift the Enforcement Orders after inspection by T. Peter, and approval of the filter type fabric. B.Mansour second, motion carries. Chestnut Green .James Manard and Bryan Casey of General Contractors Company attended the meeting; in order to discuss the violation at Building; #3. A construction pian was used it wap not the one in the Order of Conditions issued by the NACC and more than 5,000 square feet of wetland filling took place. C. Vicens motion to issue an Enforcement Order to read, " ;radi.ng, shall be pulled back in compliance with the Order of Conditions , erosion control to be placed as in Order of Conditions , and Wetland replacement plan will be rewired i n two weeks. 5 B. Mansour second, motion c rrie a . -2- Minutes of the Meeting of March 26, 1986 North Andover Business Park Lot 3 -A_ plan n required to solve the filling of wetlands by April 15th. Lot 1 - J. Lindon motion to lift the Enforcement Order. B. Mansour second, motion carries . Jefferson Office Park B. Mansour to review. Order of Conditions - Sideri Place J. LINDON motion to accept the Order of Conditions as drafted, B.Mansour second, motion carries Bear Hill - Enforcement Orders Lot 13 - J. Lafond motion to lift the Enforcement Order H—.-Fil—nk second, motion carries. Lot 59 - J. Lafond motion to lift the Enforcement Order B. Mansour second, motinn carries . Lot 67 - J. Lafond motion to issue a Notice of Enforcement Violation and to come to our Meeting one week from receipt of this Notice. B. Mansour second, motion carries . Correspondence 1. Erosion Control Plan for Bear Hull from Designer Homes. 2. Ltr. from Reginald L. Marden dated 3/24/86 ret Abbott Village Estates 3. Ltr. from Merrimack Engineering Services, Inc. , by Les Godin, 3/21/86 Re: Order of Conditions for Lot 2 Salem St. , J. Lafond to review. 4. Notice from Dept. of Army dated 3/20/86, Entitled "Proposed Regional Conditions for Nationwide Permits in the State of Massachusetts". 5. Ltr. from Peter G. Shaheen, to J. Lafond 1n regard to French Farm Subdivision, date 3/19/86. 6. Ltr. from Callan, Sullivan & Burke 3/17/86 ret Lot 19 - Lacy Street, for Certificate of Compliance. H.Fink to review. 7. Ltr. from Plannin Board to Mr. John Tuttle re : Bear Hill Subdivision, 3/2086. 8. Ltr. from Planning Board to Zak Alexani.an ret Bear Hill Subdivision 3/20/86. 9. Letter received from Planning Board re : Foster Street, Common Driveways, Lots 1A, 2A, 3A and 4A, 3/10/86. 10. Certificate of Compliance from D.E.M. re : tree cutting on North Liberty Street. -3- Minutes of the Meeting of March 26, 1986 ..11. Minutes of March 4, 1986 of the Steering Committee Copy of contract from Keith-Consultants For Open Space. 1.2 . Memo received from Board of Selectmen to Development Committee 3/24/86, re : Next Meetings 13. Request for Certificate of Compliance from Robert and Donnal Luciano re : Lot #66 - Bear Hill Road. Meeting adjourned 10:30 P.M.