Loading...
HomeMy WebLinkAboutMiscellaneous - 78 VEST WAY Town of North Andover f 14ORT1t Office of the Zoning Board of Appeals °`s' 'A 27 Community Development and Services Division 41 27 Charles Street North Andover,Massachusetts 01845 c►+usEt D. Robert Nicetta Telephone(978)688-9541 Building Commissioner Fax(978)688-9542 Any appeal shall be filed Notice of Decision within(20)days after the Year 2003 date of filing of this notice in the office of the Town Clerk. Proat: for premises at:78 Vest Way NAME: Shaun&Sophie Milliken HEARING(S): 6/10&7/8/03 ADDRESS: 78 Vest Way PETITION: 2003-018 North Andover,MA 01845 TYPING DATE: 7/14/03 The North Andover Board of Appeals held a public hearing at its regular meeting on Tuesday,the 8ffi of July,2003 at 7:30 PM in the Senior Center, 120R Main Street,North Andover upon the application of Shaun&Sophie Milliken,78 Vest Way,North Andover,requesting a dimensional Variance from Section 7,Paragraph 7.3 and Table 2 for right side setback of a proposed addition;and a Special Permit from Section 9,Paragraph 9.2 in order to construct the proposed addition on a pre-existing dwelling on a pre- existing,non-conforming lot. The said premise affected is property with frontage on the South side of Vest Way within the R-1 zoning district. The following members were present: William J.Sullivan,Walter F.Soule,Robert P.Ford,Ellen P. McIntyre,and George M.Earley. Upon a motion by Walter F.Soule and 2°d by Robert P.Ford,the Board voted to GRANT a dimensional Variance from Section 7,Paragraph 7.3 and Table 2 for relief of the right side setback of 5.5' in order to construct the proposed addition;and a Special Permit from Section 9,Paragraph 9.2 in order to construct the proposed addition onto a pre-existing dwelling on a pre-existing,non-conforming lot per Variance Plan,78 Vest Way,North Andover,MA Assessors Map 104B,Lot 170 prepared for Sean Milliken,78 Vest Way,North Andover,MA by James S.Franklin,P.L.S.#87046,New England Engineering Services,60 Beechwood Drive,North Andover,MA,date:May 14,2003,and Milliken Residence Addition,78 Vest Way,North Andover,Mass.,Robert Gould,Architect,280 High Street, Newburyport,Mass.,Issue: 1/30/03 Project No:200225, Sheets G-001,A-102-3,A-201-4,and A-301 on the following condition: 1. The Plan of Land Mylar includes the ground to roof-peak elevations of the existing structure and the approved addition. Voting in favor: William J.Sullivan,Walter F. Soule,Robert P.Ford,Ellen P.McIntyre,and George M.Earley. The Board finds that the applicant has satisfied the provisions of Section 10,paragraph 10.4 of the Zoning Bylaw and that the granting of this Variance will not adversely affect the neighborhood or derogate from the intent and purpose of the Zoning Bylaw,and satisfied the provisions of Section 9,Paragraph 9.2 of the Zoning Bylaw that such change,extension,or alteration shall not be substantially more detrimental than the existing structure to the neighborhood. Page 1 of 2 c c e r U)C_ Fri Board of Appeals 978-688-9541 Building 978-688-9545 Conservation 978-688-9530 Health 978-688-9540 Planning 978- -95337 1"' Town of North Andover Office of the Zoning Board of Appeals Community Development and Services Division 27 Charles Street North Andover,Massachusetts 01845 'ss�cs�t D. Robert Nicetta Telephone(978)688-9541 Building Commissioner Fax(978)688-9542 Furthermore,if the rights authorized by the Variance are not exercised within one(1)year of the date of the grant,it shall lapse,and may be re-established only after notice,and a new hearing. Furthermore,if a Special Permit granted under the provisions contained herein shall be deemed to have lapsed after a two(2)year period from the date on which the Special Permit was granted unless substantial use or construction has commenced,it shall lapse and may be re-established only after notice,and a new hearing. Town of North Andover Board of Appeals, �JL'— w , William I rvan,Chairman Decision 2003-018. Page 2 of 2 Board of Appeals 978-688-9541 Building 978-688-9545 Conservation 978-688-9530 Health 978-688-9540 Planning 978-688-9535 Town of North Andover f nos= Office of the Zoning Board of Appeals Community Development and Services ]Division 27 Charles Street North Andover,Massachusetts 01845 4ss, w D. Robert Nicetta Telephone(978)688-9541 Building Commissioner Fax (978)688-9542 Date (41010> TO: Town of North Andover Zoning Board of Appeals 27 Charles Street North Andover MA 02 845 _-;-�-�CD r Please be advised that I have agreed to waive the time constraints for the No tri <''` Andover Zoning Board of Appeals to make a decision regarding the granting of a - c Variance Special Pe Comprehensive Permit (40B) Finding for property located at: STREET: TOWN: evD ,Z�,-G.