Loading...
HomeMy WebLinkAbout1986-06-18 Conservation Commission Minutes TOWN OF NOR rH ANDOVER, MASSACHUSETTS y OFFICE CONSERVATION COMMISSION 'yc�t ria 4N �� as TELEPHONE 683-7'105 hN S�y'q Minutes of Meeting of .June 18, 1956 Present: J. Lindon L. $ruinoog B. Mansour C. Schoene H. Vicens T. Pyr, Coni. Admin. A. Resca M. Boudrot, See. Lot 63 Rvar reenDrive At a site visit on ,June 17 it was noted a filling of loam had been made recently. Establishing the length of time it was there posed a problem. It was suggested that a consultant who could examine site as to when filling had taken place, namely arborist, Ellen Chagnon should be retained to suggest corrective action. 2C-3C Great Pond Road ii. Fink motioned to ratify Enforcement Order on Creat Pond Road. B. Mansour second, motion carried. Lot 6B Patten Lan - Enforcement Order B. Mansour explained plans showing a steep grade that needed a dbuble row of hay bales for erosion control. It was suggested a site visit be made to inspect the placement of erosion control. On 6/23 received a call from B. Mansour recommending a lifting of the Enforcement Order. Lot 36 - The Pine W. Vicens to check the film - this is possibly a negative determination. Sideri Place A site plan review was made by the Planning Board. T. Peter to write Planning Board. We accept items listed, in letter of May 28, 1986, a.s part of ruirements in Order of Conditions. W. Vicens stated conditions mee ith the revised plans. B. Mansour second, motion carried. Coventy I Retention Pond YL4 A c�uestion e up as to whether this area was mentioned in the original Order of Conditions. This area is under consideration for town property, Town wants NACC® s approval. T. Peter to make site visit, and Willie to check calculations. 2 Minutes of Meeting of June 18, 1986 North Andover Business Park James Bourgois from Channel attended meeting, he is the replacement for Jehanne Arslen. A lot of questions still unanswered for the NACC were stated. Mr. Bourgois said things had slowed down due to a re-organization of Channel, but they would work on this unfinished business. W. Vicens requested a letter from them by July 14th answering some of these problems. A review would take place on July 2nd, and July 14 on the back of Lot 3. Lot 9 Tucker Farms Henry Fink to contact J. Philbin regarding this area. This will be placed on next week' s Agenda. Re-a eni.n of Lot 5A Salem Street - Public Hearin Richard Habib, owner of Lot 5A Salem Street presented changes to the Boardfor altering land in his backyard (1,000 square feet) . A letter from Karen Nelson, Town Planner was read - a Special Permit-Public Hearing, will be required. (Negative recommendation) . W Vicens mentioned that no work within 25 feet of a wetland allowed at this time. J. Lindon suggested a meeting with the Planning Board should be made by next Monday bight, and a decision made next week. W , Vicens motion to close public hearin on Lot 5a Salem Street, take matter under advisement and amend Order o Conditions by next Wednesday. A. Resca second, motion carried. Lot 3 Marblerid a Road -Determination Owner by Joseph and Angela Cavallero for an addition. Ano Correnti, builder represented owners. Would install haybales to protect the lawn. H. Fink stressed his opinion on conversion from septic system to sewer line. Letter from Planning Boar* read. W. Vicens motioned to close public°rearing, issue a negative de e eSc� SeCOt11e�, tYE0,1lptT1 G lar i h haybaies. Route 125 - B -Pass Bob Carter, engineer out of Danvers Office of the Comm. of Mass. , Public Works, appeared before the Board. At Station #59, crossdrai.n, headwall. has deteriorated, needs to be rebuilt. A detailed plan will be needed for this repair work. W. Vicens motion to close Public Hearing on Route 1.25, H. Fink second, motion carried. Lot 1 Berry Street - Public Hearing To alter land for the proposal of a warehouse and office building. Robert S. Brustlin, representing owner Rivers D_ ev.Corp. presented his plans . Also, Alan Clapp Sr.Proj . Eng. attended meeting. (29,800 feet involved) flans were presented and discussed. Nancy Hogan, an abuttor spoke with concern for drainage onto her property. W. Vicens motioned to close public Hearing, issue Order of Conditions in twenty-one days after receipt of n carried. topo map. A. Resca second, motio - 3 - Minutes of Meeting of June 18, 1986 Lots IOB, IIA and 12A - Laconia Circle - Public Hearing Re-Opening Mr. Pellitier presented his plans to the Board regarding increase in replacement area, and stream in letter form. W. Vicens motioned to close public hearing on Lots 10B, 11A and 12A, take matter under advisement and issue Order of Conditions within 21 days. Motion carries. Lot 7 - Salem Gardens/42 Bannan Drive - Public Hearing W. Vicens, being the owner of Lot 7 - Salem Gardens represented himself. The purpose of this hearing is to construct&swimming pool along the back of his property. 400 square feet of wetlands to be altered for construction of lazy.mL" shaped pool. Brook runs along back of property. Will stay as far away from the main wetland as possible. The area will be staked and hay baled at the edge of the proposed work. No replacement area proposed but if need be it will be done. B. Mansour motioned to close public hearing of 42 Bannon Drive, Salem Gardens for the purpose of issuing an Order of Condtions. A. Resca second, motion carries. W. Vicens abstained: Lots 24-28 Forest Street - Order of Conditions We have single driveways, double driveway crossings - 2300 square feet of filled wetlands, two areas involved. Discussion with the Board, Phil Christiansen and Mr. Simmonds of the Planning Board on common driveways, and replacement areas. W. Vicens makes a motion we issue the draft Order of Conditions we have amended tonight on Lots 24-28 Forest Street as soon as we receive file no. H. Fink second, motion carries. Lot 1 - Carriage Chase - Order of Conditions G. Vicens make a motion to accept draft Order of Conditions. Henry Fink second, motion carries. 4-2 (2 abstained) File 4242-352. Deerfield Lane - Order of Conditions Phil Christiansen represented owner. Spoke on wetland replacement areas. Bond issue $30,000. G. Vicens motioned we issue the amended draft Order of Conditions for Deefield Lane File '#242-348 as amended. R. Mansour second, motion carries. Correspondence Ltr. from Robert Luciano requesting Certificate of Compliance for Lot 66 Bear Hill. W. Vicens motion that A. Resca visit site and issue Compliance if it complies with the Order of Conditions. H. Fink second,., Loam and seeding was recommended by the NACC. Motion carries Request for Certificate of Compliance of 914 Turnpike Street, File #242-190. H. Fink motioned to issue a Certificate of Compliance for 914 Turnpike Street. W. Vicens second, motion carried. - 4 Minutes of .Meeting of June 18, 1986 Corresj2ondence Action Required Ltr. from Karen Nelson Re : Lot 3 Marbleridge Road. Plans for Lots IC & ID' Equestrian Estates . Compliance Request Lots 1 , 2 and 3 Turnpike Street, Letter from Channel Building updating construction of the North Andover Business Park. Wetland Replacement Plan - Lot 6B Patton Lane . Plans of Lot 8 North Andover .Business Park: Letter concerning extention on Lots S & U Flagship Drive. Outgoins Letter to Watershed Committee concerning Site Visit. r Letter from T. Peter to Planning Board Re : Meeting of July 30, 1986. Letter to owner of Lot 67 Bear Hill, Letter to Donald Stoddard of DEM Re : Land under Chapter 61, Letters to State Rep 's Re : Bay Circuit Funding. Letter to Planning Board Re : Lots IC and 1D Equestrian Estates. Letter to Charles Salisbury Re : Property off Duncan Drive. a, Incoming Letter from C. Hicks re : use of Selectmen' s Meeting Room Letter from K. Bergman Re : Purchase of typing table . Water Resources Information _ Mass . Audubon Society Environmental Notification Frorms for Nursing and Retirement Center. Meeting adjourned 12:30 A.M.