of Massachusettsaocitcanc Robert Janusz
Lot 25 Candlestick Road
Order of Conditions
Massachusetts Wetlands Protection Act
G.L. c. 131, §40
and under the Town of North Andover's Wetlands Bylaw, Chapter 178
From
To Robert Janusz c
(Name of Applicant) (Name of property ownerl
40 Sunset Rock Rd.
Address Andover, MA a k i n Address
This Order is issued and delivered as follows:
❑ by hand delivery to applicant or representative on - (date)
❑ by certified mail.return receipt requested on (date)
This project is located at Lot 25 Candlestick Rnad
The property is recorded at the Registry of Deeds, North Essex
Book 3289 Page 96
Cenificate(if registered)
The Notice of Intent for this project was filed on November 25, 1992 (date)
The public hearing was closed on January 6. 1993 (date)
Findings
The has reviewed the above-referenced Notice of
Intent anc Pians ana nas neto a auaiic hearing an the::ro)e_t. Based on the information avaiiaole to the
NArr at this time.the NA .0 has determined that
the area on which the proposed work is to be done is significant to the following interests in accoroance with
the Presurnauons of Significance set forth in me reguiations for each Area Subject to Protection Uncer the
Act(cf:eck as aparopnatel: Ch.178 prevention of erosion and sedimentation
Pubic water supply Flood controlL7 Land containing shellfish
LIT Private water supply Storm damage prevention Fisheries
1Z Ground water supply Prevention of pollution Mf Protection of wildlife habitat
Ch. 178 Wildlife Ch 17fa Recreation
Total Filing Fee Submitted State Share
City,Town Share $137.5 ('h_ fee in excess cf S25)
Total Refund Due 5 City/Town Portion S State Portion S
(Yz total) ('h total)
Cife=ve 111,01E9
Therefore, the North Andover Conservation Commission (hereafter
the "NACC") hereby finds that the following conditions are
necessary, in accordance with the Performance Standards set forth
in the State Regulations, the local ByLaw and Regulations, to
protect those interests noted above. The NACC orders that all
work shall be performed in accordance with said conditions and
with the Notice of Intent referenced above. To the extent that
the following conditions modify or differ from the plans,
specifications or other proposals submitted with the Notice of
Intent, the conditions shall control.
GENERAL CONDITIONS
1. Failure to comply with all conditions stated herein, and with
all related statutes and other regulatory measures, shall be
deemed cause to revoke or modify this Order.
2 . This Order does not grant any property rights or any
exclusive privileges; it does not authorize any injury to
private property or invasion of private rights.
3 . This Order does not relieve the permittee or any other person
of the necessity of complying with all other applicable federal,
state or local statutes, ordinances, by-laws or regulations.
4. The work authorized hereunder shall be completed within three
years from the date of this Order.
5. This Order may be extended by the issuing authority for one
or more periods of up to one year each upon application to the
issuing authority at least 30 days prior to the expiration date
of the Order.
6. Where the Department of Environmental Protection is requested
to make a determination and to issue a Superseding Order, the
Conservation Commission shall be a party to all agency
proceedings and hearings before the Department.
7. The proposed work includes construction of a single family
home and driveway.
8. The work shall conform to the following (except as noted in
the remainder of this document where revisions may be required) :
(a) Notice of Intent filed by Robert Janusz.
(b) Plans prepared by Thomas E. Neve Assoc. , inc. dated 11/19/92.
9. The following wetland resource areas are affected by the
proposed work: bordering land subject to flooding, and bordering
vegetated wetland. These resource areas are significant to the
interests of the Act and Town Bylaw as noted above. These
#242-640 Lot 25 Candlestick Road 3
resource areas are also significant to the recreational and
wildlife interests of the Bylaw. The applicant has not attempted
to overcome the presumption of significance of these resource
areas to the identified interests.
10. The NACC agrees with the applicant's delineation of the
wetland resource areas on the site as shown on the plans dated
November 10, 1992.
11. Issuance of these Conditions does not in any way imply or
certify that the site or downstream areas will not be subject to
flooding or storm damage.
12 . The conditions of this decision shall apply to, and be
binding upon, the applicant, owner, its employees and all
successors and assigns in interest or control.
13. In order to prevent any alteration of wetland resource areas
beyond those proposed in the Notice of Intent and approved
herein, a twenty-five (25) foot no-disturbance zone and a fifty
(50) foot no-construction zone shall be established from the edge
of the adjacent wetlands. No disturbance of existing grade,
soils or vegetation is permitted in the no-disturbance zone,
(See Appendix 5 of the local Regulations) except for the
construction of the driveway and associated grading for same.