- TO MEETING DATE(S): -719/0 3 NAME OF PETITIONER: 46 eel Signed: Petitioner(or petitio epresentative) i4 L V WR B r e 978-688-9541 Building 978-688-9545 Conservation 978-688-9530 Health 978-688-9540 Planning 978-688-9535 JUN BOAFM OF APPEALS Massachusetts Department of Environmental Protection V13 Bureau of Resource Protection - Wetlands DEP File Numbe WPA Form 5 -- Order of Conditions 242-1194 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: From: When filling out forms on North Andover the computer, Conservation Commission use only the tab key t This issuance if for(check one): move your cursor-do ® Order of Conditions not use the return key. ❑ Amended Order of Conditions To: Applicant: Property Owner(if different from applicant): Shaun & Sophie Milliken Same Name Name 78 Vest Way Mailing Address Mailing Address North Andover MA. 01845 CityFrown State Zip Code Cityrr Nn State Zip Cod 1. Project Location: 78 Vest Way North Andover Street Address City/Town Map 104B Parcel 170 Assessors Map/Plat Number ParceULot Number 2. Property recorded at the Registry of Deeds for: Essex North 6257 47 County Book Page Certificate(if registered land) 3. Dates: 4/11/03 10/22/03 10/28/03 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents(attach additional plan references as needed): NOI 4/10/03 Title Date Site Plan 4/8/03 revised Title 10/14/03 Title Date 5. Final Plans and Documents Signed and Stamped by: Richard C. Tangard P.E. Name 6. Total Fee: 115.00 (Bylaw) (from Appendix B:Wetland Fee Transmittal Form) Wpaform5.doc•rev.12/15/00 Page 1 o Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DSP File Number: WPA Form 5 - Order of Conditions 242-1194 Provided by DEP Ll Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ® Public Water Supply ❑ Land Containing Shellfish ® Prevention of Pollution ® Private Water Supply ❑ Fisheries ® Protection of Wildlife Habitat ® Groundwater Supply ® Storm Damage Prevention Flood Control Furthermore,this Commission hereby finds the project,as proposed, is:(check one of the following boxes) Approved subject to: ® the following conditions which are necessary, in accordance with the performance standards set forth in the wetlands regulations, to protect those interests checked above. This Commission orders that all work.shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests,and a final Order of Conditions is issued. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances,bylaws, or regulations. Wpaform5.doc•rev.12/15/00 Page 2 of 7 Massachusetts Department of Environmental Protection -- Bureau of Resource Protection - Wetlands DEP Fite Number: WPA Form 5 - Order of Conditions 242-1194 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this-project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on.the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DEP"] "File Number 242-1194 " 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 12.. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental 9 a p Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. Wpaform5.doc•rev.12/15/00 Page 3 of 7 1 , Massachusetts Department of Environmental Protection DEP Fife Numbe Bureau of Resource Protection - Wetlands WPA Form 5 Order of Conditions 242-1194 `` Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEF B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this.Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediate control any erosion problems that occur at the site and shall also immediately notify the Conservatior Commission, which reserves the right to require additional erosion and/or damage prevention contro it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit o' work line has been approved by this Order. Findings as to municipal bylaw or ordinance Furthermore, the North Andover hereby finds(check one that applies): Conservation Commission ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Municipal Ordinance or Bylaw Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order Conditions is issued. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: North Andover Wetland Protection Bylaw Chapter 178 Municipal Ordinance or Bylaw Citation The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. Wpaform5.doc•rev.12/15/00 Page 4 of DEP FILE#242 - 1194 Therefore, the North Andover Conservation Commission (hereafter the "NACU) hereby finds that the following conditions are necessary,in accordance with the Performance Standards set forth in the State Regulations,the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent,the conditions shall control. GENERAL CONDITIONS 18. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. 19. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued,to evaluate compliance with this Order of Conditions,the Act(310 CMR 10.00),the North Andover Wetlanc ByLaw and Regulations, and may require any information,measurements, photographs,observations, and/or materials,or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resumE until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 20. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal,state or local statutes, ordinances,by- laws or regulations. 21. The work authorized hereunder shall be completed within three years from the datf of this order. 22. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section VIII(B)(p.33) of the North Andover Wetland Regulations). CAWinword\00C\242-1194.doc 1 NACC 10/28/03 DEP FILE#242 - 1194 23. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 24. Where the Department of Environmental Protection(DEP) is requested to make a determination and to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 25. This Order of Conditions is issued under File No. 242-1194. 26. The conditions of this decision shall apply to, and be binding upon,the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 27. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 28. The proposed work includes: The construction of an addition, deck,jacuzzi, patios,landscaped boulder retaining wall and associated grading and landscaping in the buffer zone to bordering vegetated wetland. Work also includes restoration within 50 feet of a wetland resource area. 29. