Loading...
HomeMy WebLinkAboutMiscellaneous - 637 JOHNSON STREET 310 CMR 10.99 rays ' k q t 'o Form 2 " . F'4`�• DEP file No. (ro be Drovufed by OCT) Commonwealth city,town North Andover l-' + of Massachusetts ' Avvlicanr David & Susan Lincoln ti _✓ May 17, 1992 Oalo rtnaueil FiledY #637 Johnson Street Dellprmination of Applicability Massachusetts Wetlands Protection Act, G.L. c 131 , §40 From North Andover Conserva.t•iom Commission Issuing Authority iiTo David & Susan Lincoln Same (Name of person making request) (Name of property owner) ! Address #637 Johnson St. , N. Andover, MA Address HI This determination is issued and delivered as follows: Ca by hand delivery to person making request on (date) ., by certified mail, return receipt requested on (dale) Pursuant to the authority of G.L. C. 131, §40, the North Andover Conservation (;oiijiiiIs5iUn !,,has considered your request for Determination of Applicability and its supporting documentation. and has ,•',made the following determination(check whichever is applicable): Location: Street Address #637 Johnson ISt-rept- Lot Number: 1. 0 The area described below, which includes all/part of the area described in your request, is an Area Subject to Protection Under the Act. Therefore, any removing, filling, dredging or altering of that area requires the filing of a Notice of Intent. ittlift .2; The work described below, which includes all/part of the work described in your leUuest, is ere an Area Subject to Protection Under the Act and will remove,fill, dredge or alter that area. 1 here- fore, said work requires the filing of a Notice of Intent. Effective 11/10/89 2.1 3. ❑ The work described below, which includes all,part of the work described to VOW recruesl. is within .r the Buffer Zone as defined in the regulations. and will alter an Area Subject to Iliolectlon Under the Act. Therefore,said work requires the filing of a Notice of Intent. **1. The surface of the driveway will .be composed of crusher waste or a similar material that will compact. 2. The driveway will be no wider than the present excavation. near the pond. 3. The excavation willl be no deeper than the deepest portion of the presently excavated area. This Determination is negative: 1. ❑ The area described in your request is not an Area Subject to Protection Under tyle Act. 2.. ❑ The work described in your request is within an Area Subject to Protection UtWer the Act, but will not remove, fill, dredge, or after that area. Therefore, said work does riot require the filing of a Notice of Intent. 3. jA The work described in your request is within the Buffer Zone, as detlrted in the fepufallons, but will not alter an Area Subject to Protection Under life Act.Therefore, said work does riot require the filing of a Notice of Intent. See conditions above.** 4. ❑ The area described in your request is Subject to Protection Utlder the Act, but Since the work described therein meets the requirements for the following exernptlorl.aS specilled in the Act and the regulations, no Notice of Intent is required- Issued by North Andover Collservatton Commission Signature(s) Llft P61140t, A- This Determination must be signed by a majority of the Conservation Commission. 3 day of . On this cJ��1�' 19 Z____—. b0or e me personally appeared— to file known to be the person described in, and who executed, the foregoing instrument,and acknowledued Ihat he',he executed the same as his/her free act and de d. No ary Public My commission expires This Determination does not relieve the applicant from comolyino wdh all olhei aCrilitT.blp leo-rel stale 01 local SIPIuICs.Ordinances, by-laws or regulations.This Determinal(on shall be valid for three years Corm Ine nate of Issuance The applicant,the owner,any person aggrieved by this Dorormination.any owner of fried abulimn nin land ur,r n w1ii-n the nrnnut(,d vrotP is to be done,or any ton residents of ine city or town in which such land is localyd.ote lintot)y r)olifred of Inrir 110111 1n Ir•7uW�t Ili(,Dlif)arl»rnnt of Environmental Proiocuon to Issue a Suporsoding Detorminmion of Appticabiltiy,providing Inn roourst it rliwv,tw cntulion mail or flnnd delivery to the Dopanment,with the appropriate filing too and Fro lransmilial rotrn rit prnvidnd in 310 Miff 10 Uzi;i. nim lnri nays from the data of is suanco of this Dotormmalion.A copy of Ilia roquosl shrill at Ino r-rimn liiuo tM r.nnt by cotnlind mod of 111010 ut.hvery to fill, Conservation Commission and the applicant. 