October 2 , 2013
Joseph D. LaGiasse, A/A
Director and Coordinator . the North Andover Historical Society
53 Academy boa
North Andover, MA 04 8.45
Parson Barnard, House and Barn, North Andover
Foundation Repair and Tree Removal
Conservation Conditions of Approval, NACC #120
Pursuant sections 4ed a small.4.2 0 the North Andover t1 ProtectionRegulations,Joseph L Gr . ,
applicant X 3 cation
project
House and Barn 179
t
Osgood Street,No t..Andove;. Onlyor h work proposed were approved under ems ,
including: ,rebuilding the foundation wall under the.east ell,portion, of the barn buflding (as on the
plan referenced axe and removal and gibing of trees adjacent to the house builcling to reduce
seeding and inoisture,prior to a roof restoration. All tee rmova1will be conducted,inor aan 25" from.
the bsite.
machinery allowed,within the 25' -disturbance Zone. Erosion control will be installed for tie
foundation repair work.
During the October 23 2013 public meeting, he North ndove C n -rrCommission (NACC)
voted unanimously o approve tl-)is,project.,The following conditions are herebymandated:
RECORD DOCUMENTS: Application Checklist
Pro'ect Narrative Description/Scope of Work
Parson Barnard Site Plan N e alPhoto)
Barn RestorationSite Wore.(Sheets C1 &Al)
t
Application Received: October: 7, 2013
Prepared by:Joseph D. LaGrasse,A/A
CONDITIONS,
1600 Osgood Street,Stine 2035,Norte Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9,542 Webvxv-% . w' t ,,oven /� con .lion ;
1
Prior to the start of work the owner shill ensure i *actorµhis reviewed the small, project
pertTdt and is aware of the wetland resource areas ande i .its of the proposed work.
2. Only wore authorized above is permitted s part of the Small.Project approval. Retaining will,and
parkinglot construction.must be filed for separately as they are,not approvable as a Small Project.
I Prior to the start of work erosion,controls will be installedbetween the workarea.and the down
gradient i s ince ares as shown on the approved plan. No work wiU, occur beyond the erosion
controlline.
. Trees to be removed ill be marked with flagging tape 'in the field.,
5. Once, erosion control is illstalled and the trees, are.marked, dt Conservation epartm. nt wiU conduct,
an inspection to certify that the erosion ntol is properly in,.stalled and the trees are mote than 25
:oma. the wetland resource area.
6, Excess m te.rl sproperly disposed of offsite. No rnaterial,shall be stockpiled on site.
". Acceptedn ' rig' and construction standards rocedur shall befollowed '
completion of the pr .
8'w Upon completion of the approved project a. ., ..site sta.. IzIat on, please contact ffie Conservation
w
Department for afinal inspection.
' '. .is permitshall ex to 9 months ft m the date of issuance.
Should,l o have any question or coiYitnents ,regarc1ing the contents of this letter, please do not hesitate
contact the undersigned at 978.688.9530 at your earfiest convenience.Thanking you in advancefor your
anticipated . o er .tion ti-i this matter.
Respectfully,,
ANDOVER CONSERVATION A TME T
e
enir „gs
C -tvation Administrator
1600 Osgood Street,Suite 2035,NorthAndover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9, 2 Web lwww. tt / w.t not ,, eu l h, -
d
b, y
f
1.......
NOR"I'lli ANDOVER
NARRATIVE DESCRIPTION/SCOPE OF WORD LCONSERVATION COMMISSION
c
;site and, building si at the, Parson Barnard House and Barn are in the process of beingrestored to
their natural beaut F Portions of the barns foundation wall have crumbled and the structure has been,
i
seriouslyweakened. The plan is to rebuild the foundation wall under,the rear ell portion and stabilize
, Wm �G � �v�� ww��,„�������»�m YYYY�W ,Y���� �o� h�« w.
the building. The existing 1 r d,�s ne� retaining wall has r mbled«and det n rate d The plan 'i �
i„f� mmm 'n xnnww;wimWwwew'.mmtlU
urm
rebuild thel stone wall closile t existing the location and extend the length along the existing slope t
stabilize the eroding slope.
In addition to,the stone wall and foundation nder the existing barn,the plan is to re-shingle the Parson
Barnard house roof. The existing roof has deteriorated'faster than it should due to the shading of the
overhanging tree limbs and leaves. This application is to, request permissionAo remove afew trees
around the house and barn in order to complete the necessary planned renovations,. The site plan
shows which trees we would like to remove,that will inter erel with the planned renovations.
