HomeMy WebLinkAboutMiscellaneous - 506 BOSTON STREET Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 242-1448
Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the James E. Murphy
computer, use Name
only the tab
key to move 506 Boston Street
your cursor- Mailing Address
do not use the North Andover MA 01845
return key. City/Town State Zip Code
Q 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
James E. Murphy
Name
February 18, 2009 242-1448
Dated DEP File Number
3. The project site is located at:
506 Boston Street North Andover
Street Address City/Town
Map 107D Parcel 79
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for.
Property Owner(if different)
Essex North 11516 1
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent, on:
11/30/09
Date
B. Certification
Check all that apply:
® Complete Certification:It is hereby certified that the work regulated by the above-referenced
Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the
above-referenced Order of Conditions have been satisfactorily completed.The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
wpaform Bb.doc-rev.7/13/04 Page 1 of 4
* R
ILI) Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 242-1448
Provided by DEP
B. Certification (cont:)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced
Order of
Conditions never commenced. The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
Ongoing Conditions:The following conditions of the Order shall continue: (Include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
68
C. Authorization
Issued by:
North Andover 1611-3169
Conservation Commission Date 6flss ance
This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the
applicant and appropri P egional Office(See Attachment).
Signatures:
/
wpaform 8b.doc-rev.7/13/04 Page 2 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number_
WPA Form 8B - Certificate of Compliance LI
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 242-1448
Provided by DEP
C. Authorization (cont.)
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex North
On thisOf Day Month � '�s 00!7th Year
before me, the undersigned Notary Public, personally appeared
John Mabon,
Name of Document Signer
I
proved to me through satisfactory evidence of identification, which was/were
Massachusetts License
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As member of North Andover
City/Town Conservation Commission
DONNA K WEDGE Si nature of Notary Public
rxOF�r►s �.� 61 L21 6
My0orrm.E*mJtdy15.2018 Printed Name of Notary Public
My co6missio Expires(Date)
Place notary seal and/or any stamp aboveJ' '
Sig ature of Notary Public
wpaform Bb.doc•rev.7/13/04
Page 3 of 4.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number.
WPA Form 8B - Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 242-1448
Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
506 Boston Street 242-1448
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
Essex North
County
for:
James E. Murphy
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpaform 8b.doc•rev.7/13/04 Page of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection-Wetlands
DEP Regional Addresses
Massachusetts Wetlands Protection Act M.G.L. c 131, §40
Mail transmittal forms and DEP payments,payable to:
Commonwealth of Massachusetts
Department of Environmental Protection
Box 4062
Boston, MA 02211
DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tyringham
436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales
Alford Cummington Hatfield Monterey Richmond Ware
Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick
Springfield,MA 01103 Ashfield Deerfield Heath Monson Russell Washington
Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell
Belchertown East Longmeadow Holland New Ashford Savoy Westfield
Fax:413-784-1149 Bemardston Egremont Holyoke New Marlborough Sheffield Westhampton
Blandford Erving Huntington New Salem Shelburne West Springfield
Brimfield Florida Lanesborough North Adams Shutesbury West Stockbridge
Buckland Gill Lee Northampton Southampton Whately
Charlemont Goshen Lenox Northfield South Hadley Wilbraham
Cheshire Granby Leverett Orange Southwick Williamsburg
Chester Granville Leyden Otis Springfield Williamstown
Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor
Chicopee Greenfield Ludlow Pelham Sunderland Worthington
Clarksburg Hadley, Middlefield Peru Tolland
DEP Central Region Acton Chariton Hopkinton Millbury Rutland Uxbridge
627 Main Street Ashbumham Clinton Hubbardston Mifiville Shirley Warren
Ashby Douglas Hudson New Braintree Shrewsbury Webster
Worcester,MA 01608 Athol Dudley Holliston Northborough Southborough Westborough
Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West Boylston
Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield
Barre Fitchburg Leominster _Oakham Sterling Westford
TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster
Berlin Grafton Lunenburg PaxtonSturbridge Winchendon
Blackstone Groton Marlborough Pepperell Sutton Worcester
Bolton Harvard Maynard Petersham Templeton
Boxborougn Hardwick Medway Phillipston Townsend
Boylston Holden Mendon Princeton Tyngsborough
Brookfield Hopedale Milford Royalston Upton
DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provincetown Tisbury
20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro
Attleboro Dighton Gosnold Nantucket Rehoboth Wareham
Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester Welifieet
Phone:508-946-2700 Barnstable Eastham Hanover North Attleborough Rockland West Bridgewater
Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport
Bourne Easton Harwich Norwell Scituate' West Tisbury
TDD:508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman
Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham
Brockton Fall River Mansfield Pembroke Somerset Yarmouth
Carver Falmouth Marion Plainville Stoughton
Chatham Foxborough Marshfield Plymouth Swansea
Chilmark Franklin Mashpee Plympton Taunton
DEP Northeast Region Amesbury Chelmsford Hingham Merrimac
g 9 Quincy Wakefield
1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole
Arlington Cohasset Hutt Middleton Reading Waltham
Boston,MA 02108 Ashland Concord Ipswich Millis Revere Watertown
Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland
Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley Wellesley
Beverly Dover Lincoln Natick Salem Wenham
TDD:617-574-6868 Billerica Dracut Lowell Needham Salisbury West Newbury
Boston Essex Lynn Newbury Saugus Weston
Boxford Everett Lynnfield Newburyport Sherbom Westwood
Braintree Framingham Malden Newton Somerville Weymouth
Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington
Burlington Gloucester Marblehead North Andover Sudbury Winchester
Cambridge Groveland Medfield North Reading Swampscott Winthrop
Canton Hamilton Medford Norwood Tewksbury Woburn
Carlisle Haverhill Melrose Peabody Topsfield
wpaform8b.doc•DEP Addresses•rev.11/19/09
Page 1 of 1
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
i
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: North Andover
When filling t• From: Conservation Commission
out forms on
the computer, 2. This issuance is for(check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3. To: Applicant:
move your
cursor-do not James E. Murphy
use the return a. First Name b.Last Name
key.
