Loading...
HomeMy WebLinkAbout1986-04-09 Conservation Commission Minutes OMME O CONSERVATION COMMISSION TEL.EPHONE 683-7105 Minutes of the Meeting; of April 9, 1986 Present: W. V'icens J. Tafond H. Fink B. Mansour (8 :00) Aa Resca T. Peter, Cons ® Assistant Lindon IA. Boudrot, Secretary Chestnut Green Dick Rivera of the Newport Group attended meeting. The required wetlands replacement plan was submitted. Lill was removed. Hay bales replaced. Staking, to be done. We will check site and look at plans ® J. Lindon to check into this for next week's meeting Bear Hill - Enforcement Orders A total of fifteen Enforcement Orders were sent out dude to a regional rain storm March 14th (Friday) which caused considerable siltation run off in this area and eventually into the lake. The Commission discussed the owners who have not acknowledged receipt of the Enforcement Orders. Frac met with 'Lown Counsel.to see what the next step of enforcing the Orders would be. Several Violation Notices were also sent out to get some kind of action on this problem. Re: Tot. 66 - J. Tafond motion not to issue Certificate of Compliance. H. Fink second, motion carries. A L.,afond to write to lab Luciano rem Tot 66 sae k: d� Road J. L.afond motion to issue a Notice of Enforcement Order Violation per ,lack of response to our enforcement Order and letter Notice should state that if no compliance is met that an injunc,tion will be sought within one week from receipt of this notices H. Fink Second, motion carries . To be sent to John Tuttle. The following Tots of Lear Hill will be put on next week's agenda; (Lots 33A, , , and 67) . Status on others is as follows : Lot, 28A 8c.m.nt Mr. S:a_rcaonian another Enforcement Order dated: 4/9/86 to his old mailing address Lot: 13A Site visit to be made by Wm V'icens 2 Minutes of April 9, 1986 Lot #37 ® Owner informed Tracy Peter that he would be landscaping as soon as possible. Requested to put hay bales out immediately. Require owner to put in writing by next week as to when it will be finished and hay baling placed. Lot 25A - J. Lafond motion to issue a Notice of Enforcement Order Violation, A. Resca second, motion carries. Lot 59 ® Landscaping within two or three weeks . Requested response to us in writing by next week. Put hay bales out. Lot 21B m Requested erosion control at base of easement. Lot 22C - Phone call or send letter to old address. Lot 42 ® Zach Alexanian/T. Goodwin of Designer Homes reported on this lot. Lot 62A ® Bear Hill -J.Lafond motion�issue- Notice of Enforcement Order Violation. A. Resca second, motion carries. Public Works (Town Farm Reservoir) A site visit scheduled. Needs more mulchin . Town Landfill J. Lafond motion to lift Enforcement Order due to lace of a violation. J. Lindon second, motion carries. Lot 5 North Andover Business Park To be on next week's Agenda since attorney could not attend meeting to discuss the wetland violation. Osgood Mills _ T. Neve represented Ben Osgood. Spoke at length on the new plans for Osgood Mills , and excess runoff from Davis and Furber property. Proposed wetland work will involve restoration of pond. T. Peter to arrange a site visit with Highway Surveyor. Barker Street - Discussed George Barker' s 13 acres. Crossing already has an easement through it for total impact. Needs adequate protection of wetlands . Need more discussion with Mr. Barker and Engineer to come to some kind of understanding on this project prior to a filing. Can Conservation Commission be granted some land in exchange for easement? Is the pumping station adequate enough for sewerage drainage? T. Peter to arrange a meeting with George Barker and Public Works. Smolak Farm - J. Lafond motion to issue negative determination, conditional after we receive additional erosion protection measures plan to protect behind the construction site. J. Lindon second, motion carries. Lot 33 Vest Way - J. Lindon motion to issue a Notice of Enforcement Order Violation, that all work shall be done in one week from receipt of Notice and to attend next meeting. Send original to owner and copy to Police Chief. J. Lafond second, motion carries . 3 Minutes of April 9, 1986 French Farm Ville One of the members of the French Farm Association expressed grievances and notified the Commission that the Association is working with the Attorney General ' s Office. T. Peter will make an appointment with Town Counsel to discuss French Farm prior to our next meeting. Barker Street Trust is expected to submit a schedule for completion of this project by April 15th. Lots 1,2,3 and 4 - Liberty Street - J. Lafond motion to accept all four Orders of Conditions as amended. J. Lindon second, motion carries . Lot 4 Chestnut Street ® T. Peter to write a letter to Coolidge Construction on Lot 4 Chestnut Street. Expect to see a swale from back of Lot 4 connecting to Lot 1 and toward wetland area. Meeting adjourned at 10: 10 P.M. I