22
23 Chair called the meeting to order at approximately 7:09 pm and explained the procedure
24 to the assembly; stated that he would open the meeting by announcing the following
25 postponements:
26
27 Post onements:
28
29 Jack Hashem, Lisa Lane—Map 98A, Parcel 75, - Two-lot subdivision.
30
31 Juniper Woods Realty, LLC, Juniper Woods, Map 108A, Parcel 2, 8-lot, single-Family
32 Definitive Subdivision, &Planned Residential Development.
33
34 Joe Levis, 1003 Osgood Street, Map 35, Lot 50, Modification to an approved Site
35 Plan Review Special Permit. Lincoln stated that possibly the use for the property
36 located at 1003 Osgood Street will change because Hearthstone Realty and Joe Levis are
37 discussing some other possibilities for its use.
38
39 Old Business:
40
41 Mixed use development for Chapter 40R overlay district: Chair stated that he attended
42 the BOS meeting last week, subcommittee formed w/BOS, and Chair is on committee as
43 well as ZBA Chair and Lincoln and Curt Bellavance. PB to provide criteria regarding
44 mixed use, want to meet off site to go over the dimensional requirements for mixcd-use
45 development. Chair knows of document over lay use regarding mixed use, Lincoln to get
Planning Board
October 17,2006 Minutes
Page [
I copies to distribute to PB before next PB meeting. Once language is finalized for over
2 lay use, document/draft will be submitted to State. Chair wants to create this zone and
3 Town and developer will have a mutually beneficial development to gain additional
4 revenues for the Town. Lincoln stated letter was sent to State for comments for 40B,
5 nothing has been sent back confirming the developer to go ahead with a 40B yet. Watch
6 the percentage required for affordable housing.
7
8
9 Discussion:
10
11 Janet A. Dellea, 255 Marbleridge Road,bond release. Watershed Special Permit,
12 $2,000.00 bond filed, submitted as-built and letter form Engineer, Ben Osgood Jr. dated
13 1015106 stating plan has been done in accordance w/Watershed SP. Motion by Alberto
14 Angles, 2nd by Richard Rowen, to release $2,000.00 + accrued interest, vote was
15 unanimous 4-0.
16
17
18 Discussion:
19
20 Charlie Carroll,Autumn Chase subdivision lot release. Charlie Carroll, developer,
21 requested lot release total of 6 lots, lots 6 thru 11 for Molly Town Road. These lots
22 requested because roadway is done to access them. Chair wants to make sure applicant
23 understands that the required drainage issue was to be done prior to release of bond,
24 stabilize detention pond remains to be done within the week. Tony from Christianson&
25 Sergi was present tonight, construct up to Lot 11 then construct detention pond, so all
26 utilities up to lot 11 have been done. Submitted interim as built to the Town to show that
27 as far as constraints were done. DPW is ok w/estimate and that the street is essentially
28 complete. Lincoln to inquire about patching of Summer Street roadway. Chair feels that
29 Summer St. is not acceptable at this time; Tony stated patching is not finished yet; a final
30 coat will be done soon. Chair wants to ensure that streets are up to snuff, once
31 utility/telephone company comes in and tears up a hole doesn't DPW come back in and
32 repair the roadway to town specifications? PB should retain bond money if developer
33 doesn't repair the road correctly the first time around Hold an extra $25K. Lincoln to
34 check about posting additional bond money for this purpose to earmark money
35 specifically because the roads are getting progressively worse. Jack Sullivan stated there
36 should have been a separate bond posted for sewer&utility installation work for this
37 subdivision, and then retain 10 to 15 % of bond money until they go for street acceptance.
38 Bond amount is $91 K. Motion by Alberto Angles to release lots 6 thru 11 and establish
39 bond in amount of$91K, 2nd by Richard Rowen vote was unanimous 4-0. Lincoln to
40 have DPW look into additional bonding for additional outside work.
41
42
43 Continued Public Hearin;
44
45 Seng Ea, 63 Turnpike St., Special Permit- Mr. Seng Ea, owner. .
Planning Board
October 17,2006 Minutes
Page 2
I Jack Sullivan, Engineer, stated that he provided storm water mitigation for this project.