c.Organization
Q 506 Boston Street
d.Mailing Address
North Andover MA 01845
e.City/Town f.State g.Zip Code
4. Property Owner(if different from applicant):
a.First Name b.Last Name
c.Organization
d.Mailing Address
e.Cit Town f.State g.Zip Code
5. Project Location:
506 Boston Street North Andover
a.Street Address b.Cityfrown
Map 107D Parcel 79
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known: e.Latitude - f.Longitude
6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex North
a.County b.Certificate Number(if registered land)
1271 779
c.Book d.Page
7. Dates:
12/23/08
2/11/09 2/18/09
a. Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
8. Final Approved Plans and Other Documents(attach additional plan or document references as
needed):
Sanitary Disposal System upgrade Plan
a.Plan Title
The Neve-Morin Group, Inc. John M. Morin, P. E.
b.Prepared By c.Signed and Stamped by
12/10/08, revised 1/21/09, revised 1/22/09 1" = 10'
d.Final Revision Date e.Scale
f.Additional Plan or Document Title g.Date'
wpaform5.doc• rev.5/08 Page 1 of 11
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
1. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply- h. ® Storm Damage Prevention i. Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above,the following General Conditions, and any
other special conditions attached to this Order. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standardsset forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
s. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary (if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet
5. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under Waterbodies a.square feet b.square feet c.square feet d.square feet
and Waterways
e.cly dredged f.cly dredged
wpaform5.doc• rev.5/08 Page 2 of 11
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings cont.
9 (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. ❑ Bordering Land
Subject to Flooding a'.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g,cubic feet h.cubic feet
a. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9. ❑ Rlverfront area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-200 ft
g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
10. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
11. ❑ Land Under the Ocean a.square feet b.square feet
c.cty dredged d.c/y dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet c.cty nourishmt. d.c/y nourishmt.
14. ❑ Coastal Dunes a.square feet b.square feet c.cty nourishmt d.e/y nourishmt.
15. ❑ Coastal Banks a.linear feet b.linear feet
16. ❑ Rocky Intertidal Shores a.square feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt Ponds a.square feet b.square feet
c.cty dredged d.c/y dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cty dredged b.Gy dredged
21. ❑ Land Subject to Coastal
Storm Flowage a.square feet b.square feet
wpaform5.doc• rev.5/08 Page 3 of 11
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related.statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state,or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance.1f this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. ;
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertakenuntil the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title
of the affected property. In the case of recorded land,the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, °MassDEP"I
"File Number
242-1448
wpaform5.doc• rev.5/08 Page 4 of 11
I
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A) to the ConservationCommission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and
the Department of Environmental
o ental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the property
subject to this Order and to any contractor or other person performing work conditioned by this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging, Once in place,the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
18. The work associated with this Order(the"Project") is (1)❑ is not(2)®subject to the
Massachusetts Stormwater Standards. If the work is subject to the Stormwater Standards,
then the project is subject to the following conditions:
a) All work, including site preparation,land disturbance, construction and redevelopment, shall be
implemented in accordance with the construction period pollution prevention and erosion and
sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the
National Pollution Discharge Elimination System Construction General Permit as required by
Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures
and best management practices(BMPs) shall remain in place until the site is fully stabilized.
