Planning Board Meeting APPROVED 7110/01
June 5, 2001
Members Present: Alison Lescarbeau, Chairman
John Simons, Vice Chairman
Alberto Angles, Clerk
Richard Nardella
Richard Rowen
Staff Present: Heidi Griffin, Planning Director
The Planning Board Meeting of June 5, 2001 was called to order at 7:10 p.m.
Discussions:
Stevens Estate Wireless Facility-Development Plan
Richard Nardella, Alison Lescarbeau, Alberto Angles
Steven Anderson is here this evening to have a pre-application informal discussion with
the board. Sprint and AT&T are virtually tied on the bid. They are here tonight to
present a variety of proposals and have a review of what they would like to present.
Mr. Anderson stated they have proposed two different options at the site. Each option is
on the hill, near the mansion, and is pretty well shielded from the mansion itself.
The two proposals are as follows: Because the site is near the airport, height is an
important issue. Under the zoning bylaw and the FAA, height is the key issue to make
sure it's high enough to work.
The first idea would have a sign equipment compound just off the existing telephone
lines. There's a clearing in the woods and will follow that in and have a 40 x 40-fence
compound, one pole in the middle and two sets of equipment on the ground.
Traditionally, Sprint uses an earth-tone cabinet. If the board prefers they could combine
it into one building.
There would be a fence around the outside of the building and they are proposing a 5'
stockade fence and could propose a higher fence if necessary.
1
r f
For the two carriers on the one pole, the antennas would be inside:the pole, without a
flag. To accommodate two carriers, they propose 100'. The trees are already in excess
of 80' tall.
The second alternative would allow them to bring down the height of the pole with more
ground space at the height of the property. Each pole would be 90' tall, with internal
antennas inside the pole. The same driveway would be used coming in, with a y at the
end and separate equipment areas for AT&T and Sprint.
A few issues with this proposal: the second compound is within 300' of the garage of the
Stevens estate property.
Briefly, some of the issues they would like guidance from the board on:
First of all, they are concerned with what the MHC and the FAA would do and they
would like to put both proposals through the zoning process. This is because if the FAA
says they can't have 100' pole, they will have the backup option. They would like to
put both through the process.
Ms. Lescarbeau ask what are the FAA regs relative to these proposals?
Mr. Anderson stated it's only applicable if it's on the glide path on the runway. Their
informal analysis would be 47' or 87' as the maximum height of the pole. Mr.
Anderson stated he thinks that if the airport would give their support of the proposal, it
will benefit them.
Mr. Nardella asked when they would give their proposal?
Mr. Anderson stated they have spoken with the airport consultant, and he is unsure if they
will support them or not.
Mr. Andersen stated if they can build one single pole, then that's what they will do?
Mr. Nardella asked if there would be much excavation for the one pole option?
Mr. Andersen responded there is half as much clearing for option A then for option B (2
poles).
Mr. Nardella asked what the height of equipment is?
Mr. Andersen responded 10' and 5'.
Mr. Nardella stated that the 6' stockade fence would not cover the 10' equipment.
Mr. Nardella stated that on previous occasions, the applicant has provided coverage
areas. Mr. Nardella asked if that analysis would be done?
2
Mr. Andersen responded that higher than 1.00' would be preferable. The foliage of trees
has a tremendous affect on the coverage. They will provide that information at the
public hearing.
Mr. Nardella requested a picture of the tower, and if lights will be flashing?
Mr. Andersen stated that red lights would be on at night.
Mr. Nardella asked if the proposal will require any variances?
Mr. Andersen stated the closest call is on the height, and that there would be no more
variances required.
Mr. Keith Mitchell, chair of telecommunications subcommittee, stated that the
subcommittee is recommending to the Board of Selectmen that option A be pursued, and
option A fails, option B be pursued.
Mr. Mitchell asked that the Planning Board appoint another Planning Board member to
the subcommittee in light of the fact that the alternate planning board member resigned
from the Planning Board and was the liaison to the subcommittee.
Mr. Andersen stated the cables that run from the equipment shelter to the pole, which
would be above ground. Mr. Andersen stated they would be asking for a waiver from
the requirement for identification of the trees on the property.
