Loading...
HomeMy WebLinkAboutPlanning Board Meeting Minutes 10.05.10 PLANNING BOARD Meeting Minutes Tuesday, October 5, 2010 Town Hall, 120 Main Street Top floor conference room 7:00 PM 1 2 Present at Meeting: J. Simons, T. Seibert,M. Colantoni,R. Rowen, C. LaVolpicelo,R. Glover 3 The meeting began at 7:03 PM. 4 POSTPONEMENT: 5 Public Hearing: 1679 Osgood Street. Definitive Subdivision for 8 single—family residential lots within 6 the R-3 District, submitted by GMZ Realty. 7 J. Simons would like to formally accept the letter for extension submitted. 8 MOTION 9 Motion was made by R. Rowen to accept the request for an extension until Dec. 25, 2010 for rendering a 10 decision for 1679 Osgood Street. The motion was seconded by T. Seibert. The vote was unanimous. 11 12 PUBLIC HEARINGS 13 CONTINUED PUBLIC HEARING: 351 WILLOW STREET. Applicant(Bake N'Joy)is seeking a 14 Site Plan Review Special Permit in order to expand the existing parking lot. 15 Jam: No open issues from last meeting. No additional issues have come in. 16 MOTION 17 A motion was made by R. Rowen to close the Public Hearing for 351 Willow Street. The motion was 18 seconded by T. Seibert. The vote was unanimous. 19 DECISION 20 A draft decision was reviewed. The number of additional spaces added to the parking lot was verified as 21 forty five(45)additional spaces. Twenty four(24)of which were due to restriping the lot and twenty one 22 (21)were added spaces. J. Simon asked for strengthening the language requiring the marking of the 23 existing trees that will remain in the landscaped area prior to the pre-construction meeting. 24 MOTION 25 A motion was made by T. Seibert the decision for the Site Plan Special Permit as amended. The motion 26 was seconded by R. Rowen. The vote was unanimous. 27 28 CONTINUED PUBLIC HEARING: 1003 Osgoo Street. Applicant is seeking a Site Plan Review 29 Special Permit and Watershed Special Permit for construction of a new 21,000 sq. ft. 30 restaurant/office/retail building and relocation of an historic barn. 31 Judy: First Public Hearing was July 20, 2010 where the applicant provided an overview of the proposed 32 development. We will need to work through stormwater issues. I spoke with L. Eggleston today a few 33 times and passed on her first response to John Sznolak and Chris Tyinula. Her second response did not 34 come in until 5:00 today. The best way to approach this would be to have a meeting with all parties to 35 discuss L.Eggleston's concerns about stormwater management. Also,the Building Inspector did make a 36 determination that a variance would not be required even though the Barn is to be relocated within the 37 Non-Disturb Zone and the Bylaw calls for new buildings to have a variance from the ZBA and a Special 38 Permit. Also a portion of the proposed 21,000 sq.ft.building is in the Non-Disturb Zone to the wetlands 39 on the side. The Building Inspector again made a determination that it would not need Zoning approval 40 and that that was consistent with prior applications. The Planning Board found no reason to disagree with 41 the Building Inspector's findings. In general the Board is the Special Permit granting authority and has 42 the authority to decide whether over all this is an appropriate site for this development. Oct 5 2010 meeting minutes DRAFT 1 43 J. Simons: Stated a few years ago the Planning Board did a project on the adjacent site(Treadwell's)that 44 was subject to a Special Permit. His position and,he believes the Board's position is that they take their 45 responsibility extremely seriously on properties that are directly abutting the lake. It was a thorough and 46 rigorous review so that there would not be any adverse impact to the lake. He feels the same about this 47 project. This parking lot,building, and barn are in such a location that the applicant has to demonstrate 48 that there will not be any adverse impact in the lake and not just marginally but beyond a shadow of a 49 doubt using best practices. Stated the Board will not leave anything to chance and is going to push very 50 hard on this and that is why he welcome having L. Eggleston as part of this process. 51 John Smolak, attorney for the applicant was present along with Chris Tymula,MBF Design Consultants 52 (project engineer),John Grasso, principle applicant, and Dermott Kelly,traffic engineer. Atty Smolak 53 stated that the lot for the proposed development was created prior to 1994 and there were different zones 54 that apply to this project as opposed to projects on lots that were created after 1994. As for the barn itself 55 he met with the Building Inspector who did make a determination that the relocation of the barn is 56 considered a replacement of a structure under the Zoning Bylaw and is comfortable with that. It is 57 applicant's job to prove to the Board that they meet the standards of the Bylaw. 58 R. Rowen: Is it your position that because the lot pre-dated 1994 that you don't have to comply with the 59 current Watershed Protection District requirements? 60 J. Smolak: No,there is a provision in the Bylaw with respect to the barn that provides that Planning 61 Board by Special Permit can permit the replacement of a structure within the Non-Disturbance Zone and 62 that is what the Building Inspector has made a determination on with respect to the barn. 63 R. Rowen: So you are complying with the current Bylaw even though the lot has pre-dated the Bylaw? 