I
j wpaform5.doc• rev.5/08 Page,5 of 11
Imo— —
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and
until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain specified in
the Certification. For any construction period BMPs intended to be converted to post construction
operation for stormwater attenuation, recharge, andior treatment,the conversion is allowed by the
MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or
prepared for post construction operation, including removal of all construction period sediment trapped
in inlet and outlet control structures;
ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per the
requirements of Stormwater Standard 10;
iv, all post-construction stormwater BMPs are installed in accordance with the plans (including all
planting plans) approved by the issuing authority, and have been inspected to ensure that they are not
damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified that
another party has legally assumed responsibility for BMP maintenance. Prior to requesting a
Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in
General Condition 18(e))shall execute and submit to the issuing authority an Operation and
Maintenance Compliance Statement("O&M Statement)for the Stormwater BMPs identifying the party
responsible for implementing the stormwater BMPsOperation and Maintenance Plan ("O&M Plan")
and certifying the following: i.)the O&M Plan is complete and will be implemented upon receipt of the
Certificate of Compliance, and ii.)the futurb responsible parties shall be notified in writing of their
ongoing legal responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in accordance
with the long-term pollution prevention plan section of the approved Stormwater Report and, if
applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge
Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage
easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the
landowner of the property must submit to the issuing authority a legally binding agreement of record,
and acceptable to the issuing authority, evidencing that another entity has accepted responsibility for
maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for
purposes of implementing the requirements of Conditions 18(f)through 18(k)with respect to that
BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f)
through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of
Compliance. In the case of stormwater BMPs that are serving more than one lot,the legally binding
agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and
easement deed that grants the responsible party access to perform the required operation and
maintenance must be submitted along with the legally binding agreement.
0 The responsible party shall operate and maintain all stormwater BMPs in accordance with the
design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook.
wpaform5.doc• rev.5108 Page 6 of 11
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three(3) consecutive calendar years
of inspections, repairs, maintenance and/or replacement of the stormwater management
system or any part thereof, and disposal (for disposal the log shall indicate the type of material
and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation Commission
("Commission")upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site
to evaluate and ensure that the responsible party is in compliance with the requirements for
each BMP established in the O&M Plan approved by the issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in
accordance with all applicable federal, state,and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are
prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be changed
without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design
Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact
Development Site Design Credits)shallnotbe altered without the prior written approval of the issuing
authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing
constructed around stormwater BMPs shall include access gates and shall be at least six inches
above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text document):
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The North Andover hereby finds(check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
1. Municipal Ordinance or Bylaw 2.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a,final
Order of Conditions is issued.
wpaform5.doc- rev.5/08 Page 7 of 11
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance (cont.)
b. ® that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
North Andover Wetlands Protection Bylaw Chapter 178
1.Municipal Ordinance or Bylaw 2.Citation -
s. The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows(if you need more space
for additional conditions, attach a text document):
See attached
wP aform5.doc
rev.5108
Page 8 of 11
DEP FILE #242 - 1448
Therefore, the North Andover Conservation Commission (hereafter the"NACU) hereby
finds that the following conditions are necessary,in accordance with the Performance
Standards set forth in the State Regulations, the local ByLaw and Regulations,toP rotect
those interests noted above. The NACC orders that all work shall be performed in
accordance with said conditions and with the Notice of Intent referenced below. To the
extent that the following conditions modify or differ from the plans, specifications or other
proposals submitted with the Notice of Intent, the conditions shall control
M
RAL CONDITIONS
18. The proposed work includes:replacement of a failed septic system. Proposed work
within 100 foot buffer zone to Bordering Vegetated Wetland (BVV) includes the
installation of a septic tank,portion of a pump chamber and proposed grading for the
leach field. The proposed leach field (chamber trench system) is located more than 100
feet from wetland resource areas.
19. The work shall conform to the following(except as noted in the remainder of this
document where revisions may be required):
Notice of Intent filed by: Greg Hochmuth
The Neve-Morin Group, Inc.
447 Boston Street
Topsfield, MA 01983
Site Plans prepared by: The Neve-Morin Group,Inc:
447 Boston Street
Topsfield, MA 01983
Dated 12/10/2008 and Revised 1/21/09, and 1/22/09 (Plan of
Record)
Report prepared by: Greg Hochmuth
The Neve-Morin Group, Inc.
447 Boston Street
Topsfield,MA 01983
20. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be notified
in writing within 30 days of all transfers of title of any portion of property that takes place
prior to the issuance of a Certificate of Compliance.
242-1448,506 Boston.doc 1 NACC 1/28/2009
DEP FILE #242 - 1448
21. The conditions of this decision shall apply to and be binding upon,the applicant,owner,
its employees and all successors and assigns in interest or control These obligations shall
be expressed in covenants in all deeds to succeeding owners of portions of the property.
