HomeMy WebLinkAbout1977-09-07 Conservation Commission Minutes CONSERVATION COMMISSION MEETING
SEPTEMBER 7, 1977
Present were:
H. Fink
P. Trombly, Chairperson W. Mitton
A. Reska
V. Turano was absent
Wetlands Determination - Turnpike St.
Request ll. No
for determination, Robert Dunn Boston Skisorthat the
objections. Consultant repCeasrt e and Desist Orderwas issued 100'
impact should be minimal.
from brook.
Public Hearing
Mr. Fink did not participate as a member of the Commission.
Mr Dunn plans on taking the fill on the hills edea d it ttothe
parking lot having it slope to a North/Nott avel and clay.
rear of the land, to the buffer zone. Fill said 'will
was sways able to
The buffer zone will be left.
park cars on this land before Mr. Fink made a bog."
Mrs. Trombly questioned the redirection
ofsthe
e ssurfaceat Rte11.4.off on
the hillside and whether the grade ill be
Mr Dunn replied he was hopeful this ale bhodld go intoThe gBoston
across the street will be so that the drainage
Hill Brook. There will be no additional entrances.
The plans are very sketchy and there is aane d of
fF reference
inks deed shows
Mr. Faoint
deed show boundry lines one place,
the boundry lines at a different place.
belti aed by ester. d�that all
grades be put on plans and they are to gn
Mr. Joseph DeAngelo, from the State said "he sees no problem in-
volving the highway".
Mr. Fink questioned the velocity and quantity of water, which had
increased and is going into the catch basin.
Mr. DeAngelo said "the pipe was designed to handle any storm and
water for that areaconsultt and
T'.
The Commission has hired I.E.P. an
independent
will then issue the con-
should have a letter by the next meeting. Theythis meetin .
-will
Any letters from parties involvedMwr�lMitton. The Comm ssion g
Motion was made by Mr. Reska and second by
will walk both sides of the street before the next meeting.
Page 2
Hollow Free Lane: r
Lot 15 had a problem with the septic system. It was suggested
the Commission go and look at the area in question. An official
report will be requested from the Board of Health.
Review of thislwednesday Sept. 14,intent
Public Hearing on
14,
on 1977 8:30 P.M.
Notice of Intent did. not give enough information - No calculations
on storage or future storage. Set of plans were forwarded to New
England Power for information on this parcel of land.
Motion to adjourn 9:45