Loading...
HomeMy WebLinkAboutMiscellaneous - 322 BOSTON STREET 310 CMR 10.99 Form 3 DEP File No. 242-854- (To 42-g54(To oe orowaed by QE.a) — - CommonwealthC+Iv'Town North Andover ,494= . - of Massachusetts William K. Barrett AOoucant 322-555 Boston Street Certificate of Compliance Massachusetts Wetlands Protection Act, G.L. c. 131 §40 North Andover Conservation Commission Issuing Authority 1049 'Turnpike Street To William 1,. Barrett No Andnvpr._ MA 07 945 (Name) (Address) Date of Issuance August 5, 1998 This Cer„iicate is issued for work regulated by an Order of Conditions issued to Colonial Village Dev Corp. dated '1111,1Q7 and issued by the NACC It is hereby certified that the work regulated by the above•referenceo Oraer of Conditians has been satisfactorily comp!eted. 2. D It is hereby certified that only the following portions of the work regulated by the above-refer- enced Oraer of Conditions have been satisfactorily ccmpfeteo: (1f the.Certificate of Compiiance does not include the entire project, specify what portions are inc!uded.) Q It isnerecy certified that the work regulated by the above•referenceo Orcer of Conditions was never commenced.The Order of Conditions has Iacisee and is therefore no longer vaiid. No future \n,crx subject to regulation uncer the Act may be commenced without filing a new Notice cf Intent anc receiving a new Orcer of Conditions. (Leave Scace BianK) 6.1 a, 0 This certificate shall be recorded in the Registry of Deeds or the land Court for the district in whicn the land is located.The Order was originally recorded on N/A (Cate) at the Registry of , Book_. Page 5, Q The following conditions of the Order shall continue: (Set forth any conditions contained in the Final Order, such as maintenance or monitoring,which are to continue for a longer period.) North Issued by North Andover Conservation Commission Signature(s) When issued by the Conservation Commision this Certificate must be signed.-by a majority of is members. On this 5th day of August , 19 98 . before me personally appeared Scott_Masse to me known to be the person described in and who executed the foregoing instrument and acknowledged that he.she executed the same as his/her free act and deed. r December 11, 2003 Notary Pubfic My commission expires _ Detach on dotted line and submit to the To NACC issuing Autnonty Please be aavLsed that the Cenficate of Compliance for the protect at. FifeNumoer 242-854 rias been recorbeaatineRegistryof Deeds, Northern Essex and has been notea in the cnain of title of me altectea crocerty on r? It.reccraea tanc.me instrument numoer wntr-t toentrtres taus transacuon is it registered land.the cacurnent number wnt n tde,:rhes tnrs mis=cn r 310 CMR 10.99 i• ' Form 5 i DEP fila No, 1- 242-854 :,._, (to tM Lrwtinn Dy UE1'1 - - North Andover r Commonwealth City.town ��-•+- of Massachusetts Aoal+cant Colonial Vlg Dev Corp = . Order of Conditions Massachusetts Wetlands Protection Act G.L. c. 131 , §40 and under the Town of North Andover's Bylaw Chapter 3.5 From NORTH ANDOVER CONSERVATION COP1ttISSION To Colonial Village Dev Corp. Same (Name of Applicant) (14ame of property owner) Address 1049 Turnpike St. , No. And. , MA Address Same This Order is issued and delivered as follows: C3 by hand delivery to applicant or representative on by certified mail, return receipt requested on ZI3ZJ 9�,j �/ Idatel 1-his project is located at Boston Street, from #322 to #555 The property is recorded at the Registry of Nnrt•hern Essex _ Book N/A Page N/A Certificate (if registered) The Notice of Intent for this project was filed on February 6. 1997 (date) The public hearing was closed on February 19, 1997 (date) Findings The North Andover Conservation Commission has reviewed the above•relerpriced Nonce of Intent and plans and has held a public hearing on the protect. Based on the information avadaole to the NACC at this time, the NA(:(' _ has deternimed that the area on which the proposed work is to be done is significant to the following interests in accoroance v.ith the Presumptions of Significa ce forth in the regulations for each Area Subject to Protecnwi Under ttte �h. -178 Recreation Act (check as appropriate): Ch.178: — Prevention of Erosion & Sedimentation Ch.178 Wildlife Pubiio water supply �_ Flood control 0 Lind containing slIJIish Private water supply Z Storm damage prevention Fisheries Ground water supply 0 Prevention of pollution Protection of wildlife habitat Totaf Filing Fee Submitted $250.00 State Share $112.50 City/Town Share $137.50 lee in Pxcr.ss of S2-) Total Refund Due S City/Town Portion S Slate Portion S (1/2 total) (!/2 total) Effective 11/10/89 5-1 DEP FILE #242 - 854 Therefore, the North Andover Conservation Commission (hereafter er the "NACC") hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans,specifications or other proposals submitted with the Notice of Intent,the conditions shall control. GENERAL CONDITIONS 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. 2. This Order does not grant any property rights or any exclusive privileges it does not authorize any injury to private property or invasion of property rights. 3. This Order does not relieve the permittee or any other person of the necessity of.complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this order. 5. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section VIII (p.15) of the North Andover Wetland Regulations). 6. Where the Department of Environmental Protection(DEP) is requested to make a determination and to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 7. The proposed work includes: Installation of a waterline in Boston Street(from approximately#322 to#555)within the 100'Buffer Zone of a Bordering Vegetated Wetland(BVW). I -CAWinwm-&00C\242-854.doc 1 NACC 3113197 DEP FILE # 242 - 854 8. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): Notice of Intent filed by: Colonial Village Development Corporation DATED 2/6/97 Plans prepared by: Christiansen and Sergi,Inca entitled"Off-site Improvements®Windkist Estates" DATED V28/97 9. The following wetland resource areas are affected by the proposed work: Buffer Zone to Bordering Vegetated Wetland (BVW). These resource areas are significant to the interests of the Act and Town ByLaw as noted above. These resource areas are also significant to the recreational and wildlife interests of the ByLaw. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 10. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as shown on the plans dated 1JW97. Prior to the issuance of a Certificate of Compliance,the applicant will submit a plan showing the site's wetland delineation at a scale identical to the Town wetland map for this location. 11. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding or storm damage. 12. The conditions of this decision shall apply to, and be binding upon,the applicant, owner, its employees and all successors and assigns in interest or control. C:\Winword\OOC\242-854.doc 2 NACC 3/13/97 DEP FILE # 242 - $54 PRIOR TO CONSTRUCTION 13. No work shall be undertaken until all administrative appeal periods from Pp this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 14. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods.No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. 15. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words"Massachusetts Department of Environmental Protection,File Number 242-854." 16. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant).Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions.Any errors found in the plans or information submitted by the applicant shall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC. 17. The applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative, the contractor and the applicant to ensure that all of the Conditions of this Order are understood. This Order also shall be made a part of the contractor's written contract. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction C.\Winword\00C\242-854 doc 3 NACC 3/13/97 DEP FILE #242 - 854 supervisor hired to coordinate construction and to ensure compliance with this Order. 18. The applicant shall submit a construction schedule/sequence to the NACC detailing the proposed sequence of work on site to complete this project. 19. Wetland flagging shall be checked prior to start of construction and shall be re-established where missing so that erosion control measures can be properly placed and wetland impacts can be monitored. 20. A row of staked hay bales backed by trenched siltation fence shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shallbe inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. 21. The applicant shall have on hand at the start of any soil disturbance,removal or stockpiling, a minimum of thirty (30) hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems,and shall not be used for the normal control of erosion. 22. A check payable to the Town of North Andover shall be provided in the amount of$3,000 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasure before commencement of work.Said deposit of money shall be conditioned on the completion of all conditions hereof, shall' be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provision, satisfactory to the NACC,has been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. CAWinword\00C\242-854.doc 4 NACC 3/13/97 DEP FILE # 242 - 854 DURING CONSTRUCTION 23. IMPORTANT: By issuance of this Order of Conditions,the NACC authorizes replacement of an existing 15" RCP in the immediate vicinity of Station 3+00 if said pipe is observed to be failing at the time of utility installation. This condition simply permits replacement of a pipe with an exact duplicate and does not allow for a larger or smaller structure. 24. IMPORTANT: Upon the completion of daily construction activities, a suitable cover shall be required for all open trenches. 25. Upon beginning work, the applicant shall submit written progress reports every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 26. Any fill used in connection with this project shall be clean fill,containing no trash, refuse rubbish or debris, including but not limited to lumber, bricks, plaster, wire ,lath , paper,cardboard, pipe, tires,ashes,refrigerators, motor vehicles or parts on any of the foregoing. 27. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC. 28. No regrading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 29. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. 30. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. 31. All waste generated by, or associated with,the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. 