22. Failure to comply with all conditions stated herein,and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
23. This Order does not grant any property rights or any exclusive privileges;it does not
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Environmental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued,to evaluate compliance with this Order of Conditions,
the Act (310 CMR 10.00), the North Andover Wetland Bylaw and Regulations, and may
require any information, measurements, photographs, observations, and/or materials, or
may require the submittal of any data or information deemed necessary by the NACC for
that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP
determines that any of the work is not in compliance with this Order of Conditions.
Work shall not resume until the NACC is satisfied that the work will comply and has so
notified the applicant in writing.
24. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances,by-laws or
regulations.
25. The work authorized hereunder shall be completed within three years from the date of
this order.
26. This Order may be extended by the issuing authority for one but not more than two
periods of up to one year each upon application to the issuing authority at least thirty
days (30) prior to the expiration date of the Order (Refer to Section VIII (B)(p.33) of the
North Andover Wetland Regulations).
27. The NACC reserves the right to amend this Order of Conditions after a legally advertised
public hearing if plans or circumstances are changed or if new conditions or information
so warrant.
28. Where the Department of Environmental Protection(DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission shall be a
party to all agency proceedings and hearings before the Department.
29. The following wetland resource areas are affected by the proposed work: Buffer Zone to
Bordering Vegetated Wetland (BVW). These resource areas are significant to the interests
of the Act and Town Bylaw as noted above and therein. The applicant has not attempted
to overcome the presumption of significance of these resource areas to the identified
interests.
242-1448,506 Boston.doc 2 NACC 1/28/2009
DEP FILE#242 - 1448
30. The NACC agrees with the applicant's delineation of the wetland resource area (W103-
W11) on the site as shown on the plans dated 1/22/09 and referenced herein. Additional
resource areas exist on the property but were not delineated for the purposes of this
project.
31. The NACC finds that the intensive use of the upland areas and buffer zone proposed on
this site will cause further alteration of the wetland resource areas. In order to prevent
any alteration of wetland resource areas a twenty five foot 25`)No-Disturbance Zone and
a fiftyfot (50') No-Construction Zone shall be established from the edge of the adjacent
wetland resource area except where these zones were previously maintained as mowed
lawn as shown on the herein referenced plans. The Conservation Administrator and/or
other agents of the NACC do not have the authority to waive these setbacks as
established under the local bylaw. No disturbance of existing grade, soils or vegetation is
permitted in the No-Disturbance zone.
32. This document shall be included in all construction contracts,subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors, and
other personnel performing the permitting work are fully aware of the permits terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order resulting from failure to comply with its conditions.
33. The owners of the project and their successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed drainage system
and that said Town shall not be liable for any damage in the event of failure. By
acceptance of this Order, the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on this property
pursuant to the Order. Issuance of these Conditions does not in any way imply or certify
that the site or downstream areas will not be subject to flooding, storm damage or any
other form of water damage. Maintenance of the drainage system, if accepted by the
Town as part of a public way,becomes the responsibility of the Town.
34. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding,storm damage or any other form of
water damage.
PRIOR TO CONSTRUCTION
35. No work shall be undertaken until all administrative appeal periods from this Order have
elapsed or, if such an appeal has been filed, until all,proceedings before the Department
or Court have been completed.
242-1448,1 48 506 B
oston.d c
0
> 3
NACC 1/28/2009
DEP FILE #242 - 1448
36. This Order shall be recorded by the applicant at the Registry of Deeds immediately after
the expiration of all appeal periods. No work shall be undertaken until the Final Order
has been recorded in the Registry of Deeds or the Land Court for the district in which the
land is located, within the chain of title of the affected property. In the case of recorded
land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done. In the case of
registered land, the Final Order shall also be noted on the Land Court Certificate of Title
of the owner of the land upon which the proposed work is to be done. The recording
information shall be submitted to the North Andover Conservation Commission on the
form at the end of this Order prior to commencement of the work. Any Order not
recorded by the applicant before work commences may be recorded by the NACC at the
applicant's expense.
37. A sign shall be displayed at the site not less than two square feet or more than three
square feet in size bearing the words "Massachusetts DEP, File Number 242-1448.
38. Any changes in the submitted plans caused by the applicant,another Board's decision or
resulting from this Order of Conditions must be submitted to the NACC for approval
prior to implementation. If the NACC finds said changes to be significant,the NACC will
call for another public hearing(at the expense of the applicant)..Within 21 days of the
close of said public hearing the NACC will issue an amended or new Order of Conditions.
Any errors found in the plans or information submitted by the applicant shall be
considered as changes. No work shall begin on a project until written approval has been
granted by the NACC.
39. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
40. Prior to any work commencing on-site, the applicant shall submit to the NACC for
approval,a detailed sequence of construction,including the installation of
sedimentation/erosion control devices to be completed before other work begins on-site.
41. Wetland flagging shall be checked prior to start of construction and shall be re-established
where missing. All wetland flagging shall remain visible and enumerated per the
approved plan(s) throughout the life of the project and until a Certificate of Compliance is
issued so that erosion control measures can be properly placed and wetland impacts can
be monitored. The proposed limit of work shall be shall be clearly marked with erosion
controls or temporary fencing and shall be confirmed by the NACC. Such barriers shall
be checked and replaced as necessary and shall be maintaineduntil all construction is
complete. Workers should be informed that no use of machinery, storage of machinery or
materials,stockpiling of soil,or construction activityis to occur beyond this line at an
Y Y
time.
242-1448,506 Boston.doc 4 NACC 1/28/2009
DEP FILE #242 - 1448
42. A row of staked hay bales backed by trenched siltation fence shall be placed between all
construction areas and wetlands. The erosion control barrier will be properly installed
and placed as shown on the plans approved and referenced herein. Erosion controls shall
be inspected and approved by the NACC or its agent prior to the start of construction and
shall remain intact until all disturbed areas have been permanently stabilized to prevent
erosion. All erosion prevention and sedimentation protection measures found necessary
during construction shall be implemented at the direction of the NACC or its agent. The
NACC reserves the right to impose additional conditions on portions of this project to
mitigate any impacts which could result from site erosion, or any noticeable degradation
of surface water quality discharging from the site. For example, installation of erosion
control measures may be required in areas not shown on the plan(s) referenced in this
Order of Conditions. Should such installation be required by the NACC,they shall be
installed within 48 hours of the Commission's request.
43. The applicant shall have on hand at the start of any soil disturbance,removal or
stockpiling, a minimum of 8 hay bales and sufficient stakes for staking these bales (or an
equivalent amount of silt fence, 1 hay bale to equal 3 feet of fence). Said bales shall be
used only for the control of emergency erosion problems and shall not be used for the
normal control of erosion.
44. A check payable to the Town of North Andover shall be provided in the amount of$1,000
which shall be in all respects satisfactory to Town Counsel,Town Treasurer, and the
NACC, and shall be posted with the North Andover Town Treasurer through the NACC
before commencement of work. Said deposit of money shall be conditioned on the
completion of all conditions hereof,shall be signed by a party or parties satisfactory to the
NACC, and Town Counsel, and shall be released after completion of the project, provided
that provisions, satisfactory to the NACC,have been made for performance of any
conditions which are of continuing nature. The applicant may propose a monetary
release schedule keyed to completion of specific portions of the project for the NACC's
review and approval. This condition is issued under the authority of the local ByLaw.
45. The applicant shall be responsible for placing signs on each parcel,where there is more
than one (1) lot, designating the applicable lot number as depicted on the plans approved
and referenced herein.
46. The applicant shall designate a Wetland Scientist(or other environmental professional as
approved by the NACC or its agent) as an "Erosion Control Monitor' to oversee any
emergency placement of controls and regular inspection or replacement of sedimentation
control devices. The name and phone number of the erosion control monitor must be
provided to the NACC in the event that this person has to be contacted, due to an
emergency at the site, during any 24-hour period,including weekends. The
Environmental Professional will immediately notify the Conservation agent of any matter
that requires res attentio
n by the Commission or the
agent.
242-1448,506 Boston.doc 5 NACC 1/28/2009
DEP FILE #242 - 1448
47. The erosion control monitor will be required to inspect all sedimentation control devices
and oversee cleaning and the proper disposal of waste products. Cleaning shall include
removal of any entrapped silt. At least once during each week in which construction
activities occurs on-site and for as long thereafter as ground remains unstabilized, the
applicant shall submit a written report from the "Erosion Control Monitor" to the NACC
certifying that, to the best of his/her knowledge and belief based on a careful site
inspection, all work is being performed in compliance'with this Order of Conditions and
that approved setbacks are being adhered to. Additional inspections shall be conducted
during/following 24-hour rain events of 1/2" or more. The erosion control monitor must
visually inspect all sedimentation/erosion control measures and assume responsibility for
their maintenance on a weekly basis and that they are functioning as intended. In
addition,all wetland resource areas must be visually inspected for siltation, turbidity,
and/or other water quality impacts.
48. Prior to construction, the applicant shall permanently mark the edge of the"25' No-
Disturbance Zone" or the edge of tree line (where the 25-foot zone is within existing yard)
with a minimum of eight (8) signs or markers spaced evenly every 30 feet to the east and
west of the driveway (alternating every 30 feet where resources are on opposite sides of
the existing drive) incorporating the following text: "Protected Wetland Resource Area'.
