Loading...
HomeMy WebLinkAboutMiscellaneous - 863 DALE STREET 310 CMR 10.99 Form 5 { .f(}�1 } DEP File No. 242-747 ,. TOWN C E to NORTH ANDOVER (tot tirvv wltryUEVJ Commonwealth n, Cay4own North Andover of Massachusetts j G AoviIcant Glenn T. Saba d.b.a.. Mertco Builders Lot 11 Dale Street Order of Conditions Massachusetts Wetlands Protection Act G.L. c. 131 , §40 and under the Town of North Andover's Bylaw Chapter 3.5 From NORTH ANDOVER CONSERVATION COMMISSION Glenn T. Saba To d.b.a Mertco Builders Joan Cashman (Name of Applicant) (Name of property owner) PO Box 907 907 Dale Street Address Methuen MA 01844 Address No Andover MA 01845 This Order is issued and delivered as follows: ❑ by hand delivery to applicant or representative on (date) !Yxby certified mail, return receipt requested on [his project is located at Lot 11 Dale Street The property is recorded at the Registry of Nor hPrn r•--qf3X _ Book Page 11916 on May 6, 1994 Certificate (if registered) The Notice of Intent for this project was filed on March 21, 1995 (datel The public hearing was closed on April 5, 1995 (date) Findings The North Andover Conservation Commission has reviewed the above•referEnced FJotice of Intent and plans and has held a public hearing on the protect. Based on the information avaitaole Ie the NACC at this time. the has determined that the area on which the proposed work is to be done is significant to the following interests in accoroance v.ith the Presumptions of Significa ce sMorth in the requlations for each Area Subject to Protectio"n Under the �h. 178 X Recreation Act (check as appropriate): Ch.178: X Prevention of Erosion & Sedimentation Ch.178 .k Wildlife 4 Pubiic water supply 4 Flood control , ❑ Land containing shellfish � Private water supply QQ Storm damage prevention El Fisheries j Ground water supply 14 Prevenbon of pollution Protection of wildlife habitat Total Filing Fee Submitted $250.00 State Share City/Town Share 137.50 ('.% lee in r�xcess of S25) Total Refund Due S CityrTown Portion S State Portion S ('/z total) (Lz total) Effective 11/10/89 ' t DEP FILE# 242 - 747 Therefore, the North Andover Conservation Commission(hereafter the"NACC")hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations,to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this order. 5. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Where the Department of Environmental Protection is requested to make a determination and to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 7. The proposed work includes the construction of a single family dwelling and septic system within 100' of a Bordering Vegetated Wetland (BVW); clearing and grading within the 50' "No-Build Zone"; there is to be no disturbance or encroachment within the 25' "No-Cut Zone". 8. The work shall conform to the following(except as noted in the remainder of this document where revisions may be required): Notice of Intent filed by: Mr. Glenn Saba, d.b.a. Mertco Builders P.O. Box 907 Methuen, MA 01844 Plans prepared by: Mr. Joseph Borgesi, P.E. "Topographic Plan" DATED - 3/15/95 CAWinword\00C\242-747.d0c 1 NACC 4/11/95 DEP FILE #242 - 747 9. The following wetland resource area(s)is affected by the proposed work: Buffer Zone of Bordering Vegetated Wetland (BVW). This resource area is significant to the interests of the Act and Town ByLaw as noted above. This resource area is also significant to the recreational and wildlife interests of the ByLaw. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 10. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as shown on the referenced"Topographic Plan" (DATED3/15/95). Prior to the issuance of a Certificate of Compliance, the applicant will submit a plan showing the site's wetland delineation at a scale identical to the Town wetland map for this location. 11. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding or storm damage. 12. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. 13. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site to construct a single family home and septic system will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas beyond those proposed in the Notice of Intent and approved herein, a twenty five (25)foot no-disturbance zone and a fifty (50) foot no-construction zone shall be established from the edge of the adjacent wetlands. No disturbance of existing grade, soils or vegetation is permitted in the no-disturbance zone. (See Appendix 5 of the local Regulations). PRIOR TO CONSTRUCTION 14. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed,until all proceedings before the Department or Court have been completed. 15. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover CAWinword\00C\242-747.doc 2 NACC 4/11/95 DEP FILE #242 - 747 Conservation Commission on the form at the end of this Order prior to commencement of the work 16. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words"Massachusetts Department of Environmental Protection, File Number 242-747". 17. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing(at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC. 18. The applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange anon-site conference with an NACC representative, the contractor and the applicant to ensure that all of the Conditions of this Order are understood. This Order also shall be made a part of the contractor's written contract. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. 19. The applicant shall submit a construction schedule/sequence to the NACC detailing the proposed sequence of work on site to complete this project. 20. Wetland flagging shall be checked prior to start of construction and shall be re- established where missing so that erosion control measures can be properly placed and wetland impacts can be monitored. 21. A row of staked hay bales.backed by trenched siltation fence shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on referenced plans dated 3/15/95 and shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. 22. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of 25 hay bales and sufficient stakes for staking these bales CAWinword\000\242-747.doc 3 NACC 4/11/95 DEP FILE # 242 - 747 or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems, and shall not be used for the normal control of erosion. 23. A check payable to the Town of North Andover shall be provided in the amount of $3,000 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC , and shall be posted with the North Andover Town Treasure before commencement of work. Said bond or deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provision, satisfactory to the NACC, has been made for performance of any conditions which are of continuing nature. The applicant may propose a bond release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. DURING CONSTRUCTION 24. Upon beginning work, the applicant shall submit written progress reports every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 25. Any fill used in connection with this project shall be clean fill, containing no trash, refuse rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the foregoing. 26. No exposed area shall remain unfinished for more than thirty(30) days, unless approved by the NACC. 27. No regrading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 28. There shall be no stockpiling of soil or other materials within twenty-five(25) feet of any resource area. 29. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. 30. All waste generated by, or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters(or other suitable means) at the site for the storage and removal of such spent construction materials off-site. CAWinword\00C\242-747.doc 4 NACC 4/11/95 DEP FILE # 242 - 747 31. Accepted engineering and construction standards and procedures shall be followed In the completion of the project. 32. Members of the NACC or its agent shall have the right to enter upon and inspect the premises to evaluate and/or effect compliance with this Order of Conditions. The NACC reserves the right to require, following field inspection, additional information or resource protection measures. 33. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1)business day. No construction vehicles are to be stored within 100 feet of wetland resource areas,and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. AFTER CONSTRUCTION 34. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions, and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland protection ByLaw. 35. Fertilizers utilized for landscaping and lawn care shall be organic and low-nitrogen content, and shall be used in moderation. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition is issued under the authority of the Town's Wetland Protection ByLaw. 36. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by loaming and seeding according to SCS standards. If the latter course is chosen, stabilization will be considered complete once vegetative cover has been achieved. 37. Upon completion of the project, the applicant shall submit a letter to the NACC from a Registered Professional Civil Engineer certifying compliance with this Order of Conditions and the approved plans referenced herein(or approved revisions), A stamped "As-Built" topographic plan of all areas within the jurisdiction of the Wetlands Protection Act and ByLaw shall be submitted when a Certificate of Compliance is requested. This plan will include: A) "As-Built" elevations of all drainage structures constructed within 100 feet of any wetland resource area; C) Distances from structures to wetland resource areas; C:\Winword\00C\242-747.doc 5 NACC 4/11/95 DEP FILE # 242 - 747 D) A line showing the limit of work. "Work" includes any disturbance of soils or vegetation. 38. The following special conditions shall survive the issuance of a Certificate of Compliance for this project: 33. Discharge of spillage of pollutants. 34. Prohibition of storage of fuels underground. 