HomeMy WebLinkAboutMiscellaneous - 121 CARTER FIELD ROAD Town of North Andover NORTH
Oft��eu �1�0
Office of the Planning Department
Community Development and Services Division
William J. Scott, Division Director " -=��• '
27 Charles Street ss�c►iugf`�g
North Andover,Massachusetts 01845
Julie Parrino Telephone(978)688-9535
Town Planner Fax(978)688-9542
Notice Of Decision
Any appeal shall be filed
Within (20) days after the
Date of filing this Notice
In the Office of the Town
Clerk
4b Date: April 21,2004
Date of Hearing: April 6,2004
Decision: April 20, 2004
Petition of: Thomas D. Zahoruiko 121 Carter Field Road,North Andover,MA 01845
Premises Affected: 121 Carter Field Road,'North Andover, MA 01845
Referring to the above petition for a Watershed Special Permit. The application was
determined to be complete and was noticed and reviewed in accordance with the
procedures for review and approval in accordance with the Rules and Regulations
Governing the Subdivision of Land and M.G.L. Chapter 40-A,sec 11
So as to allow: The construction of an inground swimming pool, concrete terrace, fencing
and retaining walls located within the Non-Discharge Zone of the Watershed Protection District.
After a public hearing given on the above date,the Planning Bo I vote o APP VE,
the Watershed Special Permit, based upon the following co s:
Si
erto le , Chairman
Cc: Applicant yedrge W i ,Vice Chairman
Engineer Felipe Sch arz, Clerk
Abutters John Simons
DPW James Phinney
Building Department
Conservation Department
Health Department
ZBA .
Fri
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 n
121 Carter Field Road (Lot 3)
Special Permit- Watershed Protection District
The Planning Board makes the following findings regarding the application of Thomas D.
Zahoruiko, 121 Carter Field Road,North Andover; MA 01845 filed on March 5, 2004.
The area affected is located at 121 Carter Field Road in the R-1 Zoning District, Map 62,
Lot 2. The lot was created after 1994 and is subject to the Watershed Protection District
provisions for lots created after October 24, 1994. The applicant is requesting a Watershed
Special Permit for the construction of an in-ground swimming pool, concrete terrace,
fencing and retaining walls located within the Non-Discharge of the Watershed Protection
District. Public hearings were held on April 6, 2004.
A Watershed Special Permit was issued by the Planning Board on December 27, 2002 for
construction of a 17 lot single family homes, a roadway, stormwater management structures,
associated grading and utilities,in the Conservation, Non-Disturbance and Non-Discharge
Zone. A Watershed Special Permit for the pool is being issued in addition to the Watershed
Special Permit previously issued for the house construction permitted under the Subdivision
Watershed Special Permit.
FINDINGS OF FACT:
In accordance with 4.136 the Planning Board makes the finding that the intent of the Bylaw,
as well as its specific criteria, are met. Specifically the Planning Board finds:
1. That as a result of the proposed construction in conjunction with other uses nearby,
there will not be any significant degradation of the quality or quantity of water in or
entering Lake Cochichewick. The Planning Board bases its findings on the
following facts:
a) The proposed structures will be connected to the Town sewer system;
b) A covenant will be placed in the deed restricting and limiting the types of
fertilizers that can be used on the site.
c) The filtration system being proposed for the pool includes a "Pentair" FNS
Diatomaceous Earth Filter with strainer and in-line disinfector, "Vision Nature
2" passive ionizer to reduce chlorine usage by 75%,(reduces PPM from 2.0 ppm
to 0.5 ppm), supplemented by a "Andrews Advantage" In-floor Circulation and
Cleaning system which provides reductions in energy and chemicals of an
additional 40%.The filtration system will be accompanied by a Separation Tank,
which allows clearing of debris and diatomaceous earth while returning the
discharge water directly back into the pool; eliminating external back-flushing
discharge. Use of this particular type of filtration system, or its equal or better
will be placed in the deed.
d) The topography of the site will not be altered substantially.
e) The limit of clearing is restricted to the minimum necessary to
construct/renovate the structure and appurtenances;
f) This decision is being issued in addition to the decision issued on December 27,
2002 for construction of the house. All conditions required in that decision must
be adhered too in addition to the conditions required under this permit.