The reconstruction of the retaining wall will begin after the siltation fence and hay hale are installed.
The hay bale fine 'is,approximately 67 feet from the work planned., The earth work will he limitedt
mar weir later on the wetland side of the stone wall'. Any machine e werN, (masons lull r bob cat)will
e from the existing parking and gravlel area on the street side of the existing wall.
The re-rnll fing, trim, and ether repairs to the Parson Barnard house will require staging within 8 feet of
the gall exterior. Siltation and hay bales are not planned r the, reroofing.
Ahe tree
„r„mme,m.o �almmsW” planned are allwith�inV��2 f,eet the Q��sWµ"e...,, The
N tree stumps,
t. masr can remain in the
ground.
i
The work on the barn is planned to commence,as soon as possible and prior to November , 2e IIN The
roofing at the Parson Barnard House is planned for November and as weather permits.
The word as described ahleve deer net have any ptential irrrpwact to the wetland resource.
Thank you,
Joseph D. La rasse,Al
(Director and Coordinator for the North,Andover Historical Society
153 Academy Road
Direct Lire 97 -8 '-3719 r
d
4
�'3
NoRrH ANDOVER
44cs4 CONSERVATION COMMISSION
APPLICATION CHECKLIST all Project
i
ProjectLocation: 171 Osqoop 15*rae.eof
1
Applicant.-NA, 1A*T'aJZACALo-, 154DCAddress, 15�1 AICAVIEMY Phone-118 &Np 3�5
General Rms ,Wetland Protection R un
section 4. The applicant h read and, nd rst nd the 1 a regulations
1
The applicant maintains th t the project falls within the small,project category below.,
i
A. Open slotted decks,wit out roofs,equal to or less than 300 square rest surface area,incluisive
of stairs and ramps,which are,to be attached,to an existing home,where soilisr tion during
construction,is limited.t ►less than.n.5 ,squire,feet,and wears no permanent sail alterations are
plannedender the footprint, the deck
El 13. In kind replacement of exiistirig decks,regardless size.
�El C.Shedsorother outbuildings of less than 1100 square Feet,which are to be placed onfootings,
not permanent foundations.
� ewt i ti ns s re .ir d t Town N rt�,fin, r.
y
El E. Unpaved pedestrianwalkways for private,use.
El F. Patios less than 300 square feet,not requiring xcavat n or grading.
0 G. Pruning existing vegetation,,planthig of new vegetation and gardening.
lab
E*r'H. Fences and stone walls which do not Ater the flow of surfacewaters nor alter wildlife habitat
r movement.
El 1. Conversion of non-permeable,surfaces to permeable vegetated surfaces.
J,� ther similar r01
e ts,of minimal impact,as determined,by the North And r Conservation
The t li Wetland,Bylaw filing fee of$25 has been included with this p ii .tion.
[9/A written narrative description; scope work of the proposed project and potential impacts to all wetland
resource areas has been included.
R"OThe applicant has identified and,clearly marked,all wetland reso r area boundaries,in the e d.
El Two ( of'a' 1" = 20' scale(or other deemed dappropriate by the Conservation '+ .miiion or
.gent,there drawing showing existing and,proposed.conditions and the delineated w tl rnd resource
areas(see plan requirements below for additional t . .
® A pre- trn+ ti+ n ire- roval meeting was held on site between the applicant and a representative of
the Conservation C mi n. Date of Meeting:
0 The delineated resource area boundaries have,been confirmedby the Conservafion Department as
accurate.
Effective 1 11/016 1
OUT 0 21' 1 J,
r
NORTH AND'O'VER {
CONSERVATION COMMISSION
NARRATIVE DESCRIPTION/SCOPE OF WORK
The site and building'sat the Parson ar i and House and Barri are in the process of being restored t
their natural beauty. Portions of the barn's foundation wall have crumbled nd the tr t ra has been
seriously l `weakened. The plea is to rebuild a uild the,foundation wall under the rear ell portion and stabilize
the building. The existing,field stone retaining.
wall has crur , ld and deteriorated. The plan is to
rebuild throe,stone wall close to the existing location and extend the length shrug the existing slope,to,
stabilize the eroding,sl a .