PRIOR TO CONSTRUCTION
14. No work shall be undertaken until all administrative appeal
periods from this Order have elapsed or, if such an appeal has
been filed, until all proceedings before the Department or Court
have been completed.
15. This Order shall be recorded by the applicant at the
Registry of Deeds immediately after the expiration of all appeal
periods. No work shall be undertaken until the Final Order has
been recorded in the Registry of Deeds or the Land Court for the
district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index
under the name of the owner of the land upon which the proposed
work is to be done. In the case of registered land, the Final
Order shall also be noted on the Land Court Certificate of Title
of the owner of the land upon which the proposed work is to be
done. The recording information shall be submitted to the North
Andover Conservation Commission on the format the end of this
Order prior to commencement of the work.
16. A sign shall be displayed at the site not less than two
square feet or more than three square feet in size bearing the
words, "Massachusetts Department of Environmental Protection,
#242-640 Lot 25 Candlestick Road 4
File Number 242-640".
17. Any changes in the submitted plans caused by the applicant,
another Board's decision or resulting from this Order of
Conditions must be submitted to the NACC for approval prior to
implementation.p ntation. If the NACC finds said changes to be
significant, the NACC will call for another public hearing (at
the expense of the applicant) . Within 21 days of the close of
said public hearing the NACC will issue an amended or new Order
of Conditions. Any errors found in the plans or information
submitted by the applicant shall be considered as changes. The
proposed project may be still under review by other local or
state boards or agencies. This may result in changes to the
project plans or wetland impacts. If any such changes occur a
revised plan and an explanation of the revisions shall be
submitted to the NACC for review and approval prior to the start
of construction. No work shall begin on a project until written
approval has been granted by the NACC.
18. The applicant shall contact the Conservation Office prior to
site preparation or construction and shall arrange an on-site
conference with an NACC representative, the contractor and the
applicant to ensure that all of the Conditions of this Order are
understood. This Order also shall be made a part of the
contractor's written contract. The applicant or contractor shall
notify the NACC in writing of the identity of the on-site
construction supervisor hired to coordinate construction and to
ensure compliance with this Order.
19. The applicant shall submit a construction schedule/sequence
to the NACC detailing the proposed sequence of work on site to
complete this project.
20. Wetland flagging shall be checked prior to start of
construction and shall be re-established where missing so that
erosion control measures can be properly placed and wetland
impacts can be monitored.
21. A row of staked hay bales backed by a siltation fence shall
be placed between all construction areas and wetlands. The
erosion control barrier will be properly installed and placed as
shown on the plan and shall be inspected and approved by the NACC
prior to the start of construction and shall remain intact until
all disturbed areas have been permanently stabilized to prevent
erosion. All erosion prevention and sedimentation protection
measures found necessary during construction shall be implemented
at the direction of the NACC.
22. The applicant shall have on hand at the start of any soil
disturbance, removal or stockpiling, a minimum of twenty-five
(25) hay bales and sufficient stakes for staking these bales (or
an equivalent amount of silt fence) . Said bales shall be used
#242-640 Lot 25 Candlestick Road 5
only for the control of emergency erosion problems, and shall not
be used for the normal control of erosion.
23 . A proper bond or a deposit of money running to the Town of
North Andover shall be provided in the amount of $3,000 which
shall be in all respects satisfactory to Town Counsel, Town
Treasurer, and the NACC, and shall be posted with the North
Andover Town Treasurer beforecommencementof work. Said bond or
deposit of money shall be conditioned on the completion of all
conditions hereof, shall be signed by a party or parties
satisfactory to the NACC, and Town Counsel, and shall be released
after completion of the project, provided that provision,
satisfactory to the NACC, has been made for performance of any
conditions which are of continuing nature. The applicant may
propose a bond release schedule keyed to completion of specific
portions of the project for the NACC's review and approval. This
condition is issued under the authority of the local Bylaw.
DURING CONSTRUCTION
24. Upon beginning work, the applicant shall submit written
progress reports every three (3) months detailing what work has
been done in or near resource areas, and what work is anticipated
to be done over the next period. This will update the
construction sequence.
25. Any fill used in connection with this project shall be clean
fill, containing no trash, refuse rubbish or debris, including
but not limited to lumber, bricks, plaster, wire, lath, paper,
cardboard, pipe, tires, ashes, refrigerators, motor vehicles or
parts of any of the foregoing.
26. No exposed area shall remain unfinished for more than thirty
(30) days, unless approved by the NACC.
