HomeMy WebLinkAboutMiscellaneous - 33 BEAVER BROOK ROAD Massacahusetts Department of Environmental Pmtectiion
` Bureau of Resource Protection-Wetlands 7. 242-912 `
WPA Form - cert ficate + f com trance .
Massachusetts Wetlands Protection Act M...G.L. 13r,.§40 and North' Andover Wetland
Protection=B` law..
' Project Information
1. This Certificate of Compliance is issued by: 3. The project site is located at
NORTH ANDOVER NORTH ANDOVER
CoraavationCommrssion aty?owrt
33 Beaverbrook Read Lot
,r x�
Adder
... ..- To SMAdd ,
Al Couillard T
_ Name AgesmMapffSt _. P*=ft0t1
1204 Broadway and the final Order of Conditions was recorded on
. ._ Mailing Address .
Haverhill, MA 01832
October 7, 1998
cryaow 00
at the Registry of Deeds for
State ZrpCode Essex 4372 337
2. This Certificate of Compliance is issued for work regulated CMV Book Page
by a final Order of Conditions issued to:
carobata(em*eredlaro
DECM, Inc.
Name
May 22, 19 9 8 4. A site inspection was made in the presence of the applicant,
or the applicant's agent.on:
Dared
242-912 /9116!ff
iXEPi Tile mniber Date
• Certification
❑ Invalid Order of Conditions:-It is hereby certified that
(Check all that apply): the work regulated by the above-referenced Order of
Conditions never commenced. The Order of Conditions has
Complete Certification:It is hereby certified that the lapsed and is therefore no longer valid. No future work
work regulated by the above-referenced Order of Condi- subject to regulation under the Wetlands Protection Act may-.
tions has been satisfactorily completed. commence without filing a new Notice of Intent and
receiving a.new Order of Conditions.
❑ Partial Certification: It is hereby certified that only the
following portions of the work regulated by the above I>,�'Otrgaing Conditions:The following,conditions of the
referenced Order of Conditions have been satisfactorily Order shall continue:(include any conditions contained in
completed.The project areas or work subject to this partial the Final Order,such as maintenance or monitoring,that
certification which have been completed and are released should:continue fora longer period.)
from this Order include:_
Conditions/Numbers:
� N VV 61,g
n—I -F =
r '
Massachusetts Department of Environmental Protection w -
Bureau"of Resource Protection-Wetlands`` °� ''` 242-912
F0 rm 8 - Cei ' cate. of Compliance
Massachusetts Wetlands Protection Act M.G.L. 231, §4Q and North Andover Wetland
t Protection Bylaw.
13 Authorization
On this
Issued by:
NORTH ANDOVER day of December 4�
COMM*"commrBssron uorrh
December_ 15, 1999-
1999
DareoflssrM yer
_. -- before me personally appeared
This Certification must be signed by a majority of the
- conservation commission and a copy sent to the applicant A-.her--t: P Manzi, Jr.
and appropriate DEP Regional Office(see.Appendix A). - -
to me known to be the person described in and who executed
Signature(s) the foregoing instrument and acknowledged that he/she
I
-— executed the same as hislherfree act-and deed.
4 f Nowputfic
December 11. 2003
Myc=dssonexpees
Recording Confirmation _
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry_df Deeds_orthe Land Court
for the district in which the land is located.
Detach on dotted line and submit to.the Conservation Commission.
To: If recorded land,the instrument number which identifies this
transaction is
cone wanco=swn - -
Please be advised that the Certificate of Compliance for the
project at limmm ftmber
If registered land,the document number which identifies this
transaction is
Hojerr tocariar
Me Number Dower Number
has been recorded at the Registry of Deeds,`of
signature ofAppliuf
County
and has been noted in the chain of title of the affected property
on
Date
Book
rX16 CMR 10.99Y6 J
: off" rzi,
a' ' Form 5
`l DEP Re too. ( 242-912
..�... (to be tawM rsby UEry
- Commonwealth C�ry,iown North Andover
of Massachusetts DECMInc.
