HomeMy WebLinkAboutMiscellaneous - 525 TURNPIKE STREET r .r Massachusetts Departn7ent of EnVif=Mental Protection
Bureau of Resource Protection- Wetlands /1,A, 242-114
WPA Form 8B - Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. 131, §40 and North Andover Wetland
Protection Bylaw.
' Project Information
1. This Certificate of Compliance is issued by: 3. The project site is located at:
NORTH ANDOVER NORTH ANDOVER
Conseriion Commission City/T-
525 Turnpike Street
To: SoMAddrm
Mark B. Johnson, Esq.
Asscssas MaplP/al t ParceULot i
Name
12 Chestnut Street
maiiing Add= and the final Order of Conditions was recorded on
Andover, MA 01810 April 6, 1981
Ci IT-1 Date
Sipe ED Code at the Registry of Deeds for
Essex Transaction #3143
2. This Certificate of Compliance is issued for work regulated c'm Book page
by a final Order of Conditions issued to:
Fellowship Bible Church Ce>nficate(fregrste�dland)
Name
April 3, 19 81 4. A site inspection was made in the presence of the applicant,
or the applicant's agent,on:
Dared
242-114 11 ((l.iZ U_(, 6L 1'
DEP File NumbT Date bU�ICA', S n 0i -e X
Certification
❑ invalid order of Conditions: It is hereby certified that
(Check all that apply): the work regulated by the above-referenced Order of
Conditions never commenced. The Order of Conditions has
XXX Complete Certification: It is hereby certified that the lapsed and is therefore no longer valid. No future work
work regulated by the above-referenced Order of Condi- subject to regulation under the Wetlands Protection Act may
tions has been satisfactorily completed. commence without filing a new Notice of Intent and
receiving a new Order of Conditions.
❑ Partial Certification: It is hereby certified that only the
following portions of the work regulated by the above- ❑ ongoing Conditions:The following conditions of the
referenced Order of Conditions have been satisfactorily Order shall continue:(Include any conditions contained in
completed.The project areas or work subject to this partial the Final Order,such as maintenance or monitoring,that
certification which have been completed and are released should continue for a longer period.)
from this Order include:
Condition Numbers:
r Masraeftsetts Department of Environmental Protection
f Bureau of Resource Protection- Wetlands 242-114
WPA Form 8B - Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. 731, §4Q and North Andover Wetland
Protection Bylaw.
Authorization
On this
24th
Issued by:
NORTH ANDOVER day of
March'.
Consffmon Commission Manch
March 24, 1999 1999
Daze of I== Year
This Certification must be signed by a majority of the before me personally appeared
conservation commission and a copy sent to the applicant Albert P. Manzi, Jr.
and appropriate DEP Regional Office(see Appendix A).
Signature(s) to me known to be the person described in and who executed
the foregoing instrument and acknowledged that he/she
executed the same as his/her free act and deed.
,Guz�u -
ftaryPoblic UQ
December 11, 2003
Mya m-s2on apk-
i %
' Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court
for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.____ ----------
To:
______^To: If recorded land,the instrument number which identifies this
transaction is
ConsarwnCommission
Please be advised that the Certificate of Compliance for the
project at
If registered land,the document number which identifies this
transaction is
€ Project Loraoon
I
Fife Number DoaowY N=bT
has been recorded at the Registry of Deeds of
SigWn ofAp#irarx
County
and has been noted in the chain of title of the affected property
on
Date
Book
r Massachusetts Department of Environmental Protection
Bureau of Resource Protection— Wetlands- 242-104
WPA Form 8B' Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. 131, §40 and North Andover Wetland
Protection Bylaw.
` Project Information
1. This Certificate of Compliance is issued by: 3. The project site is located at:
NORTH ANDOVER NORTH ANDOVER
Consraion Commission C41TO tim
525 Turnpike Street
To: SftWAddress
Mark Johnson, Esq.