2. There is no reasonable alternative location outside the Non-Discharge Buffer.Zone,
for any discharge,structure or activity,associated with the proposed project.
3. In accordance with Section 10.31 of the North Andover Zoning Bylaw,the Planning
Board makes the following findings:
a) The specific site is an appropriate location for the proposed use as all feasible
storm water and erosion controls have been placed on the site;
b) The use will not adversely affect the neighborhood as the use is accessory to an
existing single family;
c) There will be no nuisance or serious hazard to vehicles or pedestrians;
d) Adequate and appropriate facilities are provided for the proper operation of the
proposed use;
e) The Planning Board also makes a specific finding that the use is in harmony with
the general purpose and intent of the North Andover Zoning Bylaw.
Upon reaching the above findings, the Planning Board approves this Special Permit based
upon the following conditions:
SPECIAL CONDITIONS:
1) This decision must be filed with the North Essex Registry of Deeds. The following
information is included as part of this decision:
a) Town of North Andover Planning Board Application for Watershed Special Permit
filed by Thomas Zahoruiko on March 5,2004;
b) Plans entitled:
Pool Layout Plan, Sheet 1, Terrace Details, Sheet 2, Project: Zahoruiko
Residence,NorthAndover,Massachusetts,prepared by Huntress Associates,
Inc., Landscape .,Architecture & Land 'Planning, 17 Tewksbury; Street,
Andover, Massachusetts 01810, dated 3%2/04, stamped by Frank C.
Monteiro,P.E. and Christian Huntress,Registered Landscape Architect.
c) Certification Letter:
• Prepared by Frank Monteiro, P.E. dated March 4,2004;
d) Drainage Calculation:
• Prepared by MHF Design Consultants, Inc. 103 Stiles Road, Suite One,
Salem,NH 03079, dated March 15,2004, stamped by Frank Monteiro,P.E.;
The Town Planner shall approve any changes made to these plans. Any changes
deemed substantial by the Town Planner would require a public hearing and
modification by the Planning Board.
2) PRIOR TO ANY WORK ON SITE:
a) A performance guarantee of one thousand dollars ($1,000) in the form of a check
made out to the Town of North Andover must be posted to insure that construction
will take place in accordance with the plans and the conditions of this decision and
to ensure that thews-built plans will be submitted. ,*
b) The limit of work as shown on the plan by the erosion control line must be marked
in the field and must be reviewed and approved by the Town Planner.
c) All erosion control measures as shown on the plan must be in place and reviewed by
the Town Planner. Deteriorated erosion control measures shall be replaced and
maintained throughout the duration of the project.
d) The site shall have received all necessary permits and approvals;from the North
Andover Conservation Commission, Board of Health, and the Department of Public
Works and be in compliance with the above permits and approvals.
3) PRIOR TO THE ISSUANCE OF A BUILDING PERNHT:
a) . The decision must be filed with the North Essex Registry of Deeds.One certified
copy of the recorded decision must be submitted to the Planning Department.
b) No pesticides, fertilizers or chemicals shall be used in lawn care or maintenance
within 400' of Lake Cochichewick or within 400' of wetland resource areas. The
applicant shall incorporate this condition as a deed restriction, and a copy of the
recorded deed shall be submitted to the Town Planner and included in the file.
c) The pool filtration system proposed is a "Pentair" FNS Diatomaceous Earth Filter
with strainer and in-line disinfector, "Vision Nature-2" passive ionizer to reduce
chlorine usage by 75% (reduces PPM from 2.0 ppm to 0.5 ppm), supplemented by a
"Andrews Advantage" In-floor Circulation and Cleaning system which provides
reductions in energy and chemicals of an additional 40%. The filtration system will
l
be accompanied by a Separation Tank, which allows clearing of debris and
diatomaceous earth while returning the discharge water directly back into the pool,
eliminating external back-flushing discharge. This filtration system must be
incorporated into the deed as a restriction and use of this
system or its equal or
Y
better must be used in perpetuity on the site. Changes of the type of pool
filtration system used must be reviewed and approved by the North Andover
Planning Board. Failure to comply with this condition will result in revocation of
the Special Permit.
4) PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:
a) Foundation Plan: Immediately upon completion of the pool foundation and prior to
further construction activities associated with the site, the applicant shall complete a plan
prepared by a Registered Professional Land Surveyor (R.P.L.S.) which accurately depicts
the foundation location and its proximity to wetland resource areas and watershed buffer
zones as shown on the approved Watershed Site Plan. Said plan shall be submitted to the
Town Planner for review to verify that the setback limits under the special permit have been
met.
5) PRIOR TO THE RELEASE OF THE PERFORMANCE BOND:
a) The applicant shall submit an as-built plan stamped by a Registered Professional
Engineer or Land Surveyor in Massachusetts that shows all construction,limits of
disturbance, existing topography, storm water mitigation structures and other
pertinent site features. This as-built plan shall be submitted 40 the Town Planner and
the Department of Public Works for approval. The applicant must submit a written
stamped and signed,certification letter from the design engineer that the site was
constructed as shown on the approved plan. Any and all changes from the original
plans must be clearly identified in the letter.
b) The Planning Board must by a majority vote make a finding that the site is in
conformance with the approved plan.
6) In no instance shall the applicant's proposed construction be allowed to further impact
the site than as proposed on the plan referenced in Condition# 1.
7) No open burning shall be done except as is permitted during burning season under the
Fire Department regulations.
8) The Contractor shall contact Dig Safe at least 72 hours prigr to commencing excavation.
9) The provisions of this conditional approval shall apply to and be binding upon the
applicant, it's employees and all successors and assigns in interest or control.
10) This Special Permit approval shall be deemed to have lapsed April 20, 2006 (two
years from the date of issuance) exclusive of the time required to pursue or await
determination of any appeals, unless substantial use or construction has commenced
within said two year period. Substantial use or construction will be determined by a
majority vote of the Planning Board
cc: Applicant
File
Y
Town of North Andover µORT~
Offi• F�r pa���e°ea+stiCO7D
ce of the Planning Department
Community Development and Services Division
William T. Scott, Division Director '� °� �=�•
27 Charles Street
Julie Parrino P ( )978 hone
North Andover,Massachusetts 01845 Tele 688-9535
Town Planner Fax(978)688-9542
Notice Of Decision
Any appeal shall be filed
Within (20) days after the
Date of filing this Notice
In the Office of the Town
Clerk
Date: April 21,2004
Date of Hearing: April 6,2004
Decision: April 20, 2004
Petition of.- Thomas D. Zahoruiko 121 Carter Field Road,North Andover,MA 01845
Premises Affected: 121 Carter Field Road,'North Andover, MA 01845
Referring to the above petition for a Watershed Special Permit. The application was
determined to be complete and was noticed and reviewed in accordance with the
procedures for review and approval in accordance with the Rules and Regulations
Governing the Subdivision of Land and M.G.L. Chapter 40-A,sec 11
So as to allow: The construction of an inground swimming pool, concrete terrace, fencing
and retaining walls located within the Non-Discharge Zone of the Watershed Protection District.
After a public hearing given on the above date,the Planning Bo votAPP� VE,
the Watershed Special Permit,based upon the following co diti s: 1'
f
f
erto A40,Chairman
Cc: Applicant "eorge"#,Vice Chairman
Engineer Felipe SchvVarz,Clerk
Abutters John Simons
DPW James Phinney
Building Department
Conservation Department
Health Department
ZBA
BOARD OF APPEALS 688-9541 BIT 1,DING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 �'
121 Carter Field Road (Lot 3)
Special Permit-Watershed Protection District
The Planningm h
Board makes the following findings regarding the application of Thomas D.
Zahoruiko, 121 Carter Field Road, North Andover, MA 01845 filed on March 5, 2004.