1,n addition to the stone wall and foundation under the e i tin barn, the plea is to re-chair la thA Parson
Barnard house roof. The existing roof has deteriorated rior to d at ter than it should duan to the shaiding of the
overhanging tree limbs and leaves. Theis applicationlis to request ermis ion to remove few trey
around the, house and barn in order r t complete pl+ t the necessary planned renovations. The site, plan
shows which trees we would like to remove that will interIfere with the planned renovations.
The reconstruction of the retaining ainin wall will begin afterthe siltation fence and hay bales are installed.
The hay bale lire is approximately 67 feet fromthe work l nned. The earth work will be limited to
rnanpower labor on the wetland nd side of the stone wall. Any machine work, (ma,sions,bell or bob cit)will
be from the existing parking and gravel area on the street side the existing Beall.
The re-roofing,trim, and otheir repairs to the Parson Barnard house will requirIe staging within 8 feat of
the Bull exterior. Siltation n and hay bales arae not planned for the reroofing.
The trace removals planned are all wit'hi�n 20 feat of the a se. The tram stumps can rernaln in the
ground.
'The work on the b rn is planned to commence as soon s possible and uri r to November r , 2013. The
roofing at the, Parson Barnard House is planned for November and as weather permits.
The work as described above does not have any potential amt to the wetland resource.
1
Thank,you, l
i
f
i
Joseph D. LaGrasse..AIA
Director r rid Coordinator for the INorth Andover Historical ria l Societ
153 Academy wad
Direct ct Lias 978-807-3719
1 X013
CH
"PLICATION CHECKL
rootLocation.-
171 05cgooP 5Ca-ftf
App lica n t: 5
NA RV5Tv1*1CAL--- '3 • 1577 AC*AV'kKV Phone:118*&S6'+0;
f
General R ements-wetland Protection Re Mations:
oe
Section 4.4-The applicant has read and understands the applicable regulations
`'heplicant maintains that the project falls within the small project category below:
A. Open slotted decks,without roofs,equal to or less than 300 square feet surface area,inclusive
of stairs and ramps,which are to be attached to an existing home,where soil disruption during
construction is limited to less than 50 square feet,and where no permanent soil alterations are
planned under the footprint of the deck
B. in kind g
replacement of existing decks,regardless of size.
C.Sheds or other outbuildings of less than 100 square feet, which are to be placed on footings,
not permanent foundations.
El D. Sever system connections as required by the Town of North Andover.
D E. Unpaved pedestrian walkways for private use.
F. Ratios less than 300 square feet,not requiring excavation or grading.
El G. Pruning of existing vegetation,planting f nes vegetation and garde ng.
ReH. Fences and stone walls which do not alter the flow of surface waters nor alter wildlife habitat
or movement.
El L Conversion of non-p nneable surfaces to permeable vegetated surfaces.
ElOther similar projects of minimal impact,as determined by the North AndoverConservation
Commission.
r The local Wetland Bylaw filing fee has been included with this application.
tion.
VA written narrative description/scope of work of the proposed project and potential impacts to all wetland
resource areas has been included.
The applicant has identified and clearlymarked all wetland resource area boundaries in the field.
f
Two copies of a 1" = ' scale or other as deemed appropriate by the Conservation Commission or
a ent thereof} drawing showing existing and proposed conditions and the delineated wetland resource
g
areas (see plan requirements below for additional detail).
El A re-construction re- royalg was as held on site between the applicant and a representative of
the Conservation Commission. lute of Meeting:
El The delineated resource area boundaries have been confirmed by the Conservation Department as
accurate.
Effective 101 11/06
f:
f
Plan Requiretnents ection 4.4.3
Certified and/or professionally prepared plans are not required. However, the North Andover Conservation
Commission or its designated agent shall have the final authority to detennnine whether the submitted
plans/drawings are adequate and include all pertinent information for review.
At a.minimum,all plans submitted shall clearly and accurately sho r the present conditions and 12roposed t
work and depict the location of all wetland resource areas within 10' of the proposed work. All plants must
be signed and dated by the person who prepared then.
The Commission mayalso require the following information on the proposed plans addition to the }
aforementioned criterianrhere applicable:
}
El Location of any subsurface sewage disposal systems.
El g y
Locations of any drainage structures.
El Locations of any easements mn ludir but not limited to, drainage and utility easements.
El Locations of any open space boundaries if .if the lot is affected by the ` open space boundary as
required ma Manned Residential Development(PRD)).