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): Notice of Intent filed by: , Shaun & Sophie Milliken 78 Vest Way North Andover,MA 01845 Dated April 10,2003 Site Plans prepared by: New England Engineering Services,Inc. 60 Beechwood Drive North Andover,MA 01845 Landscape Plan: Wetland Restoration/Site Grading Plan,Milliken Residence,7� Vest Way,North Andover,MA,prepared by Justin R.White, dated Sept. 17,2003; Entitled: Site Plan, 78 Vest Way, North Andover,MA,Dated April 8,2003;Revised 10/14/03; CAWinword\00C\242-1194.doc 2 NACC 10/28/03 DEP FILE#242 - 1194 Enforcement Order: Issued by North Andover Conservation Commission on September 2,2003; Letter: Prepared by Julie Parrino, Conservation Administrator, dated October 2,2003 detailing planting plan requirements; 30. The following wetland resource areas are affected by the proposed work: Buffer Zone to Bordering Vegetated Wetland (BVW). These resource areas are significant to the interests of the Act and Town ByLaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 31. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as shown on the plans dated referenced herein. 32. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a fifty foot(501 No- Disturbance Zone and a fifty foot (501 No-Construction Zone shall be established from the edge of the adjacent wetland resource area. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No-Disturbance zone. (See Section III(D) &Appendix G of the local Regulations). 33. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission. 34. This document shall be included in all construction contracts,subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter,the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 35. The owners of the project and their successors in title, in the event they proceed to alter areas subject to the Commission's jurisdiction under the order, agree that the Order does not in itself impose upon the Town any responsibility to maintain the CAWinword\00C\242-1194.doc 3 NACC 10/28/03 DEP FILE#242 - 1194 proposed drainage system and that said Town shall not be liable for any damage in the event of failure. By acceptance of this Order, the owners agree to indemnify and hold harmless to the Town and its residents for any damage attributable to, alterations undertaken on this property pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding,storm damage or any other form of water damage. Maintenance of the drainage system,if accepted by the Town as part of a public way,becomes the responsibility of the Town. 36. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding,storm damage or any other form of water damage. Mr—PRIORTO CONSTRUCTION 37. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or,if such an appeal has been filed,until all proceedings before the Department or Court have been completed. 38. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done.:In the case of registered land,the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted.to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order.not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 39. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words"Massachusetts DEP,File Number 242-1194." 40. Any changes in the submitted plans caused by the applicant,another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense-of the f said public hearing the NACC will issue an applicant). Within 21 days the close o g p I Y amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes.The proposed project CAWinword\00C\242-1194.doc 4 NACC 10/28/03 DEP FILE#242 - 1194 may be still under review b other local or state boards or agencies. This may result Y Y Y in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction.No work shall begin on a project until written approval has been granted by the NACC. 41. It is the responsibility of the applicant, owner, and/or successor(s)to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of-this Order of Conditions and referenced documents before commencement of construction. 42. Prior to any work commencing on-site,the applicant shall submit to the NACC for approval, a detailed sequence of construction, including the construction of compensation and retention areas,installation of sedimentation/erosion control devices and re-vegetation to be completed before other work begins on-site. 43. Wetland flagging shall be checked prior to start of construction and shall be re- established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with stakes or flags and shall be confirmed by the NACC. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials,stockpiling of soil,or construction activity is to occur beyond this line at any time. All flags used for the above purposes shall be of a color different from other flagging used on the site. 46. A row of staked hay bales backed by trenched siltation fence shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this.Order of Conditions. Should such installation be required by the NACC,they shall be installed within 48 hours of the Commission's request. C:\Winword\OOC\242-1194.doc 5 NACC 10/28/03 DEP FILE#242 - 1194 47. During review of the project site and wetland delineation, the Conservation Administrator identified a violation of the Massachusetts Wetland Protection Act and North Andover Wetland Protection Bylaw. Significant tree clearing had occurred within 100 feet of the wetland resource area,including removal of trees within the 25' No-Disturbance Zone. Approximately 10 to 15 large white pine trees had been removed within 25' of the wetland resource area. Cutting activities occurred approximately one year ago. It appears disturbance to topsoil was limited. Restoration activities were required.to be conducted under an Enforcement Order issued September 2,2003. In addition to the requirements of the Enforcement Order,the restoration activities are included under this Order of Conditions. 