This will designate their sensitivity and assure no further inadvertent encroachment into
the wetland. These permanent markers are subject to review and approval by the NACC.
The applicant shall instruct all agents to explain these markers to
buyers/lessees/landscapers and all persons taking over the property from the applicant.
These markers shall remain posted and be replaced as necessary in perpetuity.
49. The applicant and/or the legal owner of that portion of land upon which these Orders of
Conditions have been placed shall provide to the NACC prior to transferring, or
assigning any portion of said land to another party,subject to said Orders of Conditions,
the "Compliance Certification Form Affidavit" attached via"Appendix A" signed under
the pains and penalties of perjury,stating that said applicant and/or owner has read
these Orders of Conditions and is in compliance with each and every condition. This
document shall apply to each of the conditions referenced herein and shall be provided to
the Conservation Department at least five(5)business days prior to the closing of said
land transaction.
50. Once these above mentioned pre-construction requirements are complete, the applicant
shall contact the Conservation Office prior to site preparation or construction and shall
arrange an on-site conference with an NACC representative, the contractor, the engineer,
wetland scientist and the applicant to ensure that all of the Conditions of this Order are
understood. This Order shall be included in all construction contracts,subcontracts,and
specifications dealing with the work proposed and shall supersede any conflicting
Ili contract requirements. The applicant shall assure that all contractors, subcontractors and
other personnel performing the permitted work are fully aware of the permit's terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order of Conditions resulting from failure to comply with its conditions. The applicant or
242-1448,506 Boston.doc 6 NACC 1/28/2009
i
DEP FILE #242 - 1448
contractor shall notify the NACC in writing of the identity of the on-site construction
supervisor hired to coordinate construction and to ensure compliance with this Order. A
reasonable period of time shall be
P provided as notice`of the re-construction
p p , meeting(e.g.
72 hours).
STORMWATER MANAGEMENT CONDITIONS
51. There shall be no increase in the post development discharges from the storm drainage
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this Order of Conditions,unless specifically approved in writing by the
Commission.
52. Water quality in down gradient BVW's shall not differ significantly following completion
of the project from the pre-development conditions. There shall be no sedimentation into
wetlands or water bodies from discharge pipes or surface runoff leaving the site.
DURING CONSTRUCTION
53. Upon beginning work, the applicant shall submit written progress reports weekly (as
part of the erosion control monitoring report Condition#47 above) detailing what work
has been done in or near resource areas, and what work is anticipated to be done over the
next period. This will update the construction sequence.
54. De-watering activities are not approved as part of this Order of Conditions. No
discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands
Protection Act and/or the North Andover Wetland Bylaw. If emergency de-watering
requirements arise, the applicant shall submit a contingency plan to the Commission for
approval,which provides for the pumpedwater to be contained in a settling basin, to
reduce turbidity prior to discharge into a resource area. De-watering activities shall be
supervised and witnessed by the designated erosion control monitor. This designee must
be on-site while work requiring de-watering is occurring until it is complete.
55. Any fill used in connection with this project shall be clean fill,containing no trash, refuse,
rubbish or debris, including but not limited to lumber,bricks,plaster,wire, lath, paper,
cardboard, pipe, tires, ashes,refrigerators, motor vehicles or parts on any of the
foregoing.
56. No exposed area shall remain unfinished for more than thirty (30) days,unless approved
b the NACC. Disturbed areas shall b
Y e loarned and.seeded
b November 1 each e year.
� Y Y
Areas that are not stabilized prior to the end of the growing season shall be
mulched/matted as appropriate until stabilization with loam and seed can be established.
242-
1448 506 B
oston.doc 7 NACC 1f28f2009
i
DEP FILE #242 - 1448
57. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical).
Slopes of steeper grade shall be rip-rapped,to provide permanent stabilization.
58. There shall be no stockpiling of soil or other materials within the 100 foot buffer zone to
BVW. All stockpiled materials shall be located in the location designated on the approved
plans.
59. The existing driveway,which will also serve as the construction access for the project,
shall be swept daily to remove sediment deposited by construction vehicles accessing the
site.
60. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage
system, or wetland resource area.
61. All waste generated by, or associated with,the construction activity shall be contained_
within the limit of work, and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain duinpsters (or other suitable means) at the site for
the storage and removal of such spent construction materials off-site. However, no trash
dumpsters will be allowed within 50'of areas subject to protection under the Act or local
ByLaw.
62. Accepted engineering and construction standards and procedures shall be followed in the
completion of the project.