2.2A 310 CMR 10.99 Form 5 ( DEP Fib NO• h 242-910 r ••�—• (to t.e txwK)M by DEPT i Commonwealth Ctty"town North Andover – S'"r— of Massachusetts David & Susan Lincoln KQ1 Order of Conditions Massachusetts Wetlands Protection Act G.L. c. 131 , §40 and under the Town of North Andover's Bylaw Chapter 3.5 From NORTH ANDOVER CONSERVATION C01•ir1ISSION 10 David & Susan Lincoln Same (Name of Applicant) (Narrre of property owner) 73 Georgetown Road Boxford, MA 01921 Same Address Address This Order is issued and delivered as follows: ❑ by hand delivery to applicant or representative on / (date) by certified mail• return receipt requested on �,L (date) 1-his project is located at 637 Johnson Street The property is recorded at the Registry of Northern r•s<px _ Book 1904 Page 30 Certificate (if registered) -- ---•..---_ The Notice of Intent for this project was filed on May 8, 1998 (dale) The public hearing was closed on May 20, 1998 (date) Findings The North Andover Conservation Commission has reviewed the above-referenced Notice Of Intent and plans and has held a public hearing an the project. Based on the information-avatlaole tc Ute NACC at this time, the AL.G has delern,nted thrtt lt the area on which the proposed work is to be done is significant to the following interests in accoroance v.ith the Presumptions of Significa ce }}o in the re utatrons for each Area Subject to Protection Under ► to . s1�8 Recreation A t (check as appropriate): Ch.178: Prevention of Erosion & Sedimentation Ch.178Wildlife Pub6o water supply Flood control 0 Lind containing sh hist' Private water supply Storm damage prevention Fisheries Ground water supply Prevenbon of pollution Protection of wildlife habitat Total Filing Fee Submitted 55.00 State Share $15:00 City/Town Share $40.00 (!'_ fee in nxcess of S?-) Total Refund Due S City/Town Portion S State Portion S ('/z total) (Yz total) Fffortivn 11/1r1/Rq 5- 1 DEP FIDE#242 -910 Therefore, the North Andover Conservation Commission (hereafter the "NACU) hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDMONS 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection(DEP)reserves the right to enter,and inspect the property at all reasonable times, until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act, the North Andover Wetland ByLaw and Regulations, 310 CMR 10.00, and may require any information, measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further,work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until.the NACC is satisfied that the work will comply, and has so notified the applicant in writing. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this order. 5. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section VIII(p.15) of the North Andover Wetland Regulations). CAWinword\00C\242-910.doc 1 NACC 6/4/98 DEP FILE#242- 910 6. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information is so warrant. 7. Where the Department of Environmental Protection(DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 8. The conditions of this decision shall apply to, and be binding upon, the applicant,owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 9. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 10. The proposed work includes: Construction of a sanitary sewer connection within the Buffer Zone of a Bordering Vegetated Wetland, 11. The work shall conform to the following(except as noted in the remainder of this document-where revisions may be required): Notice of Intent filed by: David&Susan Lincoln DATED 5-98 Plans prepared by: Merrimack Engineering Services,Inc. Entitled"#637 Johnson Street" DATED April 6,1998 12. The following wetland resource areas are affected by the proposed work: Buffer Zone to Bordering Vegetated Wetland (BVW). These resource areas are significant to the interests of the Act and Town ByLaw as noted above. These resource areas are also significant to the recreational and wildlife interests of the ByLaw. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. CAWinword\00C\242-910.doc 2 NACC 6/4/98 DEP FILE #242-910 13. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as shown on the plans dated referenced herein. Prior to the issuance of a Certificate of Compliance, the applicant will submit a plan showing the site's wetland delineation at a scale identical to the Town wetland map for this location. 14. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty five foot(25') No-Disturbance Zone and a fifty foot(501 No-Construction Zone (except where otherwise depicted on the plan approved and referenced herein under Condition#11) shall be established from the edge of the adjacent wetland resource area. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade,soils or vegetation is permitted in the No-Disturbance zone. (See Appendix 5 of the local Regulations). 15. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission. 