Mr. Andersen stated the bylaw required a variance if the proposal was 300' to a habitable
building, and that the garage was located within 300' of the proposal. The Board
replied they did not believe a variance was required as the garage was not a"habitable"
building.
Commercial Development—Route 125- informal Discussion
Mr. Steven Webster stated they have located the industrial line.
Mr. Webster stated the first phase would be the 50,000 SF building in the front.
Mr. Webster stated the back buildings would total approximately 145,000 SF. Mr.
Webster stated they have moved the front building back, and separated the automobile
traffic from the truck traffic.
Mr. Webster stated they planned on returning in approximately one month with a formal
submission.
Mr. Nardella asked if their parking complied with the'zoning bylaw?
3
Mr. Webster replied yes.
Mr. Simons asked if the buildings would be a brick facade like the adjacent credit union?
Mr. Webster replied it would be a brick fagade, with glass.
401 Andover Street-Verizon Wireless-Informal Discussion
Ms. Janet Stearns was before the Planning Board tonight representing Verizon. Ms.
Stearns stated she was proposing some roof-mounted antennas on top of the building.
A discussion ensued relative to whether or not the application would require a variance
relative to the setbacks of 600'.
The Planning Board directed Ms. Stearns to meet with the Town Planner and the
Building Commissioner to iron out the issue of the interpretation of the setbacks. The
Planning Board stated they believed that the application would require a variance and that
must be obtained prior to applying for the Planning Board special permit.
Public Hearings:
Red ate Pasture-Definitive Subdivision-Court Remand
Mr. Howard Speicher stated that they are here tonight on a new public hearing stemming
from an old denial. Mr. Speicher stated that the Planning Board denied an earlier
version of the plan in 1998. The developer filed an appeal to the Land Count, and
decided it was more productive to address the board's concerns as expressed in its denial
and by the town engineer than to litigate the case.
Mr. Speicher stated the town and the town's outside consultant, Coler& Colantonio, have
reviewed several revised plans. Mr. Speicher stated that they had a slope stabilization
issue, which has been approved by the DPW and concludes its review by the town and
the plan meets the town's regulations.
Mr. Osgood Jr. stated that the layout of the project has stayed the same, along with the
house locations. Mr. Osgood Jr. stated that most of the work changed was on the
drainage system. Mr. Osgood Jr. stated the drainage system was originally too small,
and DPW had a real aversion to maintaining an underground drainage system.
Mr. Osgood Jr. stated they have redesigned the drainage system so there is an open
infiltration pond, all drainage comes into the pond, and the pond.has an outlet that's
above the water of the pond, which will infiltrate into the ground.
Mr. Osgood Jr. stated it produces a reduction in both volume and rate of runoff for all
storms. Mr. Osgood Jr. stated they've gone with the open pond concept because Jim
Rand preferred the open infiltration pond to the underground system.
4
Mr. Osgood Jr. stated that all other minor changes have been made.
Ms. Lescarbeau asked if it is the same number of lots and length of road?
Mr. Osgood Jr. replied yes.
Ms. Lescarbeau asked if the detention pond is right on Salem Street?
Mr. Osgood Jr. replied it is back off of Salem Street approximately 100' and 20' from the
new roadway.
W. Osgood Jr. stated that if the pond overflows it would go into a weir with a level
spreader.
Mr. Nardella asked where that Iocation of the overflowing would be?
Mr. Osgood Jr. stated it would overflow into the same location it was flows in now.
Mr. Osgood Jr. stated the existing drainage system does back up, and cannot handle a
100-year rainstorm.
Mr. Osgood Jr. stated that the new proposal entails a zero increase in volume.
Mr. Nardella asked how deep is the detention pond?
Mr. Osgood Jr. stated the bottom is 144, and the top of the berm is 148, with the street
level being 146.
Mr. Nardella asked what it would look like from Salem Street?
Mr. Osgood Jr. stated the top of the berm is about 3 1/z feet above Salem Street.
Mr. Nardella stated he does not like the look of detention ponds and the Board has been
encouraging underground detention structures.
Mr. Simons asked if the detention pond could be disguised?
Mr. Osgood Jr. stated that it would be loamed and seeded, and planted with some
plantings around the entryway.
Mr. Speicher stated if there's a concern about the detention pond, the plans could be
revised for landscaping.