64 J. Smolak: It complies with the current zones that are in effect for those lots that were created pre-1994. 65 They generally are the same standards but with different setbacks and one less zone. 66 Chris Tymula, Civil Engineer on behalf of John Grasso,reviewed the major changes to the plan since the 67 initial submission. First change is in design,reducing the building footprint approximately 600 sq. ft. X68 This change reduces the number of required parking spaces by two. Some handicap spaces have been 69 moved from the back of building to the barn area. A `right in only' has been added to the plan. Also, 70 some of the existing foundation of the barn will be used as a freestanding, decorative retaining wall and 71 there will be landscaping around it. Grading and drainage plan is still same general feel. Stormwater 72 standards are much more stringent than they were a few years ago and we meet those standards thus the 73 system design is actually superior than the adjacent site. Emergency response notes have been added to 74 the plan. Regarding L. Eggleston's comments---there are some technical issues we will need to discuss 75 with L.Eggleston. Some may be a difference of opinion and there are some notes L. Eggleston wants 76 added to the plan and some changes regarding the O&M Plan. 77 Jam: L. Eggleston has some strong opinions about the way calculations are being done for the 78 infiltration system and wants to make sure the stormwater is being treated properly, including dissolved 79 chemicals (salts,nitrogen). This project is in the Zone A,which is another standard that needs to be met. 80 C. Tymula regarding landscaping we have eliminated any tall trees in the front of due to site distance 81 requirements and will need a couple waivers from zoning for perimeter landscaping. Will need a special 82 permit from ZBA for a freestanding sign similar to the adjacent site. Added to the plan is a small pump 83 station for the barn. There will be an emergency back up generator for it. 84 C. LaVolpicelo would like to know more about the discussion with the Building Inspector regarding not 85 needing a variance for the movement of the building. 86 J. Smolak: We had a discussion in terms of the barn itself and a key idea was on the ability to save the 87 barn somehow. After discussing the issue with Building Inspector,Gerry Brown regarding the building 88 itself and the Non-Disturb Zone and there is a provision in the Non-Disturbance Zone requirements that 89 allows you replacement of a permanent structure. Mr.Brown's opinion is that we are keeping the same 90 structure and just placing it in a different place and that is how he came about with his determination. I 91 would be happy to have further discussion with him and revisit the issue just to reaffirm. 92 T. Seibert: What is the difference if be were to rule the other way? Oct 5 2010 meeting minutes DRAFT 2 93 J. Simons: If he ruled in a different direction they would need to get a variance. Planning Board has a 94 reasonable amount of discretion in these matters. My perspective and I am an advocate of preserving the 95 barn,but if the barn is going to go in that location we would need to be absolutely,positively sure that it 96 is not going to be a problem. 97 R.Rowen: Are there other places on the site where it would be appropriate to put the barn. 98 J. Smolak: We have looked at a number of different alternatives to preserving that barn but it is very 99 difficult to find the right place for it. Another possibility would be to eliminate the barn all together. 100 J. Smolak will discuss the issue with the Building Inspector again to make sure to confirm his decision. 101 T. Seibert requested that L. Eggleston provides a best case,what is being proposed, and worst case 102 scenarios for all keys items (chemicals, sewer, stormwater runoff, any other disaster scenarios)being 103 presented in a table format. 104 R.Rowen: need to determine if the riskiest part of the whole program if the barn goes in there during 105 construction or after it is installed and operational. If it is during construction and there is a great deal of 106 margin you can put in a plan to mediate the risk during construction. If the bigger problem is the 107 operation of the building and there is very little margin for error then I would say to take a totally 108 different approach to it. 109 J, udv: There are standards for both. She is looking at the entire site. She is looking at the drainage the 110 reports that the client provides for the entire site. I think she does have some major issues but I don't get 1'11 the sense that she thinks they are insurmountable issues or that there are any particular issues related to 112 the barn itself but rather overall issues with mitigation of the stormwater and chemicals. It has been a 113 quick back and forth. 114 R. Rowen: In extraordinary storms that we have had in the past how has the adjacent site performed? If 115 this is going to perform at a higher standard than the adjacent and that one has held up well then I would 116 feel a lot more comfortable going forward with this. 117 T. Seibert: pointed out that the topography for this project is different than the adjacent site. 18 J. Simons asked to get feedback from the DPW to see if they know of any flooding issues at this site in 119 the last few years. 120 R. Glover asked about the how the notes on the plan, if approved, enforced. 