Location and nature of all proposed alterations to the Buffer Zone Resource Area.
V3Date:
Signature of ppli ant or Applicant's Representative
(TOWN USE ONLY)
COMPLETE APPLI A ON-The application meets the submittal requirements. Therefore,the
Conservation Department has prepared a written list of conditions necessary to protect any adjacent
wetlands for approval by the Conservation Commission.
This condition list shall be filed with the North Andover Conservation Department as NACC
El INCOMPLETE A L I ATION The following sections of the Wetland Protection Bylaw or
Regulations have not been complied with and as a result this Department is rejecting this incoml2lete
application w two business days from the date of receipt (Section 178.4 North Andover Wetland
Protection Bylaw).. ou may pick up this application and supporting plans at the Conservation Office and
re-file with the required supporting documents and mi formation.
El NOTA SMALL PROJECT The North Andover Conservation Commission has determined that the
proposed project as submitted does not meet the small project criteria and hereby denies tete application.
As such,a Request for Determination of Applicability(PDA) or a Notice of Intent(N01) must be filed,
Reason(s)
Signature of Agent: Date:
f
Effective 11 1/06
Residential Propel Record Card
I ARCEL I : 01058.0-0005-0000.0 MAP--058.0 BBLOCK: LOT:0000.0 PARCEL A F SS.1 9 OSGOOD STREET FY:2013
PARCEL INFORMATION Use-Code. 905 Sale `rice: 0 Book, 0742 Road Type. T Inspect Date: 0311712005
Tax Class: E Sale Date: 0/201 Page: 0359 rd Condition: P Meas Date: 0311712005
NORTH VER HISTORICAL SOCIETY Tot Fin Area: 3066 Sale Type: Cert/Doc: Traffic: M Entrance: X
C/O STEVEN FOUNDATION Tot Land Area: 5.83 Sale Valid.- N Water: IRS Collect Id: r
Address, Grantor: Sewer SW Inspect Reas: C
P 0 BOX ill
NORTH ANDOVER MA 01845 1
xem t- % r id- % Cornet- l o Indust- % Open S - `L°
RESIDENCE INFORMATION LANES INFORMATION
Style: Rooms: Main n r� : Attic:
N13H CODE: 6 H CLASS: 6 Z 13
Story Height: 2.00 Bedrooms: 3 Up Fn area: 13" Bsmt Area: 1344 Seg Type Code Method Sq-Ft Acres Influ-YIN Valga Class
Roof: G Foil Baths: I Add Fn Area: Fn Bsmt Area: 1 P 905 S 43560 1.000 208,621 l
Ext WI Half Baths: l Urn,area: Bsmt Grade: 2 R 905 A 0 4.830 36,708
Masonry Trim: Ext Bath Fix: 2 Tot Fin Area: 3066DETACHED STRUCTURE INFORMATION
Foundation: ST Bath Quak T RCNLD- 353185 -- -
Kitch Yr Built- kd j: S r U nit M r- M rB2 S 1176 0-00- YR- 11 G CA Aonti��G d E/ Cost class
16,300 1
Heat Type: ST Ext bitch: Year Built: 1715 Sound Value: 1 1 1 A 11000 1
Fuel Type: Grade: Cost Bldg: 3533200
Fireplace: 4 Bsmt Gar Cap: Condition: A Aft Str Val 1: VALUATION INFORMATION
Central AC: N Bsmt Gar SR Pct Complete: Att S r V 12: Current Total: 615,800 BIS 370,500 Lard: 245,300 Mkt nd: 245,300