63. During and after work on this project, there shall be no discharge or spillage of fuel, or
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the applicant
within one (1) business day. No construction vehicles are to be stored within 100 feet of
wetland resource areas, and no vehicle refueling,equipment lubrication, or maintenance
is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
-M - __M J
64. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100)
feet of any wetland resource area. This condition shall survive this Order of Conditions
and shall run with the title of the property. This condition is issued under the authority
of the Town's Wetland protection ByLaw,
65. Fertilizers utilized for landscaping and lawn care shall be slow release,low-nitrogen types
(< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides
shall not be used within 100 feet of a wetland resource area. This condition shall survive
this Order of Conditions and shall run with the title of the property. This condition is
242-1448,506 Boston.doc 8 NACC 1/28/2009
DEP FILE #242 - 1448
issued under the authority of the Town's Wetland Protection ByLaw and shall remain:in
perpetuity.
66. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion This shall be done by
loaming and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved.
67. Upon approved site stabilizationby Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
68. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A- "'Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address'of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/trustor corporation to whom the
compliance is to be granted.
f. The street address and assessors map/parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer(and/or
Registered Professional Land Surveyor)of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission.
i. An"As-Built" plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor)of the
Commonwealth, for the public record. This plan will include:
➢ "As-Built" post-development elevations of all drainage&stormwater
management structures constructed within 100 feet of any wetland resource
area. NOTE: If portions of the stormwater systems exist partially within the
Buffer Zone than the entire structure must be depicted to accurately verify
compliance.
➢ "As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local Wetland Protection Bylaw.
➢ Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems,additions,fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
242-1448,506 Boston.doc 9 NACC 1/28/2009
DEP FILE #242 - 1448
➢ A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes any disturbance of soils or vegetation.
➢ Location of all subsurface utilities entering the property.
68. The following special conditions shall survive the issuance of a Certificate of Compliance
(COC) for this project:
➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be
established from the edge of adjacent wetland resource areas except in those
locations approved under DEP#2421447. Future work within 100' of
existing wetland resource areas will require a separate filing with the NACC
(refer to Section XI (page 18) of the Regulations for performance standards
within these zones) The Conservation Administrator and/or other agents of
the NACC do not have the authority to waive these setbacks as established
under the local ByLaw;
➢ Resource Area Markers (Condition#48);
➢ Discharge or spillage of pollutants (Condition#63);
➢ Prohibition of underground fuels(Condition#64)
➢ Limitations on the use of fertilizers,herbicides,and pesticides (Conditions
#65).
242-1448,506 Boston.doc 10 NACC 1/28/2009
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years,unless otherwise specified as a special
condition pursuant to General Conditions#4, from the date of issuance. 1.Date of Issuance
Please indicate the number of members who will sign this form: 5
This Order must be signed by a majority of the Conservation Commission. 2. Number of signers
The Order must be mailedby certified mail (return receipt requested)or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property o different
from applicant.
Signatures:
. ✓' '� '+SII� 1.�"` ^ {�
I
Notary Acknowledgement
Commonwealth of Massachusetts County of �� �02f�i
On this f� of k -P4Oq
Day Month Year
Before me, the undersigned Notary Public, Jot?A) /VA 104,11
personally appeared Name of Document signer
proved to me through satisfactory evidence of identification,which was/were
Massachusetts License
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and;acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of North Andover Conservation Commission
City/Town
----------
Z
M WEDGE Byl�UG
i NOTARY F't,3L."
coy rcNwEALPI o t.", ' "ETTs i ignature of Notary Public
My Comm.Expires Aub.r,2009 j ti
Vii/inntted N me OT Notary Public
Place notary seal and/or any stamp aboveV/';P4T9
my Co(hmisafon Expire (Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on E2/by certified mail, return receipt requested, on
-?..bd o q
Date Date
wpaform5.doc• rev.5/08 Page 9 of 11
Massachusetts Department of Environmental Protection
Bureau of Resource Protection Wetlands MassDEP File Number:
WPA Form 5 — Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate MassDEP Regional'Office to issue a Superseding Order of
Conditions. The request must be made by certified mail or hand delivery to the Department,with the
appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided
in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order.A copy of the
request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission
and to the applicant, if he/she is not the appellant.Any appellants seeking to appeal the Department's
Superseding Order associated with this appeal will be required to demonstrate prior participation in the review
of this project. Previous participation in the permit proceeding means the submission of written information
to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order
or Determination, or providing written information to the Department prior to issuance of a Superseding
Order or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act(M.G.L. c. 131,§40), and is inconsistent with the wetlands regulations(310 CMR 10,00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations,the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
w aform5 c
p do rev.5/08
Page 10 of 11
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recordedin the Registry of Deeds or the Land Court for the district in
which the land is located,within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on
this page shall be submitted to the Conservation Commission'listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
506 Boston Street 242-1448
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
Essex North
County Book Page
for:
James E. Murphy
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc• rev.5/08 Page 11 of 11
DEP FILE #242 - 1448
APPENDIX A-AFFIDAVIT
Ion oath do hereby depose and state:
(authorized agent applicant and/or currentowner)'
(PLEASE CHECK AT LEAST ONE BLOCK)
1. I am the of
(position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission:
&/Or
2. 1 am the of,
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File#) and every condition which has been set forth
in said Order of Conditions.