The area affected is located at 121 Carter Field Road in the R-1 Zoning District, Map 62,
Lot 2. The lot was created after 1994 and is subject to the Watershed Protection District
provisions for lots created after October 24, 1994. The applicant is requesting a Watershed
Special Permit for the construction of an in-ground swimming pool, concrete terrace,
fencing and retaining walls located within the Non-Discharge of the Watershed Protection
District. Public hearings were held on April 6, 2004.
A Watershed Special Permit was issued by the Planning Board on December 27, 2002 for
construction of a 17 lot single family homes, a roadway, stormwater management structures,
associated grading and utilities,in the Conservation, Non-Disturbance and Non-Discharge
Zone. A Watershed Special Permit for the pool is being issued in addition to the Watershed
Special Permit previously issued for the house construction permitted under the Subdivision
Watershed Special Permit.
FINDINGS OF FACT:
In accordance with 4.136 the Planning Board makes the finding that the intent of the Bylaw,
as well as its specific criteria,are met. Specifically the Planning Board finds:
1. That as a result of the proposed construction in conjunction with other uses nearby,
there will not be any significant degradation of the quality or quantity of water in or
entering Lake Cochichewick. The Planning Board bases its findings on the
following facts:
a) The proposed structures will be connected to the Town sewer system;
b) A covenant will be placed in the deed restricting and limiting the types of
fertilizers that can be used on the site.
c) The filtration system being proposed for the pool includes a "Pentair" FNS
Diatomaceous Earth Filter with strainer and in-line disinfector, "Vision Nature
2" passive ionizer to reduce chlorine usage by 75% (reduces PPM from 2.0 ppm
to 0.5 ppm), supplemented by a "Andrews Advantage" In-floor Circulation and
Cleaning system which provides reductions in energy and chemicals of an
additional 40%. The filtration system will be accompanied by a Separation Tank,
which allows clearing of debris and diatomaceous earth while returning the
discharge water directly back into the pool, eliminating external back-flushing
discharge. Use of this particular type of filtration system, or its equal or better
will be placed in the deed.
d) The topography of the site will not be altered substantially.
e) The limit of clearing is restricted to the minimum necessary to
construct/renovate the structure and appurtenances;
f) This decision is being issued in addition to the decision issued on December 27,
2002 for construction of the house. All conditions required in that decision must
be adhered too in addition to the conditions required under this permit.
2. There is no reasonable alternative location outside the Non-Discharge Buffer Zone,
for any discharge, structure or activity, associated with the proposed project.
3. In accordance with Section 10.31 of the North Andover Zoning Bylaw,the Planning
Board makes the following findings:
a) The specific site is an appropriate location for the proposed use as all feasible
storm water and erosion controls have been placed on the site;
b) The use will not adversely affect the neighborhood as the use is accessory to an
existing single family;
c) There will be no nuisance or serious hazard to vehicles or pedestrians;
d) Adequate and appropriate facilities are provided for the proper operation of the
proposed use;
e) The Planning Board also makes a specific finding that the use is in harmony with
the general purpose and intent of the North Andover Zoning Bylaw.
Upon reaching the above findings, the Planning Board approves this Special Permit based
upon the following conditions:
SPECIAL CONDITIONS:
1) This decision must be filed with the North Essex Registry of Deeds. The following
information is included as part of this decision:
a) Town of North Andover Planning Board Application for Watershed Special Permit
filed by Thomas Zahoruiko on March 5,2004;
b) Plans entitled:
Pool Layout Plan, Sheet 1, Terrace Details, Sheet 2, Project: Zahoruiko
Residence,North Andover,Massachusetts,prepared by Huntress Associates,
Inc., Landscape Architecture & Land Planning, 17 Tewksbury Street,
Andover, Massachusetts 01810, dated 3/2/04, stamped by Frank C.
Monteiro,P.E. and Christian Huntress,Registered Landscape Architect.
c) Certification Letter:
• Prepared by Frank Monteiro,P.E. dated March 4, 2004;
d) Drainage Calculation:
• Prepared by MHF Design Consultants, Inc. 103 Stiles Road, Suite One,
Salem,NH 03079,dated March 15, 2004, stamped by Frank Monteiro,P.E.;
The Town Planner shall approve any changes made to these plans. Any changes
deemed substantial by the Town Planner would require a public hearing and
modification by the Planning Board.