! G i
Aoohcanrit
'
Order of Conditions
- Massachusetts Wetlands Protection Act
O.L. C. 13.1 , §40
and under the Town of North Andover's Bylaw Chapter . 178
From NORTH ANDOVER CONSERVATION COtIHISSIUN
To DECM, Inc. Same
(Name of Applicant) ((dame of property owner)
660 Rogers Street
Address Lowell, MA 01852 Address
This Crder is issued and delivered as follows:
❑ by hand delivery to applicant or representative on (dale)
by certified mail. return receipt requested on 1' P I ANIdate)
his project is located at Lot 21A, Beaver Brook Road
The property is recorded at the Registry of NnrrhP rr, -"-q
Book 4372 Page 337
Certificate (if registered)
The Notice of Intent for this project was filed on May 22 1998 (dale)
The public hearing was closed on 1 1r�� ►AIJ (date)
Findings
The North Andover Conservation Commission has reviewed file above-r elerPriced tJotice of
Intent and plans and has held a public hearing on the protect. eased on the information available to the
NACC at this time. the _�1AC has deternmied th tt
the area on which the prccosed work is to be done is significant to the Icllowing interests in occarOanCe v.ith
the Presumptions of Significa ce s.�(fo in the repufalrons !or each Area`Subject to Protec!rorr Under tine
1T8 Recreation
Act (check as appropriate): Ch. 178: Prevention of Erosion & Sedimentation Ch. 178`X, Wildlife
L� Pubiic water supply ( Flood control ❑ Land containing shellfish
Private water supply Storm damage prevention Fisheries
CS Ground water supply l 7 Prevention of pollution ( Protection of wildlife habital'
Total Fiiinc Fee Submitted $55.00 State Share $15'.0_0
City/Town Share $40.00 in nr.ccss of S2�i
Total Relund Due S CilyFrown Portion S State Porrion S
('iz total) (1/7 total)
DEP FILE #242 - 912
Therefore, the North Andover Conservation Commission (hereafter the
"NACC") hereby finds that the following conditions are necessary,in
accordance with the Performance Standards set forth in the State Regulations,
the local ByLaw and Regulations, to protect those interests noted above. The
NACC orders that all work shall be performed in accordance with said
conditions and with the Notice of Intent referenced below. To the extent that
the following conditions modify or differ from the plans,specifications or
other proposals submitted with the Notice of Intent,the conditions shall
control.
GENERAL CONDITIONS
1. Failure to comply with all conditions stated herein,and with all related
statutes and other regulatory measures, shall be deemed cause to revoke or
modify this Order.
2. This Order does not grant any property rights or any exclusive privileges;it
does not authorize any injury to private property or invasion of property
rights. However,the NACC, agent of the NACC or the Department of
Environmental Protection (DEP) reserves the right to enter and inspect the
property at all reasonable times until a Certificate of Compliance is issued,
to evaluate compliance with this Order of Conditions,the Act(310 CMR
10.00),the North Andover Wetland ByLaw and Regulations, and may require
any information, measurements,photographs,observations, and/or
materials, or may require the submittal of any data or information deemed
necessary by the NACC,for that evaluation. Further,work shall be halted on
the site if the NACC, agent or DEP determines that any of the work is not in
compliance with this Order of Conditions. Work shall not resume until the
NACC is satisfied that the work will comply and has so notified the applicant
in writing.
3. This Order does not relieve the permittee or any other person of the necessity
of complying with all other applicable federal, state or local statutes,
ordinances, by-laws or regulations.
4. The work authorized hereunder shall be completed within three years from
the date of this order.
5. This Order may be extended by the issuing authority for one or more periods
of up to one year each upon application to the issuing authority at least thirty
days (30) prior to the expiration date of the Order (Refer to Section VIII (p.15)
of the North Andover Wetland Regulations).
C:\Winword\OOC\242-912.doc l NACC 7112198
DEP FILE #242 - 912
6. The NACC reserves the right to amend this Order of Conditions after a
legally advertised public hearing if plans or circumstances are changed or if
new conditions or information so warrant.