Ms. Lescarbeau stated she thinks it's a very difficult site to develop.
5
� G!
Mr. Simons asked why you have to go so far back on the slopes?
Mr. Osgood Jr. stated they're 2:1 slopes, and they're needed to obtain the lot frontage.
Mr. Simon stated that could be a problem.
Mr. Simons stated the board's experience is that everytime they build on a hill there are
problems.
Mr. Simons asked if they could talk a little bit more about the disturbance of the slope.
Mr. Osgood Jr. stated the proposed grade is 174 existing grade is 188.
Mr. Simons asked how many feet of the hill would be taken out?
Mr. Osgood Jr. stated from the road it might be 60 feet to 80 feet.
Mr. Simons asked if that could be pulled back?
Mr. Osgood Jr. stated that because of the lot configuration rules, it causes them to go into
the slopes and disturb them.
Mr. Simons stated he would like the applicant to come back and investigate the
diminishing of the cutting on the slopes.
Mr. Simons asked about the strip of land on Lot 4?
Mr. Osgood Jr. stated the strip of land is not included on the lot area of lot 4 and is
adjacent to the neighboring property. Mr. Osgood Jr. stated the strip is due to the radius
of the roadway alignment.
Mr. Nardella asked how wide it is?
Mr. Osgood Jr. stated 20' and the strip would be part of Lot 4.
Mr. Simons asked if the applicant would consider building the road as a driveway,
instead of a road, how would it make the proposal different and would the applicant
revise their pians?
Mr. Speicher stated that with less roadway, it would be a smaller detention system.
Mr. Rowen stated from what he remembered from the old public hearings, the site was
sensitive relative to the timing of the release of the water in a storm. Mr. Rowen stated
the applicant could not demonstrate to their engineer the timing of the drainage was
correct. Mr. Rowen asked if it was possible to have an adjustment in the field if
necessary if the water overflowed?
6
�l
Mr. Osgood Jr. stated there would be 2.5 feet of water storage in the pond, which is equal.
to the increase of runoff in a 100-year storm. In a smaller storm, the pond will still hold
the volume, with much less runoff. Mr. Osgood stated test pits indicate that the sand is
glacial and water will percolate into the ground.
Mr. Rowen stated that the Mosquito Brook floodplain is subterranean at that point, and
the water will dump almost directly into the brook. Mr. Rowen stated he's unsure if
with the water is draining into the ground will the Ceirs property still have drainage
issues?
Mr. Osgood Jr. stated that the water would go down below the Ceirs property.
Ms. Osgood Jr. stated the slopes would be stabilized as follows. The main problem is
the water bleeding down on top of the slopes. They have proposed drainage swales to
channel any surface water flow away from the slope. All water on the site is routed then
to catch basins and sub-drains to perforated pipe with stones. The detention pond is
designed to handle the groundwater inflow.
Mr. Nardella asked if they would reforest or replant those cuts?
Mr. Jr. stated they will be seeded with a slope mix, and they will eventually reforest if no
one else goes out and cuts those slopes.
Mr. Rowen asked if the soil was sandy on the slopes?
Mr. Jr. replied it was a till soil.
Mr. Rowen stated that all the slopes the board has had problems with in the past were
comprised of a till soil.
Mr. Nardella pointed out that right next door is the Foxwood subdivision, and those
slopes have had serious problems and he would like to make sure this was avoided for
this application.
Mr. Angles echoed Mr. Nardella's concerns and would like to see a more aggressive
slope stabilization plan, as well as the swales.
Mr. Osgood Jr. stated they could rip-rap the whole slope.
Mr. Angles suggested they look at geo-grid or a similar material.
Mr. Osgood Jr. stated these issues could be addressed during the construction phase.
Mr. Nardella stated the applicant is hearing universally from the Planning Board that the
slope stabilization issues be addressed, and be addressed now, not during the construction
phase.
Ms. Lescarbeau agreed, stating that the applicant needs to address the issue during the
design phase, not during the construction phase.
Jim Corbit, Weyland Circle of Foxwood subdivision, stated he abuts the proposal on the
side in the back. Mr. Corbit stated he is concerned about the slope stabilization also, as
it appears the slope failures could end up in his yard.