2) PRIOR TO ANY WORK ON SITE:
a) A performance guarantee of one thousand dollars ($1,000) in the form of a check
made out to the Town of North Andover must be posted to insure that construction
will take place in accordance With the plans and the conditions of this decision and
to ensure that the as-built plans will be submitted.
b) The limit of work as shown on the plan by the erosion control line must be marked
in the field and must be reviewed and approved by the Town Planner.
c) All erosion control measures as shown on the plan must be in place and reviewed by
the Town Planner. Deteriorated erosion control measures shall be replaced and
maintained throughout the duration of the project.
d) The site shall have received all necessary permits and approvals from the North
Andover Conservation Commission, Board of Health, and the Department of Public
Works and be in compliance with the above permits and approvals.
3) PRIOR TO THE ISSUANCE OF A BUILDING PERMIT:
a) The decision must be filed with the North Essex Registry of Deeds. One certified
copy of the recorded decision must be submitted to the Planning Department.
b) No pesticides, fertilizers or chemicals shall be used in lawn care or maintenance
within 400' of Lake Cochichewick or within 400' of wetland resource areas. The
applicant shall incorporate this condition as a deed restriction, and a copy of the
recorded deed shall be submitted to the Town Planner and included in the file.
c) The pool filtration system proposed is a "Pentair" FNS Diatomaceous Earth Filter
with strainer and in-line disinfector, "Vision Nature 2" passive ionizer to reduce
chlorine usage by 75% (reduces PPM from 2.0 ppm to 0.5 ppm), supplemented by a
"Andrews Advantage" In-floor Circulation and Cleaning system which provides
reductions in energy and chemicals of an additional 40%. The filtration system will
be accompanied by a Separation Tank, which allows clearing of debris and
diatomaceous earth while returning the discharge water directly back into the pool,
eliminating external back-flushing discharge. This filtration system must be
incorporated into the deed as a restriction and use of this system or its equal or
better must be used in perpetuity on the site. Changes of the type of pool
filtration system used must be reviewed and approved by the North Andover
Planning Board. Failure to comply with this condition will result in revocation of
the Special Permit.
4) PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:
a) Foundation Plan: Immediately upon completion of the pool foundation and prior to
further construction activities associated with the site, the applicant shall complete a plan
prepared by a Registered Professional Land Surveyor (R.P.L.S.) which accurately depicts
the foundation location and its proximity to wetland resource areas and watershed buffer
zones as shown on the approved Watershed Site Plan. Said plan shall be submitted to the
Town Planner for review to verify that the setback limits under the special permit have been
met.
5) PRIOR TO THE RELEASE OF THE PERFORMANCE BOND:
a) The applicant shall submit an as-built plan stamped by a Registered Professional
Engineer or Land Surveyor in Massachusetts that shows all construction, limits of
disturbance, existing topography, storm water mitigation structures and other
pertinent site features. This as-built plan shall be submitted to the Town Planner and
the Department of Public Works for approval. The applicant must submit a written
stamped and signed, certification letter from the design engineer that the site was
constructed as shown on the approved plan. Any and all changes from the original
plans must be clearly identified in the letter.
b) The Planning Board must by a majority vote make a finding that the site is in
conformance with the approved plan.
6) In no instance shall the applicant's proposed construction be allowed to further impact
the site than as proposed on the plan referenced in Condition# 1.
7) No open burning shall be done except as is permitted during burning season under the
Fire Department regulations.
8) The Contractor shall contact Dig Safe at least 72 hours prior to commencing excavation.
9)The provisions of this conditional approval shall apply to and be binding upon the
applicant, it's employees and all successors and assigns in interest or control
10) This Special Permit approval shall be deemed to have lapsed April 20, 2006 (two
p p
years from the date of issuance) exclusive of the time required to pursue or await
determination of any appeals, unless substantial,use or construction has commenced
within said two year period. Substantial use or construction will be determined by a
majority vote of the Planning Board
cc: Applicant
File