7Wh re the Department of Environmental Protection on �DEP i
requested to
make a determination and to issue a Superseding Order, the Conservation
Commission shall be a party to all agency proceedings and hearings before
the Department.
8. The conditions of this decision shall apply to,and be binding upon, the
applicant, owner,its employees and all successors and assigns in interest or
control. These obligations shall be expressed in covenants in all deeds to
succeeding owners of portions of the property.
9. The term "Applicant" as used in this Order of Conditions shall refer to the
owner, any successor in interest or successor in control of the property
referenced in the Notice of Intent,supporting documents and this Order of
Conditions. The NACC shall be notified in writing within 30 days of all
transfers of title of any portion of property that takes place prior to the
issuance of a Certificate of Compliance.
10. The proposed work includes: Construction of a single family dwelling*011ht
the Buffer Zone of a Bordering Vegetated Wetland and the Outer Riparian Zone of t1W
Riverfront Area.
CAWinword\00C\242-912.doc 2 NACC 7/12/98
DEP FILE#242 - 912
11. The work shall conform to the following (except as noted in the remainder of
this document where revisions may be required):
Notice of Intent filed by: DECM Essex,Inc.
DATED 5-22-98
Plans prepared by: Christiansen&Sergi,Inc.
Entitled"Septic System Design Lot 21a"
DATED REV 6-4-98
12. The following wetland resource areas are affected by the proposed work:
Buffer Zone to Bordering Vegetated Wetland (BVW) and the Outer
Riparian Zone of the Riverfront Area associated with Boston Brook. These
resource areas are significant to the interests of the Act and Town ByLaw as
noted above. These resource areas are also significant to the recreational and
wildlife interests of the ByLaw. The applicant has not attempted to overcome
the presumption of significance of these resource areas to the identified
interests.
13. The NACC agrees with the applicant's delineation of the wetland resource
areas on the site as shown on the plans dated referenced herein. Prior to the
issuance of a Certificate of Compliance,the applicant will submit a plan
showing the site's wetland delineation at a scale identical to the Town
wetland map for this location.
14. The NACC finds that the intensive use of the upland areas and buffer zone
proposed on this site will cause further alteration of the wetland resource
areas. In order to prevent any alteration of wetland resource areas a'twenty
five foot (251 No-Disturbance Zone and a fifty foot(5q No-Construction
Zone shall be established from the edge of the adjacent wetland resource
area. The Conservation Administrator and/or other agents of the NACC do
not have the authority to waive these setbacks as established under the local
bylaw. No disturbance of existing grade,soils or vegetation is permitted in
the No-Disturbance zone. (See Appendix 5 of the local Regulations).
15. There shall be no increase in the post development discharges from the storm
drainage system or any other changes in post development conditions that
alter the post development watershed boundaries as currently depicted in the
Notice of Intent and approved by this Order of Conditions,unless
specifically approved in writing by the Commission.
16. This document shall be included in all construction contracts,subcontracts,
and specifications dealing with the work proposed and shall supersede any
conflicting contract requirements. The applicant shall assure that all
C:\Winword\OOC\242-912.doc 3 NACC 7/12/98
DEP FILE #242 - 912
contractors, subcontractors, and other personnel performing the permitting
work are fully aware of the permits terms and conditions. Thereafter,the
contractor will be held jointly liable for any violation of this Order resulting
from failure to comply with its conditions.
17. The owners of the project and their successors in title,in the event they
proceed to alter areas subject to the Commission`s jurisdiction under the
order, agree that the Order does not in itself impose upon the Town any
responsibility to maintain the proposed drainage system and that said Town
shall not be liable for any damage in the event of failure. By acceptance of
this Order, the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on
this property pursuant to the Order. Issuance of these Conditions does not in
any way imply or certify that the site or downstream areas will not be subject
to flooding, storm damage or any other form of water damage. Maintenance
of the drainage system,if accepted by the Town as part of a public way,
becomes the responsibility of the Town.
18. Issuance of these Conditions does not in any way imply or certify that the site
or downstream areas will not be subject to flooding, storm damage or any
other form of water damage.
