Loading...
HomeMy WebLinkAboutMiscellaneous - 1975 SALEM STREET 1/29/2018 (2) North Andover Health Department Community and Economic Development Division January 29, 2018 Livingstone Development Corp PO Box 50 Tewksbury,MA 01876 Re: Subsurface Sewage Disposal System Plan for 1975 Salem Street—Lot 2 (Map 10613, Parcel 16, Lot 2) To Whom It May Concern: The proposed wastewater system design plan for the above site dated May 5, 20:17 with a final revision date of January 17, 2018 and received on January 18, 2018 has been approved. The design has been approved for use in the construction of a.new on-site septic system for a five (5)bedroom, eleven(11) total room residential dwelling utilizing gravity leaching trenches. This design plan approval is valid until January 29, 2021. During this time, a licensed septic system installer must obtain a permit and complete this work, and a Certificate of Compliance be endorsed by the installer, designer and the Town of North Andover. This approval is also subject to the following conditions: I. Prior to the issuance of the Disposal Works Construction Permit,the applicant must submit a foundation as-built at the same scale as the approved plaza.. 2. Prior to the issuance of the Disposal Works Construction Permit, the applicant must submit the floor plans of the proposed dwelling showing no greater than five (5) bedrooms or eleven (11)total rooms. 3. Prior to construction,the designer must establish a benchmark within seventy-five (75) feet of the proposed system. The location and elevation of the benchmark must be submitted to the Health Department, Page 1 of 2 North Andover Health Department Town Hall, 120 Main Street, North Andover, MA 01845 Phone:. 978.688.9540 Fax: 978.688. 9542 1975 Salem Street—Lot 2 January 29, 2018 4. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation,the originally issued Disposal System.Construction Permit is void, installation shall stop, and the applicant shall reapply for a new Disposal Systems Construction Permit (3 10 CMR 15.020(1)}. 5. It is the responsibility of.'the applicant and/or the applicant's septic system designer, septic system installer or other representative to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector and/or Electrical Inspector. The issuance of a Disposal System Construction Permit shall not construe and/or imply compliance with any of the aforementioned requirements. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. Since ly, Brian J. .,a(Jrasse, CERT Director of Public Health Encl. Installers list cc: Christiansen & Sergi, Inc. 160 Summer Street, Haverhill MA 01830 File I Page 2 of 2 North Andover Health.Department Town Hall, 120 Main. Street, North.Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542