Att Gar SF: %God r. 1100/100/79 Prior Total: 577,400 Bldg, 333,800 Lands 243,600 Mi nd: 243,600
SKETCH PHOTO
F1 IML
378 Sq.Ft
42 Picture
FU/FM/6 4M JEMLA I- I
1344 Sq.Ft - va
3
42
Furca/[ .210/058.0-0005-0000.0 as of 10/4113 Page 1 of I
North Andover MWAP 179 Osgood Street, October 4 20,13
i
I
/
ip ,
Jo ,
, I
s
rf
, t
/f I uii ieo:
6„ r
J
yI1
e
I
J>
i
f I
J,
tnt�"r�rotat�n
Interstate
Major Roads Horizontal Datirm:MA Slat plana Coordinate System,Datum NAD83,
Roads Meters Data Sources:The data for this map Was produced by Merrimack
Valley Flanning CommIssilon( p )using data provided by the Town,of [
t. Easements ''�, North Andover.Additional data provided by the Executive Office of
Boundary Enw 4onmantal,fifalirs[ ass l ,The Inf rr alflan depicted on this imap is
a, for pNanning purposes only.It may not be adequate for legal boundary
Pars CRs
definition or regiulatory interpretation.THE,TOM�Op NO TH ANDOVER
MAKE$NO,WARRANTIES,EPRESSE OR IMPLIED,CONCERNING
49 THE RACY,,COMPLETENESS,RELIABILITY,OR SUITABILITY'
OF THESE DATA,THE TOWN OF NORTH ANDOVER DOE$NOT
M s
ASSUME ANY LIABILITY,ASSOCIATED WTH THE USE OR MISUSE p
low THIS INFORMATION
IFIY I'�
69 ft
ro
o S
lwm
b O
5 3 j� +
W-1. G] Cl
FtAYeALE I WILT FM-,E HAY[3ALE J 51LT FkTdGE •.�
n=
CGNF94JCriK^aF�74i - �•_r _
GAP ROC. F°LATITM AS A
MIA WE1GM•315 b�- PEDESTRIWi 13A ER
MEN_ TI I IR-KWHEELESTCJF'i 91 md7' I I € ¢ 0
TOP c w;S2%I ALI.BE 1 - STOP-mTO T I I E 1 I i E 'cr
i -
I rlo}zTAREa O.G,mAX SPAGW3 ♦ f` I I I h I 3 k O
. _
W TOP$011.OR LOBI MRT-ABLE SOIL -- el
98.17' 2' ,, N W ct
OVER THE:15AC.K DIRAIN
EXIBTW,
GAR AR ROGk R4N TREE TO
MAIN
MIhL PAGE BATTER HAGK9 %,«s �' -�iw=.=y:::��s:=`..=%;.•_:.-;i���
1 pARKIAGRAVEYa FGEw 01 `.
r
R Lor
3
TWO STAKE&BALE Hatt pC6T � C+1•:9 TEXTILE
I
I I
3
A I
4WT SRLS �I?�V SOIL - E
E[)FZ.CF FAERC TRAT19.•• @ 100A), EXISTITxi }r7142'.!y °Y.�;:..,�;ami>:^
TO 5E etm;rP N 6 3 3 I I i 1'^ TREE TO
6'DEFT'1RrHC3i 3'-0'iYH ! S A. l`REMAIN
,D2.O4
[ m I R.1
L _ .__ I 1P¢$ I -__.. I II 10$8' 1 j
I �Off t L.......-
I '
EASE F'zOCY, GI1T SLOPE `..x-.. `...FIRE i tree root r
itETLATTJ Y T ly 1 t
6£ M3{UIEiC+I-Ef=6ED ba. � IfM TillLWB=_L$TOP' 1
HQ
YR4NT 1 !
a•g+c FER5IETER aRalrs
11` ___ _lz
utaltv�cfAaRrc E21r; [ �z s' 10.7
6'FNS&]FSTAKE i,;r1 11 ~~.. MT"
ATFG4 GF GaT'd'ACTED 5AId?
oRLH0I$Tl*Z=p EAKIN SITE PR4PoSEfl I
SCALE:VK�"=I'-D' G1
BOULDER RETAINING WALE W Q� PC
n
z
Y
w
Q
U
Q
. H h
rialbr.STUD5 -�
P OT F L A4�SF�ATNNs
_--FLIER FABR'G
i
EXIST rYs \ E7CI5TAYa MOOR EAARDS HATOX-F I SILT FENGE v v 3—tea SALE/
TlW STAKE69OLE ItlG17D SHAKES .a.--c v v�:rw.' e - HAY SILT FENG
•EDGE OF FAERIG TO E8 ExE5FAfG JOI$T$
5EamD I46'>7LFx ! l ---_`
TFfF�Tl SGT EXISTM 6ILL T�ROT 1 s
H,r ....... 01 TERIOR4T30N IFTEGESBAF2r ------ ------ Y ----- —..�.�.-------- o
r W
REPLACE UT"P.T.TMER TO � r � � �~� 0 1
l C — • ,�r�
S MATGF1EX15T�Y DII'MICN5 92.47' — w.
\GCTb1T�1GTIPN� � .