PRIOR TO CONSTRUCTION
19.No work shall be undertaken until all administrative appeal periods from
this Order have elapsed or,if such an appeal has been filed,until all
proceedings before the Department or Court have been completed.
20. This Order shall be recorded by the applicant at the Registry of Deeds
immediately after the expiration of all appeal periods. No work shall be
undertaken until the Final Order has been recorded in the Registry of Deeds
or the Land Court for the district in which the land is located,within the
chain of title of the affected property. In the case of recorded land,the Final
Order shall also be noted in the Registry's Grantor Index under the name of
the owner of the land upon which the proposed work is to be done. In the
case of registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is
to be done. The recording information shall be submitted to the North
Andover Conservation Commission on the form at the end of this Order
.prior to commencement of the work. Any Order not recorded by the
applicant before work commences may be recorded by the NACC at the
applicant's expense.
CAWinword\00C\242-912.doc 4 NACC 7112198
DEP FILE#242 - 912
21. A sign shall be displayed at the site not less than two square feet or more
than three square feet in size bearing the words"Massachusetts Department
of Environmental Protection,File Number 242-912."
22. Any changes in the submitted plans caused by the applicant, another Board's
decision or resulting from this Order of Conditions must be submitted to the
NACC for approval prior to implementation. If the NACC finds said
changes to be significant,the NACC will call for another public hearing(at
the expense of the applicant). Within 21 days of the close of said public
hearing the NACC will issue an amended or new Order of Conditions.Any
errors found in the plans or information submitted by the applicant shall be
considered as changes. The proposed project may be still under review by
other local or state boards or agencies. This may result in changes to the
project plans or wetland impacts. If any such changes occur a revised plan
and an explanation of the revisions shall be submitted to the NACC for
review and approval prior to the start of construction. No work shall begin
on a project until written approval has been granted by the NACC.
23. It is the responsibility of the applicant,owner,and/or successor(s) to ensure
that all conditions of this Order of Conditions are complied with. The project
engineer and contractors are to be provided with a copy of this Order of
Conditions and referenced documents before commencement of
construction.
24. Prior to any work on-site the applicant shall submit to the NACC for
approval a sequencing plan for construction and erosion and sedimentation
control with supporting plans and details as appropriate. Prior to any work
commencing on-site, the applicant shall submit to the NACC for approval, a
detailed sequence of construction,including the construction of
compensation and retention areas, and revegetation to be completed before
other work begins on-site.
25. Wetland flagging shall be checked prior to start of construction and shall be
re-established where missing so that erosion control measures can be
properly placed and wetland impacts can be monitored. The proposed limit
of work shall be shall be clearly marked with stakes or flags and shall be
confirmed by the NACC. Such markers shall be checked and replaced as
necessary and shall be maintained until all construction is complete.
Workers should be informed that no use of machinery, storage of machinery
or materials, stockpiling of soil,or construction activity is to occur beyond
this line at any time. All flags used for the above purposes shall be of a color
different from other flagging used on the site.
C.\Winword\OOC\242-912.doc 5 NACC 7/12/98
DEP FILE #242 - 912
26. A row of staked hay bales backed by trenched siltation fence shall be
placed between all construction areas and wetlands. The erosion control
barrier will be properly installed and placed as shown on the plans approved
and referenced herein and shall be inspected and approved by the NACC
prior to the start of construction and shall remain intact until all disturbed
areas have been permanently stabilized to prevent erosion. All erosion
prevention and sedimentation protection measures found necessary during
construction shall be implemented at the direction of the NACC. The NACC
reserves the right to impose additional conditions on portions of this project
to mitigate any impacts which could result from site erosion,or any
noticeable degradation of surface water quality discharging from the site.
For example,installation of erosion control measures may be required in
areas not shown on the plan(s)referenced in this Order of Conditions.
Should such installation be required by the NACC, they shall be installed
within 48 hours of the Commission's request.
27. The applicant shall have on hand at the start of any soil disturbance,removal
or stockpiling, a minimum of twenty(20)hay bales and sufficient stakes for
staking these bales (or an equivalent amount of silt fence). Said bales shall be
used only for the control of emergency erosion problems and shall not be
used for the normal control of erosion.
