HomeMy WebLinkAbout1986-09-17 Conservation Commission Minutes TOWN OF NORT14 ANDOVER, MASSACHUSETTS
oproricr o f cel., � 44611
CONSERVATION COMMISSI
1102, iH
0 TELEPHONE 683-7105
�1Wm�"wMwALL�PLL hp �vW�S9
Minutes of Meeting of September 17, 1986
Present: G. Vicens C. Lowery
A. Resca C. Schoene ($:00 P.M.)
J. Lindon T. Peter, Conservation Admin.
L. Bruinooge B. Mansour (Absent)
M. Boudrot (Vacation)
Minutes of July 2, 19$6 and September 3, 1986 were reviewed. J.Lindon motion,
to accept the minutes of July 2nd, and September 3rd. L. Bruinooge second, motion
carries.
_ABC Bus Comps
Charlie Carroll attended meeting. The NACC discussed the wetland replacement
area which is in progress. The applicant will consult with a botanist for
advice on tine re-vegetation of these replacement areas.
Lot. 4 Gray. Street
A site plan review was discussed. New grading of the lot is proposed around
the house. A site visit is necessary in order to determine if the proposed
grading is a significant change to the Order of Conditions.
Lot 71, - Bear Hill
Compliance Request - A site visit was made by T. Peter. The lot is
unstabilized behind the pool area and therefore, a Compliance was not
recommended.
Lot 5A - Salem Street
The location of the house was discussed. There is a possibility that the
house location and grading are not built as shown on plan. T. Peter to send
letter to Mr. Habib requesting; 1. owner to send an as-built plan of
house location and grading location. 2. To stabilize the lot as soon as
possible.
Lot 3 - .Carltsan..._ Farms.
Request B. Osgood to attend next meeting to discuss wetland restoration plans.
He may invite builder of Lot 3 ,
WiAthrolp:." etenu the appeal site visit with Brook Monroe of DEQE. C. Lowery
was unable to attend the site visit but did call B. Monroe prior to the site
Page -2-
Minutes of Meeting of September 17, 1986
visit to discuss reasons for the Commissions findings outlined in the
Order of Conditions.
Meadow's Property
A site visit was made with the NACC and Steven Stapinski of Merrimack
Engineering on September 13, 1986. W. Vicens will draft a letter for
approval at our next meeting.
Lots 1, 2 and 3 Candlestick Road - Continued Hearing on Determination
David Minicucci represented the applicant. A more detailed plan showing
proposed grading was reviewed. Grading will take place less than ten
feet from the wetland line. L. Bruinooge motion to issue a positive
determination on Lots 1, 2 and 3 Candlestick Road. C. Schoene second, motion
carries.
Lots 15 and 16 - Salem Street - DEQE #242-299
Our request for proof of a special permit to construct a common driveway
was not provided. J. Lindon motion to issue an Enforcement Order to stop
all work until the Conservation Commission determines that Conditions #3 and
#13 have been complied with. A. Resca second, motion carries.
Coventry Il - Consultant
J. Lindon motion to authorize T. Peter to spend up to $2,000.00 (an
additional $800 from the previous allotment) in order for IEP to perform
a review of the additional technical information. C. Schoene second, motion
carries.
Lot 47A - Salem Street - Order of Conditions
The revised plan is significantly different from the previous plan which was
presented at the Public Hearing. Draft/Order of Conditions is a denial. C.
Schoene motion to accept the Order of Conditions as revised for File #242-364.
L. Bruinooge second, motion carries.
Lots 24-28 - Forest Street - File #242-349
Kurt Young, from the Preservation Service and Phil Christiansen of Christiansen
Engineering represented the applicant. A drainage plan was presented as
required by Condition #14. L. Bruinooge motion to accept the plan entitled
"As-Built of Drainage System located on Salem Street" by Christiansen Engineering,
dated September 17, 1986, as required by Condition #14. C. Schoene second, motion
carries. J. Lindon was absent during the motion.
Page -3-
Minutes of Meeting of September 17, 1986
ker Farms
Kurt Young of the Preservation Service and Phil Christiansen of Christiansen
Engineering represented the applicant. An "As-Built" wetland replacement
plan was presented and discussed. A bond release was requested by the
applicant. The matter was taken under advisement.
Shannon Lane
Kurt Young of the Preservation Service and Phil Christiansen of Christiansen
Engineering, represented the applicant. A wetland replacement plan was
r
presented and discussed. The plan will be reviewed by J. Lindon.
Affiliate Members
The NACC will discuss the subject of appointing affiliate members at the
Selectmen's Meeting of September 22, 1986.
CORRESPONDENCE
Action Required
Ltr. from Christiansen Engineering Re: Lot 23-28 Forest Street Wetland Replacement
Contract from Ellen Chagnon Re: French Farm Village - Evergreen Drive - L.
Bruinooge motion to authorize spending up to $400 for consultant fee. J. Lindon
second, motion carries.
75% CBA Plan for Lots 1, 2 and 3 Salem Street - T. Peter will make a site visit.
Lot line change at Francis Estates
Bill for Consulting Services from IEP, Inc.
As-Built plan of Wetland Replacement for Tucker Farms
Extension Request for North Andover Business Park
Extension Request for General Store Realty Trust - Fil,e 242-1$2,Osgood Street.
Outgoing
Ltr. from T. Peter to Merrimack Engineering Services Re: Teoma Estates I
Ltr. from T. Peter to Forbes Realty Trust Re: Lot 22 Forest Street, Enforcement Order.
Ltr. from 'r. Peter to Lally Associates Re: Proposed Water Treatment Plant
Page -4-
Minutes of .Meeting of ,September 17, 1986
CORRESPONDENCE
Outgoing
Ltr. from T. Peter to Anthony Foresta Re: Village Woods
Ltr. from T. Peter to A.J. Lane Co. Re: Erosion Control at The Pines
Ltr from T. Peter to Blueridge View Construction Co. Re: Erosion Control at Lot 29
Bear hill.
Ltr. from T. Peter to Equestrian Estates Assoc. , Re: Lots 10B, 11A and 12A
Equestrian Estates
Ltr. fro T. Peter to Mike Smolak Re: Ownership of Orchard Path (Coventry Estates 1)
Ltr. from T. Peter to MACC Re: Order of Conditions.
Information
Ltr. from Brenda Clark to DEQE Re: Appeal to Coventry Estates II - Utilities
ltr. from The Essex County Greenbelt Assoc. , to Land Vest Re: Proposed Utility
Eastment in Purgatory Swamp.
Ltr. from DEQE Re: Appeal of 34A Carlton Lane.
Executive Session - Lot 34A--1 Carlton Lane
J. Lindon motion to adjournthe meeting and go into executive session for
purposes of discussing litigation of Lot 34A-1 Carlton Lane. A. Resca second,
motion carries.
Regular Meeting Adjourns 10:20 P.M.
Executive Meeting Adjourns 10:35 P.M.