Loading...
HomeMy WebLinkAboutMiscellaneous - 35 AVERY PARK DRIVE310 CMR 10.99 Form 5 .11016 • •• ...on • • Commonwealth - • of MassacnusettS —4411: Kw, ,• • • • From To RECEIVED DANIEL •!....CPC3 NORTH ,,,,NDOMFR• •• OCT 9 12 oo Pt4 .92 /) ic* 4-4,)aey OPIRWomm 242-619 CAy.rown Aimmant TDJ Deve-Inpmp..t-Corp. Lot 27 Donna Drive Order of Conditions Massachusetts Wetlands Protection Act G.L. C. 131, §40 and under the Town of North Andover's Wetlands Bylaw, Chapter 178 NORTH ANDOVER CONSFRVATTM CfMMIccITYM TDJ Development Corn - Address cama fro Do =mow try OEM North Andover (Name of Applicant) (Name of property owner) 40 Lowell Road Salem, N.H. D3079 Address This Oroer is issued and delivered as follows: 0 by hand delivery to applicant or representative on (date) 06 by certified mail, return receipt requested on /6/0 (date) This project is located at Lot 27 Donna Drive The property is recorded at the Registry of Deeds, North Essex Book 1350 Page 6 7 Certificate (if registered) The Notice of Intent for this project was filed on August La. I 9.99 (date) The public hearing was closed on Seotember 16. j. 99 9 (date) Findings NACC The has reviewed me above -referenced Notice of Intent anc plans anc nas neic a puolic nearing on the =piaci. Based on the information availapie to the NACC at this time. tris NA re has tieterrnmed that me area on wrocn the proposed work is to be cone is significant to the following interests in accoroance with the Presumptions of Significance set forth in me regulations for each Area Subject to Protection Unoer tne Act (check as azipropnatel: rvi•1 7 ••••• ••• • R •-• al Prevention of erosion and sedimentation Public water supply A:i Flood control 0 Land containing shellfish Private water supply IV Storm carnage prevention ,;11 Fisheries Ground water supply M Wildlife Prevention of pollution tr Protection of wildlife habitat $ChStaig Ine Recr eation Total Filing Fee Submitted • 230. ft0 hare Ti 5 City/Town Share %137.50 (1/2 fee in excess of S2S) Total Refund Due S - City/Town Portion S State Portion S (1/2 total) (V2 total) Efteve iitiO/E9 5-1 #242-619 Lot 27 Donna Drive Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. This Order does not grant any property rights or any exclusive privileges it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order. 5. This order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Where the Department of Environmental Protection is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 7. The proposed work includes hypothetical homesite and appurtenant site work does not include subdivision replication work. 8. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): (a) Notice of Intent filed by TDJ Development Corp. (b) Plans prepared by Andover Consultants Inc. plans revised 9/16/92. 9. The following wetland resource areas are affected by the proposed work: buffer zone and bordering vegetated wetland. These resource areas are significant to the interests of the Act #242-619 Lot 27 Donna Drive and Town Bylaw as noted above. These resource areas are also significant to the recreational and wildlife interests of the Bylaw. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 10. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as shown on the plans dated 8/12/92. 11. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding or storm damage. 12. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. 13. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site in connection with the construction of a hypothetical house, an over -sized driveway will cause further alteration of the wetland resource areas. The applicant has failed to persuade the NACC that such dimensions are necessary or that here will be no such alteration of resource areas. In order to prevent any alteration of wetland resource areas beyond those proposed in the Notice of Intent and approved herein, a twenty-five (25) foot no -disturbance zone and a fifty (50) foot no -construction zone shall be established from the edge of the adjacent wetlands. No disturbance of existing grade, soils or vegetation is permitted in the no -disturbance zone. (See Appendix 5 of the local Regulations). It should be noted that applicant's plans do not indicate compliance with the 25' no -disturbance zone. New plans indicating conformance shall be submitted prior to commencement of any work on this site. 14. This Order of Conditions is issued in addition to those issued under File No. 242-564. PRIOR TO CONSTRUCTION 15. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 16. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the #242-619 Lot 27 Donna Drive Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. 17. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, File Number 242-619". 18. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC. 19. The applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on -site conference with an NACC representative, the contractor and the applicant to ensure that all of the Conditions of this Order are understood. This Order also shall be made a part of the contractor's written contract. The applicant or contractor shall notify the NACC in writing of the identity of the on -site construction supervisor hired to coordinate construction and to ensure compliance with this Order, 20. The applicant shall submit a construction schedule/sequence to the NACC detailing the proposed sequence of work on site to complete this project. 21. Wetland flagging shall be checked prior to start of construction and shall be re-established where missing so that erosion control measures can be properly placed and wetland impacts can be monitored. 