4. I hereby affirm and acknowledge that on this day of 19
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance.
(DEP File#)
5. I hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP File#)
Signed under the pains and penalties of perjury this day of 19
(Signature authorized agent of applicant or owner)
242-1448,506 Boston.doc 11 NACC 1/28/2009
Notification to Abutters Under the
Massachusetts Wetland Protection Act
In accordance with the second paragraph of Massachusetts General Laws, Chapter 131, Section 40, you are hereby
notified of the following:
A. The name of the applicant is: James E.Murphy
B. The applicant has filed a Notice of Intent with the Conservation Commission for the municipality of
North Andover
seeking permission to remove, fill, dredge or alter an Area Subject to Protection under the Wetlands
Protection Act(General Laws Chapter 131,Section 40).
C. The address of the lot where the activity is proposed: 506 Boston Street
D. Copies of the Application may be examined at: :Conservation Office—1600 Osgood Street
between the hours of 8:30am and 4:30pm on the following days of the week:
Monday-Friday For more information,call: 978-688-9530
Check One: This is the applicant representative or other(specify) Conservation
E. Copies of the Application may be obtained from either(check one)the applicant or the applicant's
representative by calling this telephone number: 978-688-9530 between the hours of 8:30am
and 4:30pm on the following days of the weeks Monday-Friday
F. Information regarding the date,time and place of the public hearing may be obtained from:
by calling this number: 978-688-9530 between the hours of 8:30am
and 4:30pm on the following days of the week: Monday-Friday
Check One: This is the applicant representative or other(specify) Conservation
NOTE: Notice of the public hearing,including its date,time and place,will be published at least five(5)days in
advance in the: Lawrence Eagle-Tribune
NOTE: Notice of the public hev-in;;-,including its date,time and place will be posted in the City or Town Hall not
less than forty-eight(48)hours in advance.
NOTE: You also my contact your local Conservation Commission or the nearest Department of Environmental
Protection Regional Office for more information about this application or the Wetlands Protection Act.
To contact DEP,call:
Central Region: (508)792-7650" Northeast Region: (978)694-3200
Southeast Region: (508)946-2800 Western Region: (413)784-1100
PUBLIC HEARING TO TAKE PLACE AT 8PM
WEDNESDAY,JANUARY 7,2008
THE SENIOR CENTER,120R MAIN STREET
NOTIFICATION TO ABUTTERS
Under the Massachusetts Wetlands Protection Act
The North Andover Wetlands Protection Bylaw
In accordance with the
Massachusetts General Laws,Chapter 131, Section 40,as amended, and
the North Andover Wetlands Protection Bylaw,(Chapter 178),you are hereby notified of the
following:
The name of the applicant is James E.Murphy
The applicant has filed a Notice of Intent with the North Andover
Conservation Commission(NACC)for the purposes of installation of a new septic tank
and portion of a pump chamber and re-gradin within 100 feet of a bordering vesetated
wetland. This work is associated with the replacement of a septic system on the property.
(project description)
at 506 Boston Street
The North Andover Conservation Commission will hold a public hearing on
WEDNESDAY,January 7,2009 at 8:00 P.M.at the Senior Center, 120R Main Street,
North Andover,MA 01845.
Copies of the Notice of Intent may be examined or obtained for a fee from:
(check all boxes that apply):
❑ Applicant at
❑ Representative at
® Conservation Department, 1600 Osgood Street,Building 20,Suite 2-36,North Andover,
MA 01845 Monday through Friday, 8:30 am.to 4:30p.m.Please call the Conservation
Department at 978.688.9530 beforehand to verify arrangements.Copies maybe available
for a fee.
Further information regarding the hearing,or the Wetlands Protection Act,may be obtained from
the Conservation Department at 978.688.9530.
NOTE: Notice of the public hearing,including its date,time,and place will be published in the
Lawrence Eagle-Tribune at least five(5)business days in prior to the public hearing
date.
NOTE:Notice of the public hearing,including its date,time,and place will be posted
in Town Hall, 120 Main Street,North Andover,MA 01845 at least 48 hours prior to
the public hearing date.
NOTE: You may also contact the Conservation Department or the Northeast Regional
Department of Environmental Protection Office for more information about this
application or the MA Wetlands Protection Act.To contact the Northeast Regional
Department of Environmental Protection Office,call 617.654.6500.
s