Asses MaplRari Pa2eLlot f
Name
12 Chestnut Street and the final Order of Conditions was recorded on
Mailing Address
Andover, MA 01810 December 12, 1980
City/rown We
Rate Zip Cock
at the Registry of Deeds for
_
Essex 1475 251
2. This Certificate of Compliance is issued for work regulated County sock Page
by a final Order of Conditions issued to:
Cerobpre(if mgfsterzd land)
Fellowship Bible Church
Name
December 4, 1980 4. A site inspection was made in the presence of the applicant,
or the applicant's agent,on::rved
L
242-104 QUI SS
DEP file Number Date I U i Id I ni o?S no
• Certification
❑ invalid Order of Conditions: It is hereby certified that
(Check all that apply): the work regulated by the above-referenced Order of
Conditions never commenced. The Order of Conditions has
XIX Complete Certification: It is hereby certified that the lapsed and is therefore no longer valid. No future work
work regulated by the above-referenced Order of Condi- subject to regulation under the Wetlands Protection Act may
tions has been satisfactorily completed. commence without filing a new Notice of Intent and
receiving a new Order of Conditions.
❑ Partial Certification:It is hereby certified that only the
following portions of the work regulated by the above- ❑ Ongoing Conditions:The following conditions of the
referenced Order of Conditions have been satisfactorily Order shall continue:(Include any conditions contained in
completed.The project areas or work subject to this partial the Final Order,such as maintenance or monitoring,that
certification which have been completed and are released should continue for a longer period.)
from this Order include:
Condition Numbers:
i
r Massactir�seUS Department of Environmental Protection
Bureau of Resource Protection- Wetlands 242-104
. WPA Form 813 - Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. 731, §40 and North Andover Wetland
Protection Bylaw.
Authorization
On this 24th
Issued by:
NORTH ANDOVER day of March
Conserrdt MCamMssion M"h
March 24, 1999 1999
late onssuaxe yew
This Certification must be signed by a majority of the before me personally appeared
conservation commission and a copy sent to the applicant Albert P. Manzi, Jr.
and appropriate DEP Regional Office(see Appendix A).
Signature(s) to me known to be the person described in and who executed
the foregoing instrument and acknowledged that he/she
executed the same as his/her free act and deed.
Mxaypwk
December 11, 2003
W wmmimion&pi n
' Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court
for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
-------------------------- —---------
To: if recorded land,the instrument number which identifies this
transaction is
consmion cormnissw
Please be advised that the Certificate of Compliance for the
project at inslunwerxMtmber
If registered land,the document number which identifies this
transaction is
P1oJealoca�ion
File AkobT Doamar Mtmba
has been recorded at the Registry of Deeds of
StnV-&AWicwr
Courcy
and has been noted in the chain of title of the affected property
on
Date
i
Book
P
Town of North Andover ,►ORT"
OEt °u °1tip
Office of the Planning Department
Community Development and Services Division
27 Charles Street " =�•-"
North Andover,Massachusetts 01845 'sswci«isE`
Kathy McKenna Telephone(978)688-9535
Planning Director Fax(978)688-9542
N -IrcD
Notice Of Decision
Any appeal shall be filed
Within(20) days after the
Date of filing this Notice .� c
In the Office of the Town n x
Clerk
cn
Date: October 4,2002
Date of Discussion: September 10,
2002 and October 1, 2002
Pursuant to correspondence dated August 23, 2002 from Mark B. Johnson,Esquire on behalf
of Fleet Bank, the Planning Board discussed Site Plan Waiver for the construction of an ATM
kiosk within the parking lot of the existing Brooks Pharmacy site located at 525 Turnpike Street,
Assessor's Map 25, Parcel 12.
After a discussion on the above dates,the Planning Board voted to WAIVE the requirements
for Site Plan Special Permit approval. The placement of the kiosk and site work shall be in
accordance with Fleet North Andover ATM Proposed Site Plan Sheet C-3 (dated June 7,2002),
Sheet C-5 (July 15, 2002), and L-1 (July 15, 2002). The style of the building shall be in
accordance with photo simulations submitted to the Planning Board at their October 1, 2002
meeting. Other items presented in consideration of this waiver are: VAI Preliminary Traffic
Generation Memorandum dated September 10,2002.
n
Signed:
hn Simons, Chairman
Cc: Applicant Alberto Angles, Vice Chairman
DPW Richard Nardella, Clerk
Building Department Felipe Schwarz
Conservation Department George White
Health Department
ZBA
I301R.D OF,APPE;kL,4 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535