28. A check payable to the Town of North Andover shall be provided in the
amount of$3,000 which shall be in all respects satisfactory to Town Counsel,
Town Treasurer,and the NACC,and shall be posted with the North Andover
Town Treasurer through the NACC before commencement of work. Said
deposit of money shall be conditioned on the completion of all conditions
hereof, shall be signed by a party or parties satisfactory to the NACC,and
Town Counsel, and shall be released after completion of the project,
provided that provisions, satisfactory to the NACC,have been made for
performance of any conditions which are of continuing nature. The applicant
may propose a monetary release schedule keyed to completion of specific
portions of the project for the NACCs review and approval. This condition
is issued under the authority of the local ByLaw.
29. The applicant shall be responsible for placing a sign on the parcel
designating the applicable lot number as depicted on the plans approved and
referenced herein:
30. The applicant and/or the legal owner of that portion of land upon which
these Orders of Conditions have been placed shall provide to the NACC
prior to transferring,or assigning any portion of said land to another party,
subject to said Orders of Conditions,the"Affidavit'attached via
"Appendix A" signed under the pains and penalties of perjury,stating
CAWinword\00C\242-912.doc 6 NACC 7112/98
DEP FILE #242 - 912
that said applicant and/or owner has read these Orders of Conditions and
is in compliance with each and every condition. This document shall be
provided to the Conservation Department at least five(5) business days
prior to the closing of said land transaction.
31. Prior to construction,the applicant shall submit a revised plan depicting the
approved wetland delineation only and not the superseded delineation. This
will prevent confusion during and after construction activities.
32. Once these above mentioned pre-construction requirements are complete,
the applicant shall contact the Conservation Office prior to site preparation
or construction and shall arrange an on-site conference with an NACC
representative,the contractor,the engineer,wetland scientist and the
applicant to ensure that all of the Conditions of this Order are understood.
This Order shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any
conflicting contract requirements. The applicant shall assure that all
contractors, subcontractors and other personnel performing the permitted
work are fully aware of the permit's terms and conditions. Thereafter,the
contractor will be held jointly liable for any violation of this Order of
Conditions resulting from failure to comply with its conditions. The
applicant or contractor shall notify the NACC in writing of the identity of the
on-site construction supervisor hired to coordinate construction and to ensure
compliance with this Order. A reasonable period of time shall be provided
as notice of the pre-construction meeting(e.g. 72 hours).
33. The NACC shall be notified in writing of any lot line or number changes
with a copy of a plan showing these changes prior to any work on these lots.
DURING CONSTRUCTION
34. IMPORTANT: Immediately upon completion of the dwelling foundation,
and prior to further construction activities associated with the site,the
applicant shall complete a plan prepared by a Registered Professional Land
Surveyor (R.P.L.S) which accuratelydepicts the foundation location and it's
proximity to wetland resource areas as approved under this Order of
Conditions. Said plan shall be submitted to the Conservation Administrator
for approval.
35. Upon beginning work,the applicant shall submit written progress reports
every month detailing what work has been done in or near resource areas,
and what work is anticipated to be done over the next period. This will
update the construction sequence.
CAWinwordk000242-912.doc 7 NACC 7/12/98
DEP FILE #242 - 912
36. Any fill used in connection with this project shall be clean fill, containing no
trash, refuse, rubbish or debris, including but not limited to lumber,bricks,
plaster, wire,lath, paper,cardboard,pipe,tires, ashes,refrigerators,motor
vehicles or parts on any of the foregoing.
37. No exposed area shall remain unfinished for more than thirty (30) days,
unless approved by the NACC.
38. No regrading in the buffer zone shall have a slope steeper than 2:1
(horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide
permanent stabilization.
39. There shall be no stockpiling of soil or other,materials within twenty-five (25)
feet of any resource area.
40. Washings from concrete trucks,or surplus concrete, shall not be directed to,
any drainage system,or wetland resource area.