Mr. Nardella stated the contours in the slopes in the back don't appear to be too different
from the natural contours of the land. In other words, the cutting in the back of the
slopes is more or less keeping with the topography of the land.
Mr. Rowen suggested the applicant revise their plans to a 9% road grade to eliminate any
slope issues at the cul-de-sac area.
Mr. Osgood Jr. replied this would mitigate some cutting.
Mr. Steve Tombarelli, abutter, Salem Street, stated his concern is that there are serious
water problems here and the water is being pushed into one spot. He is concerned his
cellar will get flooded.
Mr, Osgood stated with this type of soil it wouldn't increase the groundwater.
Mr. Nardella explained that is why the outside consultant reviews the plans just to ensure
that all drainage issues are resolved. Mr. Nardella also stated the Planning Board holds
bond monies, which can be seized to correct a problem if a developer does not address
the problem.
Bob Niekel, 871 Salem Street, stated that when Foxwood Subdivision went in, he had
more water in his cellar, and he is very concerned this proposal would add to the water in
his basement.
Mr. Nardella stated the applicant was denied and asked to return when there would be no
more water coming off the site than what exists presently and this has been concluded by
the town's outside consulting engineer.
Mr. Steven Ceir, 895 Salem Street, abutter stated that he does not feel comfortable with
the subdivision. Mr. Ceir stated he was disappointed that the plans still have four
houses.
Mr. Ceir stated that on March 2, 2001 a major rainstorm occurred. Mr. Ceir presented
pictures of the storm and the affect it had on his home. Mr. Ceir stated the water comes
8
�l
from the Redgate Pasture land and presented pictures, which he states demonstrates the
affect of the storm and the water runoff.
Mr. Speicher stated that they would examine the slope stabilization as an issue for the
next meeting.
Mr. Lescarbeau suggested they pursue the geogrid as a solution.
Mr. Nardella motioned to CONTINUE the Public Hearing for Red Gate Pasture-
Definitive Subdivision-Court Remand until June 19, 2001, 2"d by Mr. Simons, voted 5-0
in favor of the motion.
Delucia Way-Definitive Subdivision
Mr. Phil Christiansen stated this is a small parcel of land off Waverly Road. There is an
existing house on Lots 6 and Lots 2. They are proposing a roadway approximately 560'
long, with sidewalk on one side, town sewer and water, and detention ponds on lots 4 and
5.
Mr. Chritiansen stated the Shawsheen River is the rear of the property and the wetlands
have been flagged and approved by the Conservation Commission.
Mr. Christiansen stated Lot 6 was included in the subdivision to obtain 14 feet for the
roadway radius. Mr. Christiansen stated all lots are conforming to the zoning bylaw,
all with proper frontage.
Mr. Christiansen stated they have responded to comments from the consultant. Mr.
Christiansen stated the subdivision regulations require an environmental analysis for six
lots; however, four of the lots are new.
Mr. Simons pointed out that the plan refers to the Lots as Numbered Lots 1 through Lots
6 and depict six lots.
Mr. Rowen asked where the Greene Street property is located?
Mr. Christiansen responded right next door to the proposal. All of the runoff drains to
the back to the Shawsheen River.
Mr. Nardella asked the applicant respond to the Building Commissioner's memorandums.
Mr. Christiansen stated the parking spaces have been depicted on the plans. There are
nineteen parking spaces on Lot 2.
Mr. Simons requested that the apartment building may not be in compliance with zoning
and asked if the use would be conforming to these new plans. Mr. Simons stated this
might create a more non-conforming use.
9
Mr. Simons requested that the Town Planner check with the Building Commissioner
relative to this issue.
Mr. Christiansen stated he could re-orient the house on Lot 1 so that it fronts Waverly
Road instead of the new road.
Mr. Simons motioned to CONTINUE the Public Hearing for Delucia Way-
Definitive Subdivision until June 19, 2001, 2nd by Mr. Nardella, voted 5-0 in favor of the
motion.
1070 Osgood Street-Chao Pra_ya Restaurant
Mr. Neve stated this is a restaurant use. Mr. Neve stated they have received approvals
from the Zoning Board of Appeals and the Conservation Commission. Mr. Neve stated
they received variances to reduce the travel width around the site from 25' to 20', and
they withdrew their request for compact parking spaces.