35. Limitations on the use of fertilizers, herbicides and pesticides. CAWinword\OOC\242-747.doc 6 NACC 4/11/95 D• .' P. #242- 747 Lot 11 Dale Street Issued By NORTH ANDQVF4 Conservation Commission Signatu (s) This Order must be signed by a majority of the Conservation Commission. On this 19th day of April 19 95 before me personally George L. Reich p y a ppeared , to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. Qz224t Q_e otary Public My commission expires The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land upon which the proposed work is to be done or any len residents of the city or town in which such land is located are hereby notified of their right to request the Department of Environmental Cluality Engineering to issue a Superseding Order,providing the request is made by certified mail or hand delivery to the Department,with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7),within ten days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. If you wish to appeal this decision under the Town Bylaw, a complaint must be filed in Superior Court. RECORDING INFORMATION: Detach on dotted line and submit to the North Andover Conservation Comm. prior to commencement of work. .................................................................................................................................................................................................................. To North Andover Conservation Commission, 120 Main St. , North Andover �u OlA8i1lonly Please be advised that the Order of Conditions for the project at Lot 11 Dale Street File Number 242- 747 has been recorded at the Registry of Deeds , Northern Essex and has been noted in the chain of title of the affected property in accordance with General Condition B on 19_ If recorded land, the instrument number which identifies this transaction is If registered land,the document number which identifies this transaction is_ ----- --------------- Signature Applicant 5.4A J0 GE R Rt- 310 CMR 10.99 TOWN 01-i`tK NORTH AtWOVER Form 8 DEP File No. 242— 747 (To oe orovioed by DEP) . _ Ctty'lown North Andover Commonwealth Glenn T. Saba . of Massachusettsacoucant d.b.a. Mertco Builders - LOT 11, 4863 DALE STREET Certificate of Compliance Massachusetts Wetlands Protection Act, C.L. c. 131 , §40 From North Andover Conservation Commission Issuing Authority Glenn T. Saba --P.O-. Box 907 To d.b.a. Mertco Builders Methuen MA 01844 (Name) (Address) Date of Issuance November 1, 1995 This Certificate is issued for work regulated by an Order of Conditions issued to Glenn T. Saba d.b.a Mertco Builders dated 04-25-95 and issued by the NACC LXX It is hereby certified that the work regulated by the above-referenced Oraer of Conditions has been satisfactorily completed. 2• ❑ It is hereby certified that only the following portions of the work regulated by the above-refer- enced Order of Conditions have been satisfactorily completed: (If the Certificate of Compliance does not include the entire project,specify what portions are included.) 3, Q It is nereby certified that the work regulated by the above-referenced Oraer of Conditions was never commenced.The Order of Conditions has lapsed and is therefore no loncer valid. No future Werk subiect to reculation unser the Act may be commenced without filing a new Nonce of Intent an:: receiving a new Order of Conditions. ................................................................................................................... (Leave Soace Blank) �ffec:;ve .1110189 4. This certificate shall be recorded in the Registry of Deeds or the Land Court for the district in which the land is located.The Order was originally recorded on 05-05-95 (date) at the Registry of Deeds, North Essex , Book , Page Instrument #9221 [j The following conditions of the Order shall continue: (Set forth any conditions contained in the Final Order, such as maintenance or monitoring,which are to continue for a longer period.) Issued by No Andover Conservation Commission Si_nature(s) When issued by the Conservation Commision this Certificate must be signed by a majority of is members. On this First day of November , 1 g 95 . before me personally appeared George L. Reich , to me known to be the person described in and who executed the foregoing instrument and acknowledged that he:she executed the same as his/her free act and deed. I March 22, 2002 ,Mary Public My commission expires 41 PROVIDE COPY OF RECORDING TO THE NORTH ANDOVER CONSERVATION COMMISSION: Detach on dotted line and submit to the NACC, 120 Main Street, North Andover MA 01845 To NACC Issuing Authonty Please beadvised mat the CeniftcateatComaWmeforumproteetat. Lot 11" (#863) Dale Street 242- 747 hastxenrecordedattheR Deeds, Northern Essex Pile Number e9tstry Of and has been noted in the cnaM of hue of the affected wooeM on 19 it reporeea hanc.ne instrument num0er wIUVI wehtahes teas transaction Is !f registered land.the cowmen nater which hoenalim this transaction is Signature Aooucant