48. The applicant shall have on hand at the start of any soil disturbance,removal or stockpiling, a minimum of 25 hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 49. A check payable to the Town of North Andover shall be provided in the amount of $3500 (includes construction and restoration activities),which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC,and shall be posted with the North Andover Town Treasurer through the NACC before commencement of.work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel,and shall be released after completion of the project,provided that provisions,satisfactory to the NACC,have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. 50. The applicant shall designate a Wetland Scientist as an "Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site, during any 24-hour period, including weekends. This person shall be given the authority to stop construction for erosion control purposes. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. At least once during each week in which construction activities occurs on-site and for as long thereafter as ground remains unstabilized,the applicant shall submit a written report from the "Erosion Control Monitor" to the NACC certifying that,to the best of his/her knowledge and belieff based on a careful site inspection,ection, all work is being C:\Winword\OOC\242-1194.doc 6 NACC 10/28/03 DEP FILE#242 - 1194 performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation, turbidity, and/or other water quality impacts. 51. Prior to construction, the applicant shall permanently mark the edge of the established 50' Re-vegetation Zone with signs or markers spaced evenly every 25 feet incorporating the following text: "Protected Wetland Resource Area". This will designate their sensitivity and assure no further inadvertent encroachment into the wetland. These permanent-markers are subject to review and approval by the NACC. The applicant shall instruct all agents to explain these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. 52. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring, or assigning any portion of said land to another party, subject to said Orders of Conditions,the "Compliance Certification Form Affidavit" attached via "Appendix A`signed under the pains and penalties of perjury,stating that said applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5)business days prior to the closing of said land transaction. 53. Once these above mentioned pre-construction requirements are complete,the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative,the contractor,the engineer,wetland scientist and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts; subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors,subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter,the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction meeting (e.g. 72 hours). CAWinword\00C\242-1194.doc 7 NACC 10/28/03 DEP FILE#242 - 1194 DURING CONSTRUCTION 54. Upon beginning work,the applicant shall submit written progress reports every one (1) week detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 55. The restoration area shall be monitored for two growing by a qualified wetland professional and written monitoring reports shall be submitted to the Conservation Department in the spring and fall of each growing season. 56. De-watering activities anticipated shall be supervised and witnessed by the designated erosion control monitor. This designee must be on-site while work specific to de-watering activities are occurring and until complete. If de-watering becomes necessary, activities shall be conducted in accordance with a de-watering plan to be submitted and approved by the Conservation Department. Activities shall be monitored daily by the erosion control monitor to ensure that sediment laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland ByLaw. If emergency de-watering requirements arise,the applicant shall submit a contingency plan to the Commission for approval which provides for the pumped water to be contained in a settling basin, to reduce turbidity prior to discharge into a resource area. 57. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris,including but not limited to lumber,bricks,plaster,wire, lath,paper, cardboard,pipe,tires, ashes, refrigerators,motor vehicles or parts on any of the foregoing. 58. No exposed area shall remain unfinished for more than thirty (30) days,unless approved by the NACC. 59.No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 60. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area and'shall occur at the locations designated on the site pian. 61. After proper grading, all disturbed areas located within a resource area which will �I not remain as wetland areas, shall be loamed (minimum of 4" of quality loam), and CAWinword\00C\242-1194.doc 8 NACC 10/28/03 DEP FILE#242 - 1194 seeded. This shall all be done in accordance with SCS guidelines. All disturbed areas located within wetland resource areas which are to be only temporarily tem oraril disturbed during construction, shall be restored to their original grade, soil profile and vegetative cover. Soil used for this purpose will either be wetlands topsoil or a minimum of 4" of quality loam. 62. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. 63. All waste generated by, or associated with,the construction activity shall be contained within the construction area,and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local ByLaw. 64. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 65. During and after work on this project,there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1)business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling,equipment lubrication, or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 66. No underground storage of fuel oils shall be allowed on any lot within one hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland protection ByLaw. 67. Fertilizers utilized for landscaping and lawn care shall be slow release,low-nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland Protection ByLaw and shall remain in perpetuity. CAWinword\00C\242-1194.doc 9 NACC 10/28/03 DEP FILE#242 - 1194 68. No road salt, sodium chloride, or other de-icing chemicals shall be used on paved surfaces, and any arrangement for snow removal shall so stipulate due to the importance of the site and wetlands. 69. Upon completion of construction and grading,all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by loaming and seeding according to SCS standards. If the latter course is chosen, stabilization will be considered complete once vegetative cover has been achieved. 70. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A—"Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor)of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i. A written letter from a qualified wetlands professional stating the restoration area has successfully completed two full growing seasons. j. An "As-Built"plan prepared and signed and stamped by a Registered Professional Civil Engineer(and/or Registered Professional Land Surveyor) of the Commonwealth, for the public record. This plan will include: ➢ "As-Built" post-development elevations of all drainage &stormwater management structures constructed within 100 feet of any wetland resource area. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone than the entire structure must be depicted to accurately verify compliance. ➢ As-Built locations of all new structures,including decks and patios. ➢ As-Built locations of all restoration areas. C:\Winword\00C\2421194 c 10 NACC 10/28/03 DEP FILE#242 - 1194 ➢ "As-Built"post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone which is regulated as a resource area under the local Wetland Protection Bylaw. ➢ Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, additions, fences, sheds, stone walls,pools,retaining walls,subsurface utilities and decks. ➢ A line showing the limit of work and the extent of existing erosion control devices. "Work" includes 2U disturbance of soils or vegetation. ➢ Location of all subsurface utilities entering the property. 71. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: ➢ 50' No-Disturbance Zone and a 50'No-Construction Zone shall be established from the edge of adjacent wetland resource areas except'in those locations approved under this filing. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC (refer to Section XI(page 18) of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local ByLaw; ➢ Discharge or spillage of pollutants (Condition# 65); ➢ Prohibition of underground fuels (Condition#66); ➢ Limitations on the use of fertilizers,herbicides,road salts,.de-icing compounds and pesticides (Conditions#67& 68). CAWinword\OOC\242-1194.doc 11 NACC 10/28/03 r Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File"umber: WPA Form 5 - Order of Conditions 242-1194 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings cont. 9 (cont.) Additional conditions relating to municipal ordinance or bylaw: See attached This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4, from t e da of issuance. 93 Date This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant.A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environme rotection Regional Office(see Appendix A)and the prope owner(if different from applican . Signatu es: ' On _ � Of f� Day Month and V6ar before me p r onally appea d to me known to be the person described in and who executed the foregoing instrument and acknow dged that he/she executed the same as his/her free act and deed. /,- -Rotary Public My CornafissiorvfExpires This Order is issued to the applicant as follows: ❑ by hand delivery on EKby certified mail, return receipt requested,on ,9 -? P103 Date Date Wpaform5.doc-rev.12/15/00 Page 5 of 7 LlMassachusetts Department of Environmental Protection DEP File Number Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions P 2- a by 4 DEP Massachusetts Wetlands Protection Act M.G.L. c. 131 40 C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subjec to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the reques shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and hoa the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. North Andover Conservation Commission Wpaform5.doc•rev.12/15!00 Page 6 of i DEP FILE#242 - 1194 APPENDIX A -AFFIDAVIT I, on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) 1. I am the of (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP or NACC number) the North Andover Conservation Commission. &/or 2. I am the of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. 