Mr. Neve stated the entire curb cut was already installed and it is complete, the traffic
light will change.
Mr. Rowen asked if there's a basement for the site?
Mr. Neve replied yes, and it can only be utilized for storage.
Mr. Neve stated that the basement is not an occupiable space.
Mr. Rowen motioned to CLOSE the Public Hearing for 1070 Osgood Street, Site
Plan and instruct the Town Planner to draft a decision for the June 19, 2001 meeting, 2n
by Mr. Simons voted 5-0 in favor of the motion.
Lot F Flagship Drive
Mr. Huntress presented the plans, stating they are proposing a medical office building
JACKI TAKE OUT MY OPENING MEMO STATEMENT AND INCLUDE HERE
Mr. Huntress stated there is an existing retaining wall on the abutter's property.
Mr. Karl Dubay, MHF Design stated the existing conditions are that the drainage flows
onto the adjacent property. The new plan will redirect the drainage onto our own site.
Mr. Dubay stated they are planting additional landscaping behind the wall adjacent to the
residential property.
10
Mr. Huntress stated that the building steps into the grade of the land. Mr. Huntress
stated that the building serves as a retaining wall.
Mr. Dubay stated the back wall is only 6' high.
Mr. Simons asked if the residents of Marion Drive would see the new building?
Mr. Huntress replied in the winter you might see portions of the building through the
trees as they would not be fully blossomed during the winter season.
Mr. Simons asked for a sight line or orientation for visualization purposes of the new
building?
Mr. Dubay stated he would provide a cross-section for the board at the next hearing.
Mr. Nardella questioned the applicant relative to the use of the building and the parking?
Mr. Huntress replied that the applicant would have to justify to the Building
Commissioner that the use met the parking for the building.
Mr. Nardella stated he believes the parking is not ample as of this time.
Mr. Nardella stated that if the applicant wants to change to a medical office, the parking
will also change and they will be required to come back to the Planning Board.
Mr. Simons stated that the abutters are an important issue relative to this project. Mr.
Simons stated the applicant has maximized on the floor area ratio.
Mr. Huntress explained that was based upon a definition from the Building
Commissioner, and that was based upon the utilization of the basement, which the
Commissioner included as floor area ratio.
Ms. Lescarbeau read aloud a letter from the Mottolas, abutters from Marion Drive, who
are concerned about extensive excavation and future groundwater in their basement.
Ms. Mottola stated she was primarily concerned with water and would like to ensure that
there will not be water in their basement.
Ms. Lescarbeau pointed out that the Mottolas homes are higher than the top of the
proposed building and its land.
Mr. Dubay stated the abutters are uphill from the site and that area will be cut slightly.
Mr. Dubay stated they would excavate approximately 130' away. Mr. Dubay stated
they would be providing underdrains.
11
�,G
Ms. Griffin noted that there are approximately 20 catch basins around the site in addition
to the underdrains.
Mr. Ed Condon, 89 Marion Drive, stated that even though he's hearing water does flow
downhill, there are 3 houses on the top of Marion Drive that were dramatically affected
when the previous building on the site were built. Mr. Condon stated that there are
springs up in the area and if the springs are blocked the water backs up.
Mr. Dubay stated the retaining wall in that area also acts as an interceptor.
Ms. Mottola stated she does not feel anything should be built on the lot.
Ms. Marie Amaresco of Stets and Company, LLC presented pictures of when there were
serious erosion problems when the last building was built on this site, Ms.Amaresco
stated that this puddling has caused holes, which have eroded her driveway.
Mr. Nardella asked if the Town Planner could provide the Planning Board with the
previous decision on the site.
Ms. Marie Amaresco requested site lines be presented for the building to her property for
aesthetic purposes.
Mr. Nardella replied this is not necessary as the use is allowed on the site and her site was
allowed to be utilized in the same way.
Ms. Marie Amaresco stated her concern was that her tenants will be viewing the parking
garage of the building. Ms. Amaresco stated that her building will be cast in shadows,
and what could she do about that?
Mr. Rowen re-emphasized Mr. Nardella's comments that the applicant is proposing a
pen-nitted use in the proper zone and have not requested any variances, and as such, their
proposal is in conformance with the Zoning Bylaw. Mr. Rowen stated the only way to
prevent the building from being built in the manner it is proposed to be would be to
purchase the land to protect it from being built upon.