41. All waste generated by, or associated with,the construction activity shall be
contained within the construction area, and away from any wetland resource
area. There shall be no burying of spent construction materials or disposal of
waste on the site by any other means. The applicant shall maintain
dumpsters (or other suitable means) at the site for the storage and removal of
such spent construction materials off-site. However,no trash dumpsters
will be allowed within 50'of areas subject to protection under the Act or
local ByLaw.
42. Accepted engineering and construction standards and procedures shall be
followed in the completion of the project.
43. During and after work on this project,there'shall be no discharge or spillage
of fuel, or other pollutants into any wetland resource area. If there is a spill
or discharge of any pollutant during any phase of construction the NACC
shall be notified by the applicant within one (1) business day. No
construction vehicles are to be stored within 100 feet of wetland resource
areas, and no vehicle refueling,equipment lubrication,or maintenance is to
be done within 100 feet of a resource area.
C:\Winword\OOC\242-912.doc 8 NACC 7/12/98
DEP FILE #242 - 912
AFTER CONSTRUCTION - 7=
44. No underground storage of fuel oils shall be allowed on any lot within one-
hundred (100) feet of any wetland resource area. This condition shall survive
this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland protection
ByLaw.
45. Fertilizers utilized for landscaping and lawn care shall be slow release,low-
nitrogen types (< 5%), and shall not be used within 25 feet of a resource area.
Pesticides and herbicides shall not be used within 100 feet of a wetland
resource area. This condition is issued under the authority of the Town's
Wetland Protection ByLaw and shall remain in perpetuity.
46. Upon completion of construction and grading,all disturbed areas located
outside resource areas shall be stabilized permanently against erosion. This
shall be done either by loaming and seeding according to SCS standards. If
the latter course is chosen,stabilization will be considered complete once
vegetative cover has been achieved.
47. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of
Compliance:
a. A letter from the applicant requesting a Certificate of Compliance.
b. The name and address of the current landowner.
c. Signed statements from the individual property owners shall be
submitted with the request for a Certificate of Compliance indicating
that they have read and understood the Order of Conditions prior to
purchasing their property.
d. The name and address of the individual/trust or corporation to whom
the compliance is to be granted.
e. The street address and assessor's map/parcel number for the project.
f. The DEP file number.
g. A written statement from a Registered Professional Civil Engineer and
Registered Professional Land Surveyor of the Commonwealth
certifying that the work has been conducted as shown on the plan(s)
and documents referenced above,and as conditioned by the
Commission.
h. An "As-Built" plan prepared and signed and stamped by a Registered
Professional Civil Engineer and Registered Professional Land
Surveyor of the Commonwealth,for the public record. This plan will
include:
C:\Winword\000242-912.doe 9 NACC 7/12/98
n,
DEP FILE #242 - 912
➢ "As-Built' post-development elevations of all drainage
stormwater management structures constructed within 100 feet
of any wetland resource area.
➢ "As-Built'' post-development elevations and grades of all filled
or altered wetland resource areas including the encompassing
buffer zone which is regulated as a wetland under the local
wetland bylaw.
➢ Distances from structures to wetland resource areas. Structures
include (but are not limited to) septic systems, additions,fences,
sheds, stone walls,pools,retaining walls,and approved decks.
➢ A line showing the limit of work and the extent of existing
erosion control devices. "Work includes anv disturbance of
soils or vegetation.
➢ Location of all subsurface utilities entering the property.
48. The following special conditions shall survive the issuance of a Certificate
of Compliance (COC)for this project
➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall
be established from the edge of adjacent wetland resource areas
except in those locations approved under DEP#242-912.
Future work within 100' of existing wetland resource areas will
require a separate filing with the NACC (refer to Section XI
(page 18) of the Regulations for performance standards within
these zones)The Conservation Administrator and/or other
agents of the NACC do not have the authority to waive these
setbacks as established under the local ByLaw;
➢ Discharge or spillage of pollutants (Condition#43);
➢ Prohibition of underground fuels (Condition#44);
➢ Limitations on the use of fertilizers,herbicides, and pesticides
(Conditions #45).