16. This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 17. The owners of the project and their successors in title, in the event they proceed to alter areas subject to the Commission's jurisdiction under the order, agree that the Order does not in itself impose upon the Town any responsibility to maintain the proposed drainage system and that said Town shall not be liable for any damage in the event of failure. By acceptance of this Order, the owners agree to indemnify and hold harmless to the Town and its residents for any damage attributable to alterations undertaken on this property pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. Maintenance of the drainage system, if accepted by the Town as part of a public way, becomes the responsibility of the Town. CAWinword\00C\242-910.doc 3 NACC 6/4/98 DEP FILE#242-910 18. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. PRIOR TO CONSTRUCTION 19. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or,if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 20. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 21. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts Department of Environmental Protection, File Number 242-910." 22. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing(at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review.and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC. CAWinword\000\242-910.doc 4 NACC 6/4/98 DEP FILE#242-910 23. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer gi eer and contractors are to be provided with a copy of this ander of Conditions and referenced documents before commencement of construction. 24. Prior to any work on-site the applicant shall submit to the NACC for approval a sequencing plan for construction and erosion and sedimentation control with supporting plans and details as appropriate. Prior to any work commencing on-site, the applicant shall submit to the NACC for approval, a detailed sequence of construction, including the construction of compensation and retention areas, and revegetation to be completed before other work begins on-site. 25. Wetland flagging shall be checked prior to start of construction and shall be re-established where missing so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with stakes or flags and shall be confirmed by the NACC. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this line at any time. All flags used for the above purposes shall be of a color different from other flagging used on the site. 26. A row of staked hay bales backed by trenched siltation fence shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example,installation of erosion control measures may be required in areas not shown on the plan(s)referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commission's request. CAWinword\00C\242-910.doc 5 NACC 6/4/98 DEP FILE#242 -910 27. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of ten(10) hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems, and shall not be used for the normal control of erosion. 28. A check payable to the Town of North Andover shall be provided in the amount of$1,000 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasure through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provision, satisfactory to the NACC, has been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACCs review and approval. This condition is issued under the authority of the local SyLaw. 29. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring, or assigning any portion of said land to another party, subject to said Orders of Conditions,the "Affidavit" attached via "Appendix A" signed under the pains and penalties of perjury, stating that said applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall be provided to the Conservation Department at least five (5) business days prior to the closing of said land transaction. 30. Once these above mentioned pre-construction requirements are complete, the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative,the contractor,and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period CAWinworW00242-910.doc 6 NACC 6/4/98 DEP FILE#242-910 of time shall be provided as notice of the pre-construction meeting (e.g. 72 hours). 31. The NACC shall be notified in writing of any lot line or number changes with a copy of a pian showing these changes prior to any work on these lots. =DURING CONSTRUCTION 32. Upon beginning work, the applicant shall submit written progress reports every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 33. Any fill used in connection with this project shall be clean fill, containing no trash, refuse rubbish or debris, including but not limited to lumber, bricks, plaster, wire,lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the foregoing. 34. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC. 35. No regrading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 36. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. 37. After proper grading, all disturbed areas located within a resource area which will not remain as wetland areas, shall be loamed (minimum of 4" of quality loam), and seeded.This shall all be done in accordance with SCS guidelines. All disturbed areas located within wetland resource areas which are to be only temporarily disturbed during construction, shall be restored to their original grade, soil profile and vegetative cover. Soil used for this purpose will either be wetlands topsoil or a minimum of 4" of quality loam. 38. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. 39. All waste generated by, or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain CAWinword\000242-916.doc 7 NACC 6/4/98 DEP FILE#242-910 dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. However, no trash dumpsters will be allowed within 50'of areas subject to protection under the Act or local ByLaw. 40. Accepted engineering and construction standards and procedures shall be followed In the completion of the project. 41. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one(1) business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 42. No underground storage of fuel oils shall be allowed on any lot within one- hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions, and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland protection ByLaw. 43. Fertilizers utilized for landscaping and lawn care shall be slow release,low- nitrogen types (<A), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition is issued under the authority of the Town's Wetland Protection ByLaw and shall remain in perpetuity. 44. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by loaming and seeding according to SCS standards. If the latter course is chosen, stabilization will be considered complete once vegetative cover has been achieved. CAWinword\00C1242-910.doc S NACC 6/4/98 DEP FILE#242-910 45. Upon completion of the project,the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. A letter from the applicant requesting a Certificate of Compliance. b. The name and address of the current landowner. c. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they have read and understood the Order of Conditions prior to purchasing their property (see Appendix A-"Affidavit"). d. The name and address of the individual/trust or corporation to whom the compliance is to be granted. e. The street address and assessor's map/parcel number for the project. f. The DEP file number. g. A written statement from a Registered Professional Civil Engineer and Registered Professional Land Surveyor of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. h. An"As-Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer and Registered Professional Land Surveyor of the Commonwealth, for the public record. This plan will include: ➢ "As-Built" post-development elevations of all drainage& stormwator management structures constructed within 100 feet of any wetland resource area. ➢ "As-Built'" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone which is regulated as a wetland under the local wetland bylaw. ➢ Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, sewer lines, additions,fences, sheds, stone walls, pools, retaining walls, and approved decks. ➢ A line showing the limit of work and the extent of existing erosion control devices. "Work" includes iy disturbance of soils or vegetation. A Location of all subsurface utilities entering the property. CAWinword\000242-910.doc 9 NACC 6/4/98 DEP FILE#242 - 910 46. The following special conditions shall survive the issuance of a Certificate of Compliance (COQ for this project ➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas except in those locations approved under DEP #242-910. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC(refer to Section XI .(page 18) of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local ByLaw; ➢ Discharge or spillage of pollutants (Condition#41); Prohibition of underground fuels (Condition#42); ➢ Limitations on the use of fertilizers, herbicides, and pesticides (Conditions #43). CAWinword\OOC\242-910.doc 10 NACC 6!4/98 DEP FILE#242-910 Appendix "A" AFFIDAVIT I, on oath do (authorized agent of applicant anWor owner) hereby depose and state: (PLEASE CHECK AT LEAST ONE BLOC%) 1. I am the of (position with applicant) (applicant name) the applicant upon whom Order of Conditions have been placed upon by (DEP or NACC number) the North Andover Conservation Commission. 