Ms. Amaresco stated that her last comment was in 1997 they came as willing abutters for
the buildout of a one-story building. Ms. Amaresco stated that this didn't work out well
back then.
Ms. Griffin stated that there are letters in the file for Intellisense, the previous proposal,
which indicate the site was brought into compliance and had addressed the erosion
problems, from both the prior Town Planner and the prior Conservation Administrator.
Mr. Nardella stated he made it clear to the applicant that the parking will need to be
addressed if the uses change.
12
G'7
Mr. Nardella motioned to CONTINUE the Public Hearing for Lot F Flagship
Drive-Site Plan Special Permit until June 19, 2001, 2"d by Mr. Simons, voted 5-0 in favor
of the motion.
257 Bridle Path
Mr. Osgood Jr. stated all outstanding issues have been addressed
Mr. Simons motioned to CLOSE the Public Hearing for 257 Bridle Path-
Watershed Special Permit, 2"d by Mr. Rowen, voted 4-0 in favor of the motion.
Mr. Simons motioned to APPROVE the Watershed Special Permit for 257 Bridle
Path, 2"" by Mr. Rowen, voted 4-0 in favor of the motion.
Greene Street/Riverbend Crossing-PDD Special Permit
Mr. LaGrasse stated that all outstanding engineering issues have been addressed and
there is a memorandum from VHB identifying this.
Mark Johnson, attorney for applicant, stated that the way the 55 year and older housing
will work is that an over 55 community does discriminate. The Fair Housing Act allows
for this. In order to comply for this exemption, to discriminate, three requirements must
be met.
1. Housing intended to operate 55 years age of older
2. 80% units be utilized for 55 or older;
3. Community comply with HUD regs for verification of occupancy
The Master Deed would track compliance of these regulations. Under HOPA, people
who are under 55 can use the remaining 20%.
Mr. Johnson stated they are investigating putting in a clause in the Master Deed limiting
the amount of time children can live with the 55-year and older residents.
Mr. Nardella stated previously they had looked at provisions for renters.
Mr. Johnson stated this deed can be prepared in the near future and he can supply the
Planning Board with a sample.
Mr. Nardella's question is whether the definition of"elderly" housing constitutes 55 or
older.
Mr. Rowen did not believe they were in non-compliance with the zoning bylaw.
13
C7�
Ken Kramm, Vanasse and Associates, stated he prepared a traffic study and sent a copy
to VHB. He received a fax back with about six general comments on the study. They
agreed the proposal would not have a significant impact on the proposal. Mr. Kramm
stated he has addressed most of the comments and will send the revised traffic study to
VHB.
Mr. Rowen motioned to CLOSE the Public Hearing for Greene Street/Riverbend
Crossing and instruct the Town Planner to draft a decision for the June 19th Mceting, 2"a
by Mr. Simons, voted 5-0 in favor of the motion.
740 Turnpike Street-Car Wash-Site Plan Special Permit
Mr. Thomas Laudani, representing Lake Realty Trust, owner of the property, stated that
at this point in time in the approval process he has had discussions with various town
departments and he believes all remaining issues have been addressed.
Mr. Laudani stated one issue was the status of the sewer flows and he has had two
meetings with Bill Hmurciak and that DPW is now satisfied with their submittal.
Mr. Laudani stated there was an outstanding issue with the traffic study and that has been
approved.
Mr. Laudani stated there was an issue relative to the issue of the chemicals being used,
and they are all biodegradable and DPW's requirements have been met.
Mr. Laudani provided the Board with some samples of the architectural renderings of the
building.
Mr. Laudani stated that this parcel is zoned Village Commercial, McGregor's parcel is
zoned B2. Directly adjacent to this are three parcels zoned Village Commercial. Mr.
Laudani stated he has the frontage over to Saville Lane. Mr. Laudani has entered into a
purchase and sales agreement with the McGregor parcel so he can rezone his property to
Village Commercial and will also have frontage on Route 114.
Mr. Simons stated he feels uncomfortable that there is 3 parcels contiguous to each other
being developed piece meal.
Mr. Laudani stated the other 3 parcels would be sold to McGregor, so there will only be
the car wash site and the proposal for the McGregors.