121 J. Simons: We have a clause in our Watershed Special Permit and we should consider keeping a bond for 122 monitoring for a period of time. 123 C.C. Tymon: lin the Operation Maintenance documentation there is language that reports are to be 124 submitted to the Conservation Commission and Planning can be added. The report is done by the 125 maintenance company periodically and they can be submitted to the town for whatever period is decided. 126 J. Simon: the follow up meeting with L.Eggleston should address a number of issues. Asked Judy to 127 keep the Board posted between meetings on that. 128 T. Seibert: Asked Judy to get a list of the disaster scenarios that she worries about and the best practices, 129 Peter Devlin: owns a condo at 1009 Osgood Street(Treadwell's building). Concerned that he is losing 130 parking spaces at his dental office. There is a photographer and empty site adjacent to him that will also 131 be affected by the reduction in parking spaces. There is a garbage area on the proposed plan that would 132 eliminate 4 of the current spaces. 133 J. Simons: The spaces are the total spaces for the property not dedicated spaces. The decision is based on 134 total size of the property. 135 P. Devlin: Could the garbage area be relocated in some way? 136 C. Tymula: The 4 spaces are being relocated. There is not a reduction in the net number of spaces. They 137 have been relocated approximately 20 feet away. 138 139 The applicant will try to be ready to present at the next meeting, Oct. 19,2010 and if not they will file a 140 continuance to Nov. 16, 2010. 141 .142 DISCUSSION: 195 Bridle Patin. Oct 5 2010 meeting minutes DRAFT 3 43 Judy: We issued a Special Permit 3/2/2010 at this location for Bob Ercolini for construction of 2-story 144 addition,new deck, and brick patio. I have reed a landscape plan that shows what looks like a larger 145 deck. There is no scale or measurement on the plan. The question is does this constitute a field change or 146 will there be a requirement for modification to the Watershed Special Permit. 147 Bob Ercolini: 195 Bridle Path,halfway through the construction have decided to put a patio in as 148 opposed to the deck that was originally designed. The landscape plan is with an engineering company to 149 determine the water runoff. It is an impervious surface on the patio and wants to create the appropriate 150 drain with the appropriate system and come back in two weeks with those things. Would like to get any 151 Planning Board comments to the proposal and hopefully not have to open up a new Special Permit. There 152 is no change to the footprint of the building. Has met with Conservation and they asked for a generator 153 that was located in the 50' area to be relocated outside that area and that is done. 154 R. Rowen: How does the size of the patio compare to the size of the deck previously approved? 155 B. Ercolini: The patio has been expanded outside the 100' area from the wetland. Originally proposed 156 deck was 600 sq ft. and the patio would be 900 sq ft.but the expanded part is all outside the 100' distance 157 from the wetland requirement. 158 159 Board agreed that B. Ercolini should continue with what he proposed and should come back in two weeks 160 for review. 161 162 DISCUSSION: 163 J. Smolak: There is an opportunity now that there will be a Special Town Meeting Nov. 17,2010 for and 164 existing parcel off Rt. 114,property owned by Al McGregor, located between the car wash and Turnpike 165 Commercial Real Estate building. There is interest with a bank that would require drive up and there is a 166 possibility for a drive up restaurant,potentially fast food. 167 J. Simon.: I don't mind listening to a proposal but I don't like getting the rush for a Special Town 168 Meeting because we won't have time to vet it properly. 169 J. Smolak: Understood. The site has some challenges but thinks that it is the best site for this particular 170 area because it is isolated from neighbors. There is a concept site plan prepared in 2003 but it is under old 171 zoning. Would like to discuss the issue at the next Board meeting. 172 J. Simon: I don't mind a discussion but there is not much time and this is something we have looked at 173 for a long time and we have gone out of our way to try to engage Mr.McGregor in the process and to 174 come at the last minute and throw something in front of us is not a good start. 175 J. Smolak: We have something that we think will work out there and understands that there is a short 176 period of time but we are doing our best to show what we are trying to do. 177 178 Remainder of Board agreed to listen to proposal at next meeting. 179 MOTION 180 A motion was made by M. Colantoni to approve the meeting minutes from September 21, 2010,as 181 amended. The motion was seconded by R. Glover. The vote was unanimous. 182 DISCUSSION: 183 Judy: We have stormwater regulations to approve. A copy has been sent to everyone and we have to 184 have a Public Meeting on this. Will be scheduled for December. Asked L.Eggleston to come to that 185 meeting. Also,will ask her to look at other areas in the Bylaw that have strornwater regulations such as 186 site plan review, watershed,and subdivision regulations to make them consistent. 187 MOTION 188 A motion was made by to adjourn the meeting by R. Rowen. The motion was seconded by M. Colantoni. 189 The motion was unanimous. 190 191 The meeting adjourned at 8:35 PM. Oct 5 2010 meeting minutes DRAFT 4