C:\Winword\OOC\242-912.doc 10 NACC 7112/98
DEP FILE #242 - 912
Appendix "A"
AFFIDAVIT
I, on oath do
(authorized agent applicant and/or current owner)
hereby depose and state:
(PLEASE CHECKAT LEAST ONE BL OCR)
1. I am the of
(position with applicant) (applicant name or compagy name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission.
2. 1 am the of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP Pile#) and every condition which has been set forth
in said Order of Conditions.
4. I hereby affirm and acknowledge that on this day of ` 199_
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance.
(DEP File#)
5. 1 hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP isle#)
Signed under the pains and penalties of perjury this day of 19_.
(S4waawe-authorized agent of applicant or owner)
CAWinword\00C\242-912.doc 11 NACC 7/12/98
242-912
i
r
_� 2 SiCl e J ' i C(t('f CI ii? ^Scf ctiiCit�.C("7^ISSiC('.
^a :2C` ;(1 cf1C 'NhC 2X@C::(?Gt ;�2 !C(?7CIf'tCs :fS;;L' ,2R( aCt aC`.<t'C'•�(�Cy?C c( ,�? _:SC:a°'.
'-2 mac( .5 ',:Si ile. ?-ee =.C: arc ceed.
_J ^r t�iy Ot^Ci55iC^ _X :(=S
--^.9 a!:C:IC31':. .:1a wRBf,�a��'/C3 r^^•n agyrl9v"a']:y;fits Crc Br, any pwRaf�t land a=Uctirtg a':e(arc ^C;: -n,C�:,te C.CC`_:Sa< crx IS'C=3
Ccne.Cr any tan restG2A 9 C!:^B C:r/Cr:CwR'.n writC"1 soc tat Q:S LOCateC. are ner3oy nCafieG t lair r.^y...:a rr aS::71 ^ arr nt t
O
=nom rcr.rar.cal c:z=':qn :q issue a Sucersacing Crcer. :•cvtC:cg Me reC esc a mac �y cea.neC,-ad cr^ar.0 cett�ery c re ar.,
'A'- s S
- urtn ten=ays`cn s to r s ^cam t,.s
wttr.(^a a G'cct'a(a 'iiing!-"3 anC;Qy -rar sc;^,31=om aS Crcwcz�in CtC C:dr w
tQ.0�` �.
�ater-tnaucn.^ =y�. .R3 4eGuest:^alf 3(;ra Sane une:s sant"y_s^itieC.-ati cr tanC C91tv9N: .R8 C .^•sarrat C.:C (^n^ISafCR
T= CC a paG- C,,^._S QaC'_S_: l:^.G?L =:`l� _OG+T 3:ra Comc
'_..0
=us: be f
-- - rRON L' 8!CI5 Y OF D7—JS � 3G 5U-B44 TO G = S=OW=`(�
�..L�t' R CORUCD AT .T tiOR� �_ =ST2'C G
T�-1.:. _ _� ORDER 0-r CGi1i,1Ti0�5 t,�T_-.S 3 C•� "-
LE��'S . z� * �ti �O>nC CJrt e*�I�e� ('arm r:crtcC_mmtnCOm-nta; -arz.
�at]c"an Cc,.eC{iRa anc suC,^i:tc !"e 1 �� �a�:'` S. Y�z �iO .._ i1dC) L d �}1 R(. ....
7.
�..�
................_._.._..,...._... ^�"'I3 _OP. COiT1^1�S S_OR J 'SS�.rG L�tnC..::v
_ liC� COve= C^ -
e r -r, ::tCRS(Cr the CrC1aC:3
- r r^ r^I C
o ns
�C' 2- -"
=I_ se _a - - 912 - vt 0eads aS2''• �i, - -' - - :nc
-as teen reccrced a(.:na Nts.^r
'ciec n :ne =^air:Ct 'ine-t :.le affec:_e crCC_r^!.n]CC�fCJnC9..:ta�dr'?r11 C:;tCn �
7-Is
..^•z :r;T.:nar: nur'Cer wntC^tean_::as -