Mr. Laudani provided the Board with samples of the shingling and architectural walls of
the building.
14
G�1
Mr. Nardella motioned to CLOSE the Public Hearing for 740 Turnpike Street-
Site Plan Special Permit and instructed the Town Planner to draft a decision for the June
191h meeting, 2nd by Mr. Rowen, voted 5-0 in favor of the motion.
Mr. Nardella requested that a clause be placed in the decision relative to sewer mitigation
fees.
Brooks School
Mr. Rowen motioned to CLOSE the Public Hearing for Brooks School
Headmaster/Admissions-Site Plan Special Permit, 2nd by Mr. Nardella, voted 5-0 in favor
of the motion.
Mr. Rowen motioned to APPROVE the Site Plan Special Permit for Brooks
School Headmaster/Admission with the addition of sewer mitigation fees being added to
the decision if applicable, 2nd by Mr. Nardella, voted 5-0 in favor of the motion.
Bond Establishments/Releases:
Forestview-Palomino Drive
Mr. Rowen motioned to ESTABLISH a Performance Guarantee by Surety
Company for Forest View Subdivision in the amount of$152,400.00, 2nd by Mr.
Nardella, voted 5-0 in favor of the motion.
Forest View-Lot Releases
Mr. Rowen motioned to RELEASE lots from Forest View Estates, 2nd
by Mr. Nardella, voted 5-0 in favor of the motion.
Lot 24B &Lot 23B Rocky Brook
Mr. Rowen motioned to RELEASE all remaining bond money held for lots 23B
&24B Rocky Brook Road, 2nd by Mr. Nardella, voted 5-0 in favor of the motion.
Wallace Street Subdivision Endorsements
Mr, Rowen motioned to ESTABLISH a $5,000 bond for Wallace Street
Subdivision for the completion of the roadway, 2nd by Mr. Nardella, voted 5-0 in favor of
the motion.
15
249 Marbleridge Road-Bond Release
Mr. Rowen motioned to RELEASE all remaining bond money from 249
Marbleridge Road, 2"d by Mr. Nardella, voted 5-0 in favor of the motion.
Mr. Rowen motioned to APPOINT Mr. Nardella to the Financial Task Force, 2nd
by Mr. Simons, voted 5-0 in favor of the motion.
Mr. Rowen motioned to APPOINT Ms. Lescarbeau as the Telecommunications
Subcommittee Liaison, 2"d by Mr. Nardella, voted 5-0 in favor of the motion.
The Planning Board endorsed the Covenant and Conveyance of Easements and
Utilities for Wallace Street Subdivision.
The Planning Board endorsed the Form J Lot Release for Wallace Street
Subdivision to be held until the $5,000 bond is posted.
Decisions:
Fronta eg Exception-Lot 1 Bradford Street
Mr. Rowen motioned to APPROVE the Frontage Exception for Lot 1 Bradford
Street, 2"d by Mr. Nardella, voted 5-0 in favor of the motion.
Frontage Exception-Lot 2 Bradford Street
Mr. Rowen motioned to APPROVE the Frontage Exception for Lot 2 Bradford
Street, 2"d by Mr. Nardella, voted 5-0 in favor of the motion,
ANR Plan-Bradford Street Map 62 Lot 138
The ANR Plan divides the lot into 5 lots with Lots 1 &2 requiring a Frontage Exception
Special Permit.
Mr. Nardella motioned to APPROVE the ANR Plan for Bradford Street Map 62
Lot 138, 2"d by Mr. Rowen, voted 5-0 in favor of the motion.
Board Reorganization
Mr. Rowen motioned to ELECT Mr. Simons as the Chairman of the Planning
Board, 2nd by Mr. Angles, voted 5-0 in favor of the motion.
16
7l
Mr. Rowen motioned to ELECT Mr. Angles as the Vice Chairman of the
Planning Board, 2'd by Mr. Nardella, voted 5-0 in favor of the motion.
Mr. Rowen motioned to ELECT Mr. Nardella as the Clerk of the Planning Board,
2"d by Mr. Simons, voted 5-0 in favor of.
Mr. Rowen motioned to ADJOURN the Planning Board meeting of June 5, 2001,
2"`'by Mr. Nardella, voted 5-0 in favor of the motion.