22. A row of staked hay bales backed by a siltation fence shall be placed between all construction areas and wetlands. The #242-619 Lot 27 Donna Drive 5 erosion control barrier will be properly installed and placed as shown on plan and shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. 23. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of twenty-five (25) hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems, and shall not be used for the normal control of erosion. 24. A proper bond or a deposit of money running to the Town of North Andover shall be provided in the amount of $3,000.00 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer before commencement of work. Said bond or deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provision, satisfactory to the NACC, has been made for performance of any conditions which are of continuing nature. The applicant may propose a bond release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local Bylaw. DURING CONSTRUCTION 25. Upon beginning work, the applicant shall submit written progress reports every one (1) month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 26. Any fill used in connection with this project shall be clean fill, containing no trash, refuse rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 27. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC 28. No regrading in the buffer zone shall have a slope steeper than 2:1 (horizontal:vertical). Slopes of steeper grade shall be rip -rapped to provide permanent stabilization. #242-619 Lot 27 Donna Drive 29. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. 30. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system or wetland resource area. 31. All waste generated by, or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off -site. 32. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 33. Members of the NACC or its agent shall have the right to enter upon and inspect the premises to evaluate and/or effect compliance with this Order of Conditions. The NACC reserves the right to require, following field inspection, additional information or resource protection measures. 34. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant as soon as practical. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 35. No underground storage of fuel oils shall be allowed on any lot within one -hundred (100) feet of any wetland resource area. This Condition shall survive this Order of Conditions, and shall run with the title of the property: This condition is issued under the authority of the Town's Wetland Protection ByLaw. 36. Fertilizers utilized for landscaping and lawn care shall be organic and low -nitrogen content, and shall be used in moderation. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition is issued under the authority of the Town's Wetland Protection ByLaw. 37. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by sodding or by loaming and seeding according to SCS standards. If the latter course is chosen, stabilization will be considered #242-619 Lot 27 Donna Drive complete once vegetative cover has been achieved. 38. Upon completion of the project, the applicant shall submit a letter to the NACC from a Registered Professional Civil Engineer certifying compliance with this Order of Conditions and the approved plans referenced herein (or approved revisions). A stamped "As -Built" topographic plan of all areas within the jurisdiction of the Wetlands Protection Act and Bylaw shall be submitted when a Certificate of Compliance is requested. This plan will include: a. Distances from structures to wetlands. b. A line showing the limit of work. "Work" includes any disturbance of soils or vegetation. 39. The following special conditions shall survive the issuance of a Certificate of Compliance for this project: 34. Discharge or spillage of pollutants. 35. Prohibition of storage of fuels underground. 36. Limitations on the use of fertilizers, herbicides and pesticides. Issued By Signature's) North Andover Conservation rnmintotit Conservation Commission This Order must be signed by a majority of the Conservation Commission. On this - -17day of - Octeher't 19 9.2- • before me personally appeared RiC/09/et) A ly Lt./ Areb . to me known to be the persen described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. )411 9, /991 Notary Pubic 079iue-7- L. . 0117)A.1 My commission expires The =mum me ownv. any person aggneved by tnis Oroer. any owner of land abutttng the land upon which the proposed work is to be oone. or any ten resioents of the cny or town in which sucn land is locatedare hereby notified of their right to reauest tne DePartment of Environmental Protection to issue a Superseding Oroer, providing Inc reauest is made by certified mail or hand delivery to the Deoartment. with tne appropriate filing fee and Fee Transmittal Form as provioed in 310 CMR 10.03(7), within ten days from the date of issuance ot this Determination. A copy ot the request shall at the same time oe sent by certified mail or hand oefivery to the Conservation Commission and the applicant. Detach on clotted line and submit to the No. Andover ConsprvH nu Comm. prior to commencement of work. 'SSuing AutnOnty To North A dove _Lou Cuuun. Please oe advised mat the Oroer of Conoitions for Inc protect at Lot 27 nnnna Drive ::•*e Num-Jr 242-619 as peen recorded at me Pe'tstry of Deeds . Norkl, FSciii nas peen noteo in tne Cain ot title of the attectec Property in accordance with General Condition 8 on 19 anC If recoroed land. tne instrument number wilier: idenuties trus tartsacaon 15 registereC 'ann. me document numoer whicn iclennties transaction is S:cna%J. .,-I,c3n 5-4A