1 hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. 4. 1 hereby affirm and acknowledge that on this day of 19 1 inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File#) 5. I hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File#) Signed under the pains and penalties of perjury this day of V (Signature-authorized agent of applicant or owner) C:\Winward\00C\242-1194.doc 12 NACC 5/14/03 • 1 S Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File"umber: WPLlAForm 5 Order of Conditions 242-1194 '` Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ---------------------------------------------------------------------------------------------------------------------------- To: North Andover Conservation Commission Please be advised that the Order of Conditions for the Project at: Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Wpaform5.doc•rev.12/15/00 Page 7 of 7 L11Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Appendix E — Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Request Information Important: When filling 1. Person or party making request(if appropriate, name the citizen group's representative): out forms on the computer, Name use only the tab key to Mailing Address move your cursor-do City/Town State Zip Code not use the return key. Phone Number Fax Number(if applicable) QProject Location Mailing Address enam City/Town State Zip Code 2. Applicant(as shown on Notice of Intent(Form 3),Abbreviated Notice of Resource Area Delineation (Form 4A); or Request for Determination of Applicability (Form 1)): Name Mailing Address City/Town State Zip Code Phone Number Fax Number(if applicable) 3. DEP File Number: B. Instructions 1. When the Departmental action request is for(check one): ❑ Superseding Order of Conditions ❑ Superseding Determination of Applicability ❑ Superseding Order of Resource Area Delineation Send this form and check or money order for$50.00, payable to the Commonwealth of Massachusetts to: Department of Environmental Protection Box 4062 Boston, MA 02211 wpaformS.doc•Appendix E•rev.519103 Page t of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Appendix E - Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Instructions (cont.) 2. On a separate sheet attached to this form, state clearly and concisely the objections to the Determination or Order which is being appealed. To the extent that the Determination or Order is based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. 3. Send a copy of this form and a copy of the check or money order with the Request for a Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP Regional Office(see Appendix A). 4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. wpaform5.doc•Appendix E•rev.519103 Page 2 of 2 f tAORTH Ct tY`ao ,',61 COt MCn�Kw y1' SSAC HUS���� CONSERVATION DEPARTMENT Community Development Division Modification to Order of Conditions The NORTH ANDOVER CONSERVATION COMMISSION agreed to accept Applicant:a tr. Y+W O�yt - r `'t ; vV'i alt i ( Mon Q610-4- U:11(4 k\ IkVdQ !� t A WrQM Fns RMKT--For, -ltc Aeei-, aAd *4t t igA►vtafloo cif Sj)Vht. ILd(a/4G&At>C- t04t(5 . /05 `-410Atiy DK n,c c,4AK eAAfi'jt'U Li 6 n Vit nay A>am 111 PI a H ",oPorf lj ajtbj a zme Pr1 rzKAG�&ct( tld as a Modification to the Order of Conditions issued in File 242-%/4'y dated and recorded in Book# ,5 and page qq Issued by the NORTH ANDD ER CONSERVATION COMMISSION: t'1 .r►.c.t L-1 On this �i ' of before me personally appeared Scott Masse to me day m th/yr known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. Notary Public Nfy C mmission Expires EDONMILWEDGE to AWFUBW CaM1YlOMMTH of tAASSACHUSM My Camm.Expk=Aug.7,2009 NRON 1600 Osgood Street,North Andover,Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.townofnorthandover.com r a Massachusetts Department of Environmental Protection �— Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance � 242-1194 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the Shaun Milliken computer, use Name only the tab key to move 78 Vest Way your cursor- Mailing Address do not use the North Andover MA. 01845 return key. City/Town State Zip Code t� 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Shaun Milliken Name 10/28/03 242-1194 Dated DEP File Number 3. The project site is located at: 78 Vest Way North Andover Street Address City/Town Map 104B Parcel 170 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Shaun Milliken Property Owner(if different) Essex North 6257 47 County Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 7/21/06 Date B. Certification Check all that apply: ® Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are: wpaform 8b.doc•rev.7/13/04 Page 1 of 4 Massachusetts Department of Environmental Protection Ll Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of ComplianceMassachusetts Wetlands Protection Act M.G.L. c. 131, 40 242-1194 Provided by DEP B. Certification (cont.) ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ® Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: 71 C. Authorization Issued by: North Andover Conservation Commission Date of Issuance This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Office (See Attachment). Signatures: FW_ - " wpaform 8b.doc•rev,7113/04 Page 2 of 4 Massachusetts Department of Environmental Protection �-- Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance � 242-1194 Massachusetts Wetlands Protection Act M.G.L. c. 131 §40 Provided by DEP C. Authorization (cont.) Notary Acknowledgement Commonwealth of Massachusetts County of Essex North On thisDOf Day Month Year before me, the undersigned Notary Public, personally appeared Name of Document Signer proved to me through satisfactory evidence of identification,which was/were Massachusetts License Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of North Andover Conservation Commission City/Town K�E ignature of Notary Public DomNOTARYPJWC CMADNIMTHOFMASSACHUSEM Printed Name of Notary Public My Comm.Expkw Aug.T,2009 S/1171.2 e 0 My Co issi Expires(Date) Place notary seal and/or any stamp above A" �t. L' Si ature of Notary Public wpaform 8b.doo•rev.7/13/04 Page 3 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 242-1194 LIZ� 4 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: North Andover Conservation Commission Please be advised that the Certificate of Compliance for the project at: 242-1194 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County for: Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpaform 8b.doc•rev.7/13/04 Page 4 of 4 Massachusetts Department of Environmental Protection �-- Bureau of Resource Protection - Wetlands DEP Regional Addresses 1 Massachusetts Wetlands Protection Act M.G.L. c 131, §40 Mail transmittal forms and DEP payments,payable to: Commonwealth of Massachusetts Department of Environmental Protection Box 4062 Boston, MA 02211 DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tyringham Agawam Conway Hancock Montague 436 Dwight Street Plainfield wales Alford Cummington Hatfield Monterey Richmond Ware Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick Springfield,MA 01103 Ashfield Deerfield Heath Monson Russell Washington Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell Belchertown East Longmeadow Holland New Ashford Savoy Westfield Fax:413-784-1149 Bernardston Egremont Holyoke New Marlborough Sheffield Westhampton Blandford Erving Huntington New Salem Shelburne West Springfield Brimfield Florida Lanesborough North Adams Shutesbury West Stockbridge Buckland Gill Lee Northampton Southampton Whately Chartemont Goshen Lenox Northfield South Hadley Wilbraham Cheshire Granby Leverett Orange Southwick Williamsburg Chester Granville Leyden Otis Springfield Williamstown Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor Chicopee Greenfield Ludlow Pelham Sunderland Worthington Clarksburg Hadley Middlefield Peru Tolland DEP Central Region Acton Charlton Hopkinton Millbury Rutland Uxbridge 627 Main Street Ashburnham Clinton Hubbardston Millville Shirley Warren Ashby Douglas Hudson New Braintree Shrewsbury Webster Worcester, MA 01608 Athol Dudley Holliston Northborough Southborough Westborough Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West Boylston Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield Barre Fitchburg Leominster Oakham Sterling Westford TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster Berlin Grafton Lunenburg Paxton Sturbridge Winchendon Blackstone Groton Marlborough Pepperell Sutton Worcester Bolton Harvard Maynard Petersham Templeton Boxborough Hardwick Medway Phillipston Townsend Boylston Holden Mendon Princeton Tyngsborough Brookfield Hopedale Milford Royalston Upton DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provincetown Tisbury 20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro Attleboro Dighton Gosnold Nantucket Rehoboth Wareham Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester Wellfleet Phone:508-946-2700 Barnstable Eastham Hanover North Attleborough Rockland West Bridgewater Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport Bourne Easton Harwich Norwell Scituate West Tisbury TDD:508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham Brockton Fall River Mansfield Pembroke Somerset Yarmouth Carver Falmouth Marion Plainville Stoughton Chatham Foxborough Marshfield Plymouth Swansea Chilmark Franklin Mashpee Plympton Taunton DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield 1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole Arlington Cohasset Hull Middleton Reading Waltham Boston,MA 02108 Ashland Concord Ipswich Millis Revere Watertown Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley Wellesley Beverly Dover Lincoln Natick Salem Wenham TDD:617-574-6868 Billerica Dracut Lowell Needham Salisbury West Newbury Boston Essex Lynn Newbury Saugus Weston Boxford Everett Lynnfield Newburyport Sherborn Westwood Braintree Framingham Malden Newton Somerville Weymouth Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington Burlington Gloucester Marblehead North Andover Sudbury Winchester Cambridge Groveland Medfield North Reading Swampscott Winthrop Canton Hamilton Medford Norwood Tewksbury Woburn Carlisle Haverhill Melrose Peabody Topsfield wpaform8b.doc•DEP Addresses•rev.7/19/06 Page 1 of 1