2 He stated that although CVS did not have a good perk test that Mr Ea's perk test is
3 suitable for infiltration,and he designed recharge units to mitigate a 100-year storm. He
4 submitted report critical to keep drainage functioning properly. Water will flow to
5 Westerly side of property to catch basins, so water will stay on site and not drain onto
6 abutter's property. Placed evergreen plantings on Westerly sideline and existing stockade
7 fence. Plant grass over infiltration system; show snow storage area between parking edge
8 and Westerly boundary. Section 8 general conditions look at letter B (per Jack Sullivan).
9 Lincoln will get something from DPW confirming that the drainage system will work.
10 Motion by Alberto Angles to close public hearing 2"d by Richard Rowen ,vote was
11 unanimous. Motion by Alberto Angles to approve Site Plan SP as amended this evening,
12 2"dby Richard Rowen, vote was unanimous 4-0.
13
14
15
16 Public HearinE:
17
18 Bonny Realty Trust/Amy Constantino, Trustee, 12 Bonny Lane, Watershed Special
19 Permit to construct residential dwelling(John Simons is now present at 7:50 pm). Lot
20 was approved in 1979, lot sold to Bonny Realty Trust, grand fathered lot preceding the
21 1987 zoning change to 2 acre Zoning. Minimum lot was 1 acre, at that time. Town
22 Counsel will check the progression of the deeding of the lot to verify that the Iot is
23 entitled to grandfathering. Atty. Donald Borenstein stated that this lot was on record in
24 separate ownership prior to 1994, so the is obligated to comply with the pre 1994
25 Watershed District setback/dimensional requirements. Sewer is installed on Bonny
26 Lane. First proposed alternative has advantages that 2"d alternative doesn't have. First
27 alternative house much closer to road (change location of house and length of driveway
28 needs to do grading within 100 foot of non-disturbance zone). 2"d alternative design
29 requires an engineer to speak for the plan. VHB hasn't submitted their review yet.
30 Retaining wail shown on plan doesn't touch this wall under preferred plan. Shed and
31 brick walk located on site plan, there appears to be improvements from the neighboring
32 property. The property line must have been misunderstood. Con/Com has not done an
33 accepted line of delineation for the wetlands yet. Lincoln to check bylaw what
34 constitutes a request for a variance or Special Permit under the old bylaw 1987— 1994
35 vintage. Lose 1700 s.f. of pavement on preferred plan. PB wants Con/Com to locate
36 extent of wetland relative to preferred plan vs non-preferred plan. PB to do drive by to
37 view the site. PB took a poll and has a tendency to go with the preferred plan. Continue
38 this until November 21, 2006 PB meeting.
39
40
41 Time is 9:00pm
42
43
44 Discussion:
45
Planning Board
October 17,2005 Minutes
Page 3
7
I Handout to create sub-zone for 40R overlay district. Dimensional requirements for
2 setbacks within each district were discussed by the PB. Look into more possibilities for
3 mixed zone, send dimensional requirements to the PB via e-mail, and send examples of
4 what other communities have done.
5
6 Minutes:
7
8 Motion to approve the Minutes for September 5, 2006.
9 Motion by Richard Rowen to approve Sept. 5,'2006 Minutes, 2nd by Jennifer Borax-
10 Kusek, vote was unanimous 5-0
11
12 Motion to approve the Minutes for October 3, 2006.
13 Make edits, on page 2 line 26 take out extra word would; on page 3 line 30-rewrite
14 portion. Motion by Richard Rowen to approve Oct. 3, 2006 Minutes, 2nd by Alberto
15 Angles, vote unanimous 5-0.
16
17
18 Meeting for the PB to be scheduled for next Tuesday evening at 6pm. Lincoln to get a
19 place for the meeting and post it on the bulletin board.
20
21
22 Discussion:
23
24 Jack Hashem, Lisa Lane subdivision 2 lot subdivision- Statue of limitations is up on this
25 subdivision application, although applicant submitted a signed waiver of time constraints.
26 Jack Hashem will need to make his intension known prior to the next PB meeting, he
27 may be asked to withdraw without prejudice by the PB, mention was made of waiving the
28 application fees
29
30
31 Motion to adjourn tonight's meeting by John Simons, 2nd by Alberto Angles, meeting
32 adjourned at approximately 9.15 pm.
33
34
35
36 By order of the Planning Board
37
38
39
40
41 Approved
42
43
44
Planning Board
October 17,2006 Minutes
Page 4