2. I am the of (position wick owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. I hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. 4. I hereby affirm and acknowledge that on this day of 199_ I inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File#) 5. I hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File#) Signed under the pains and penalties of perjury this day of 19_ (Signature-authorized agent of applicant or owner) CAWinword\OOC\242-910.doc 11 NACC 6/4/98 242-910 �i�nztur2!�l a I riff Cr".=�T:.'��RC2 SiCsReC u'�/, ,—. aicrajr at ,,lier,onseriai:GR r.Gr^r^(SjiCR. Cn 3rd ,1 June 1 : 98 �etcre I^a chis ¢erSGRallv a, caar2d Albert Manzi Jr. CerSdn de5c" tCet to and wRe executed ;he fCr=7ctnC� lR5(rt'TeRI anC ac!<Rc-I3C9eC :~a( `t2.'Siic ceC:teG i"2 far a ?5 �t5i`Ter ii ee dC: and deed. December 11, 2003 ''11 J nI�C my c:cr-Lit(SJ:cn exciras ... i.. ir,a 3 c(tc-.n:.:^a�+r.sc any�sr:n ag,-sv=*1�y tn(s CfCef. an owner ct lanC=uGing;ne tart veer*is:c cs xn ••R cn:�e crcccsac y ne:dieC at;relr r grit to recaest Ceaarcrent ct eerie.cr any;en res;cents ct:;is c::•/er tcwn in wnia't suet tare s Ice3ted.are r(eraathe anv rcnmantal ?rctz;acn ro issue a Zucsrsadirg Creer. �revioirg the recuest;s chats cy c_r,;tieJ' rnad vnacc aetiverf(a :me Cecar ment. wHn:ne acGrecr:ata tiling!e3 arc;s�e i cans^taai=vrre as crev,ded in 210C:d? tO. 77,wrtnin ten Cays!rm;ne Cate at is;uancs at;Rts Cater-ntnatten.A cozy ct :r,a request stiaall at;ne sarne urne C9 sent cy csnttiec,-ad cr rtanc caiivery(c:ne CansaNatic CQRSmt551Cn arc;na acctic�•:• D= ycu a sh cc aeoea? Cnis decision uzdar the Town 371 = :, a comet =;=t muse be =_pec+ is Supe=iar CCU--c REC77 FRCN THE REGISTRY OF DEEDS LH ST BE SUEMITTED TO THIS OFFICE ScdOGilNG T L4T IS ORDER OF CONDTTIOi�S HAS BEE:,' RECORDED AT TTH NORTHESSEC REGISTRY OF DEEDS . _ at,.•art. Catac't an cause lina anc sucrnit ;a the 'March Andova Ccrl a "'ra ' grlar (a c_ me c- 1 6 Hain Jct c'r , frre o . Andovac H C-1.-8. 5 ..... � .......•.•......................................................... ' ,doves CoPservar-icn Coitm ssi-oa 'a =le:Se ze 'nae ^e Cr cer j1 czricticns!CC the crciect a 7_910 Deeds Esse:,: enc e Nurna,"' - _^as cern r=CcrCen at me Is,-y at 'as-etn'.CteC.n :ne _C'aln ct II(te zt:ne attec:zcarccer-Pr ene(31 Ccn C:UCn�Cn it ;jCZfCaC .,;.C. :rte ,r5 ^an; nuraeer write^ Icanatlas ,-:ts.a=�.^:�c-c"�s REQ ,YL JOYCE BRAD JAW CLERK Notification to Abutters Under the TOWN N©R1'N ANDOVER Massachusetts Wetlands Protection Act ' M4Y.19 10 37 AN In accordance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40,you are hereby notified of the following: A. The name of the applicant is Susan Conway Lincoln and David Lincoln. B. The applicant has filed a Notice of Intent with the Conservation Commission for the municipality of North Andover seeking permission to remove,fill,dredge or alter an Area Subject to Protection Under the Wetlands Protection Act(General Laws Chapter 131,Section 40). C. The address of the lot where the activity is proposed is 637 Johnson Street. D. Copies of the Notice of Intent may be examined at the North Andover Conservation Commission between the hours of 9:00 A.M.and 4:00 P.M.on the following days of the week: Monday-Friday(please call for appointment) For more information,call: (978)688-9530 Check One: This is the applicant❑,representative❑,or other specify): Conservation Commission E. Copies of the Notice of Intent may be obtained from the North Andover Conservation Commission for the cost of reproduction between the hours of 9:00 A.M.and 4:00 P.M.on the following days of the week: Monday-Friday(please call for appointment) For more information,call: (978)688-9530 F. Information regarding the date,time and place of the public hearing may be obtained from the North Andover Conservation Commission by calling this telephone number: (978)688-9530 between the hours of 9:00 A.M. and 4:00 P.M.on the following days of the week: Monday-Friday NOTE: Notice of the public hearing,including its date,time and place will be published at least five(5)days in advance in the North Andover Citizen. NOTE: Notice of the public hearing,including its date,time and place will be posted in the City or Town Hall not less then forty-eight(48)hours in advance. NOTE: You also may contact your local Conservation Commission or the nearest Department of Environmental Protection Office for more information about this application or the Wetlands Protection Act. To contact DEP,call: Central Region: 508-792-7650 Northeast Region: 617-935-2160 Southeast Region: 508-946-2800 WesternRegion: 413-784-1100