27. No regrading in the buffer zone shall have a slope steeper
than 2: 1 (horizontal:vertical) . Slopes of steeper grade shall be
rip-rapped to provide permanent stabilization.
28. There shall be no stockpiling of soil or other materials
within twenty-five (25) feet of any resource area.
29. Washings from concrete trucks, or surplus concrete, shall not
be directed to, any drainage system or wetland resource area.
30. All waste generated by, or associated with, the construction
activity shall be contained within the construction area, and
away from any wetland resource area. There shall be no burying
of spent construction materials or disposal of waste on the site
by any other means. The applicant shall maintain dumpsters (or
other suitable means) at the site for the storage and removal of
#242-640 Lot 25 Candlestick Road 6
such spent construction materials off-site.
31. Accepted engineering and construction standards and
procedures shall be followed in the completion of the project.
32. Members of the NACC or its agent shall have the right to
enter upon andinspectthe premises to evaluate and/or effect
compliance with this Order of Conditions. The NACC reserves the
right to require, following field inspection, additional
information or resource protection measures.
33. During and after work on this project, there shall be no
discharge or spillage of fuel, or other pollutants into
any wetland resource area. If there is a spill or discharge of
any pollutant during any phase of construction the NACC shall be
notified by the applicant within one (1) business day. No
construction vehicles are to be stored within 100 feet of wetland
resource areas, and no vehicle refueling, equipment lubrication,
or maintenance is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
34. No underground storage of fuel oils shall be allowed on any
lot within one-hundred (100) feet of any wetland resource area.
This Condition shall survive this Order of Conditions, and shall
run with the title of the property. This condition is issued
under the authority of the Town's Wetland Protection ByLaw.
35. Fertilizers utilized for landscaping and lawn care shall be
organic and low-nitrogen content, and shall be used in
moderation. Pesticides and herbicides shall not be used within
100 feet of a wetland resource area. This condition is issued
under the authority of the Town's Wetland Protection ByLaw.
36. Upon completion of construction and grading, all disturbed
areas located outside resource areas shall be stabilized
permanently against erosion. This shall be done either by
loaming and seeding according to SCS standards. If the latter
course is chosen, stabilization will be considered complete once
vegetative cover has been achieved.
37. Upon completion of the project, the applicant shall submit a
letter to the NACC from a Registered Professional Civil Engineer
or Land Surveyor certifying compliance with this Order of
Conditions and the approved plans referenced herein (or approved
revisions) . A stamped "As-Built" topographic plan of all areas
within the jurisdiction of the Wetlands Protection Act and Bylaw
shall be submitted when a Certificate of Compliance is requested.
This plan will include:
a. "As-Built" elevations of all drainage structures
constructed within 100 feet of any wetland.
#242-640 Lot 25 Candlestick Road 7
b. Distances from structures to wetlands.
c. A line showing the limit of work. "Work" includes
any disturbance of soils or vegetation.
38. The following special conditions shall survive the issuance
of a Certificate of Compliance for this project:
14. Maintenance of catch basins.
33. Discharge or spillage of pollutants.
34. Prohibition of storage of fuels underground.
35. Limitations on the use of fertilizers, herbicides
and pesticides.
Issued By North Andover Conservation Commission
�.
Signature(s)
AU
f� K
This Order must be signed by a majority of the Conservation Commission.
On this 24 day of 19�.� before me
personally appeared , to me known to be the
person described in and who executed the foregoing instrument and acknowledged that he.she executed
the same as his/her free act and deed.
. s
Notary Public My commission expires
The=Jicant.the owner,any person aggrieved by this Order,any owner of land abutting the land upon which the proposed work is to be
done.or any ten residents of the city or town in which such land is located.are hereby notified of their right to reouest the Department of
Environmental Protection to issue a Superseding Order,providing the request is made by certified mail or hand delivery to the Department.
with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7),within ten days from the date of issuance of this
Determination.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission
and the applicant.
If you wish to appeal this decision under the Town Bylaw, a complaint
must be filed in Superior Court.
Detach on dotted line and submit to the North Andover Conservation Comm, prior to commencement of work.
..................................................................................................................................................................................................................
NORTH ANDOVER CONSERVATION COMMISSION
To !slung Autnonty
Please be advised that the Order of Conditions for the protect at Lot 25 Candlestick Road
Pfie Number 242— 640 has been recorded at trte Registry of Deeds, North Essex ana
has been noted in the chain of tale of the atfectea property in accordance with General Condition 8 on 19
If recorded land. theinstrument number wntcrl identifies trus ttansactton is
If registered land, the document number which identifies this transaction is
S:cnawre AcDucan+
5-aA