32. Accepted engineering and construction standards and procedures shall be followed In the completion of the project. CAWinword\00C\242-854,doc 5 NACC 3/13/97 DEP FILE #242 - 854 33. Members of the NACC or its agent shall have the right to enter upon and inspect the premises to evaluate and/or effect compliance with this Order of Conditions. The NACC reserves the right to require,following field inspection, additional information or resource protection measures. 34. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. CAWinword\00C\242-854.doc 6 NACC 3/13/97 DEP FILE #242 - 854 AFTER CONSTRUCTION 35. No underground storage of fuel oils shall be allowed on any lot within one- hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions, and shall run with the title of the property. This condition is issued under the authority of the Towns Wetland protection ByLaw. 36. Fertilizers utilized for landscaping and lawn care shall be organic and low- nitrogen content, and shall be used in moderation. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition is issued under the authority of the Town's Wetland Protection ByLaw. 37. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by loaming and seeding according to SCS standards. If the latter course is chosen, stabilization will be considered complete once vegetative cover has been achieved. 38. Upon completion of the project, the applicant shall submit a letter to the NACC from a Registered Professional Civil Engineer certifying compliance with this Order of Conditions and the approved plans referenced herein (or approved revisions). Certification includes,but is not limited to,verification that the limit of work coincides with the approved"NO- DISTURBANCE/NO-BUILD" NO-DISTURBANCE/NO-BUILD" zones. A stamped "As-Built"topographic plan of all areas within the jurisdiction of the Wetlands Protection Act and ByLaw shall be submitted when a Certificate of Compliance is requested. This plan will include: a) "As-Built" elevations of all drainage structures constructed within 100 feet of any wetland resource area; b) "As-Built" elevations and grades of all filled or altered wetland resource areas; c) Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, stone walls, POOLS, retaining walls, and approved decks; d) A line showing the limit of work. "Work" includes any disturbance of soils or vegetation; e) Location of all subsurface utilities entering the property; C.\ jw COOC�242=8S4.dbc 7 NACC 3/13/97 DEP FILE # 242 - 854 f) Location of existing erosion controls. 47)Furthermore, the following information must be submitted to the NACC when requesting a Certificate of Compliance: a) The name and address of the current landowner; b) The name and address of the individual/trust or corporation to whom the compliance is to be granted; c) The street address and assessor's map/parcel number for the project; d) The DEP file number; e) A statement certifying compliance with the Order of Conditions and approved plans. 48. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: • 25' No-Disturbance Zone and a 50` No-Construction Zone shall be established from the edge of adjacent wetland resource areas except in those locations approved under DEP# 242- 854. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC (refer to Section XI (page 18)of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local Bylaw; • Maintenance of catch basins; • Discharge of spillage of pollutants; • Prohibition of storage of fuels underground; • Limitations on the use of fertilizers,herbicides and pesticides. C:\Winword\00C\242-854Am 8 NACC 3/13/97 D.,Er P. #242- 854 242-854 Issued By �C)RkHj AD V R Conservation Commission LI�IJA A/14" Signature(s) z;i 11�4� r, This 09er must be signed by a majority of the Conservation Commission. On this 12th day of March 19 97 before me personally appeared Joseph W. Lynch,, Jr. , to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. December 11, 2003 Notary Public My commission expires The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land upon which the proposed work is to be done or any len residents of the city or town in which such land is located are hereby notified of their right to request the Department of Environmental Quality Engineering to issue a Superseding Order,providing the request is made by certified mail or hand delivery to the Department,with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7),within ten days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. If you wish to appeal this decision under the Town Bylaw, a complaint must be filed in Superior Court. RECORDING INFORMATION: Detach on dotted line and submit to the North Andover Conservation, Comm. prior to commencement of work. .................................................................................................................................................................................................................. North Andover Conservation Commission, 120 Main St. , North Andover 018/l5 To ssurng Aut iorrty Please be advised that the Order of Conditions for the project at Fite Number 242- 854 has been recorded at the Registry of Deeds , Northern Essex and has been noted in the chain of title of the affected property in accordance with General Condition Bon---, t 9 It recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is_ -----.--- Signature Applicant 5-4A