HomeMy WebLinkAboutMiscellaneous - 122 FOSTER STREET 9/20/2017 TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WORKS
384 OSGOOD STREET
NORTH ANDOVER, MASSACHUSETTS 01845-2909
JIM STANFORD
DIRECTOR
John J B&gqi,15E l 7Wephone,(978) 685-0950
Director of bigineering
Fca-(978) 688-9573
TOM'010"OAnd-ovor,
Main;
'
N:6ft h AM:d o"
- �J_, ! .
e.ri:MA 01-845
1'. Foster S- proef— Proposed Wireless
Sfor _W0t,r/8-if&Plan Review
D6ar Rabbddoj
requested, I;Uve:reviewed'the an Limited
proposed -#Aty 6,2 .1 d m
plan: etd,�jfe
d
.,.fpr-Fn f rH,'y otogykeaport ted July
facility fiQ fie.j Opated at.12-2, Foster Street as.' �e &e'd b�--,P�bTer.-t
P P _tj Design broup, UG anal
Jfni f0d4h.be
haft e,, t
offer the following: oolments.--
1. The ordp.08�e&sitb an set dated July 5,20- 17 does not dopiti fihe ptapbsed,.stor M. Mitor
Fest Mah%effient:graotices (BMP,$) [dentified-io the: 11 M- Ihid S'1brMW.af0Fr hyd"rolo y report
:9
The-.site plan set.: f
$hall be updated t0 ref the proposedstorm.Wqfer diasign..
I The summary tqble '76tal Runoff Pe8k From the Site to Of s'ite Northwest bbs'qh Point
2/20 indicates a decrease ire the post development peak runoff r4fe but also indicates an
iffc,riaale in the post development peak runoff V.04,umq f6r the fo., 2 5.00 100- 'yea r
7stQrrn
events. The-.App',fi'cant1 shall discuss in the narrative tris.
increase [n pqsfi dovolopmont
Peak runoff vojoMp and any potential downstream. t
m JMPPP.s.
Page 2
09/20/17
13.Per the Massachusetts Stormwater Handbook., a drawdown device shall be provided for
the in'f iltra:ti O' h- basin fbf thaihteftance purposes;
14,8hoet A-2 identifies areas:afptibPosed 3.1 and 2e1 sfabifized slopes.. Further detaO shall
be lflcf�dod as to h-Qw these areas are proposed to be stabilized.
ohn,J'.. bcift �'gesi P.-JE".;
J
Town; Enqind6r
-TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WOkl(S
'194 0qC,00r).0,TRF_RT MnRT14 ANDC)VFR. MASSA C.141 I-"