10. 411-t-%-ACE / 41.f 7+ ti`�� 95JGH' V, O
MR I I • ff
U) W
3 f��l l l`tl GRAD'~ - // `--_.�Fq •�� / i ECk� li4 'D Lu
L.L
/
L VIrzT rLoaRExIa XALL. �
6•ri FrussiexE ��c ��li};� Y kAND EXCAVATE i DIID' z o 706
F�TFiAT1GN —tl} ��t✓1� _ FMlEp-ALOR KWTFOIN[MAKE
�AflTi 7 SHED fU"'J.17' - h-_¢�' o LG�.�.
AW FOOTM-BA07-ILL
WALL WITH C&AVTEL POR
HA`(BALE I SILT FENGE —C1
Cc,
'SCALE:f12°=!'-0" - ? FIELD STCxM TO,NOATICN o c
Y i WALL SET PS MORTAR m a
9 Cc4MWTDR MAY UTILIZElmO0' I91A2• 143 ra�..-
v EX161W,fkFLD STCW- TRAN$- 0 -" `' JDLA]2013 Q
_ f'
'...` 10098 r 1Di38' 1 ACTM Ane Tri FmxPEeTY OF
r
VERTICAL WW R ❑ 9ARL
' .r STEEL SET 3'-0'dL. tre_root T �olr+-srhln cF use TV
4 NO
AND PLACED 2'-O'MN I uvrrED 70 nw-T GUrrreo
j=jR I �� U,5 1C A G,,THE OACTO
9+fT0 OTM WOW HTD}ZAZ1T t / OF4 T34E cT:sily Tm.
e_ _ OF T31E MORKSF'.DL• US
'• :a .,•...Y� CONGR FOOTWj TO .. TIT
r T _ o=_crn,AtevE_eo�CMERI.,o cTE
T
TT
- E£A.'Z LT1+rtalSTu q y 2.Ilj... }01 3' Tr 6 U 1[GM ors
I
S -�1�1 OTHCR FF6 Cls Is PRCiGmTEII.
,__[.„„ THE V_E PR RtRFODQ;M i OF
.� LLJhrtSE PLA'S FGR AW OTH{R
b• AFPIICPTOU E 5—TLY
(Nz MUM V4 PER.I
PHi5UO
9-Ell PEPJfaSDU OFJ
SITE EXISTING r,
€ � SCALE:v!B•=I'-m' cI
STONE FOUNDATION WALL k
moi E,�•_,'-®• �!
Revisions
24SEPTW13
see�e AS NOTED
236U
Irl rl,.
�1
CALLS!
NORTH
�IIID
US
I�luuuu ,,III
V VVVVIVV"�
J ,
nr�, /�����/'✓ �� l oY �,!!!/ ,�/�ii� rr, ri,
IIIA/ � ( /r�r �i✓�///% �i /�/,
r /r,' � rr,✓ii c
»
�j
I
v.
I III
err ..2
r,,r
r rrrr,«„rr�o
III
r � r
/
l
/%i / r//i✓/����/� �r r f�� ,� � � III /�� r
I
I
1111111111�1111�1111 I
V
/i
.� u111111111 1
i
r r,
-
(if
�f
rur,
a luuii'I!!I 11p111P�ili„Yli 11111""`II"}
1
" r //,,, ///%/ ' J 1 i✓/i % / l �/' � /r%lel%%;
✓ �,„ /rill/,�.,. r o! ///� :i „/ //r,,;. f �I ! „/
1��'I 1111111'1fi r � k� 1
1/� ���I %/ „�/i r//„i,;,,✓iii//��/��//r�jl % //(r ,j i r f, 1 �
'II I�Ijll))��I liiu 1r
Yr /
I I
1
r ///,,:r �,✓, 1 i, �,� �/ rig„,,,.///� , y-'
/ r �' f, / /i/ �/ ✓a / /rte ///r,,,�
r
r /
-W-T
'
_M
ate:
YIIIIIMMMMMMIMMMMMMMM III /r
OCT 2'01 ,. ANDOVER xI TO CIAc SOCIETY
%i
ob PARbUN BAR'NARDy
HIS 11 CiAL Su"CIETY
Architects-Engivns-Interims-Land Piming
One Elm Square,Andover,NIA 0 18 1
C SITE P'LANT.97847+-3675 F.978474-3670
j
179 OSGO D STREET www.logmssearch;tects.com—E—mail:JIDUA /uOLCOM