Loading...
HomeMy WebLinkAboutTOWN OF NORTH ANDOVER (14) f Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 4B — Order of Resource Area Delineation 242-1146 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: When filling out From: forms on the North Andover Conservation computer, use Conservation Commission only the tab key to move This Issuance is for(check one): your cursor- do not use the return key. ® Order of Resource Area Delineation k ❑ Amended Order of Resource Area Delineation To: Applicant: Property Owner(if different from applicant): Ben Gary, c/o Moriece &Gary, Inc. Town of North Andover(c%School Committee) Name Name 56 Roland Street 120 Main Street Mailing Address Mailing Address Charlestown MA 02129 North Andover MA 01845 City/Town State Zip Code City/Town State Zip Code 1. Project Location: Foster Farms - Boxford Street North Andover Street Address City/Town Map 104D Lot 38 Assessors Map/Plat Number Parcel/Lot Number 2. Title and Date (or Revised Date if applicable)of Final Plans and Other Documents: ANRAD Site Plan, prepared by Christiansen &Sergi,2 Sheets Revised 6/24/02 Title Date Abbreviated Notice of Resource Area Delineation May 10, 2002 Title Date Title Date 3. Dates: May 10, 2002 7/10/02 7/11/02 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance wpaform4b.doc•rev.12/15/00 Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 4B — Order of Resource Area Delineation 242-1146 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Order of Delineation The Conservation Commission has determined the following (check whichever is applicable): ® Accurate: The boundaries described on the referenced plan(s) above and in the Abbreviated Notice of Resource Area Delineation are accurately drawn for the following resource area(s): ® Bordering Vegetated Wetlands ® Other Resource Area(s), specifically: Bordering Land Subject to Flooding, Riverfront Area and Bank associated with Mosquito Brook ❑ Modified: The boundaries described on the plan(s) referenced above, as modified by the Conservation Commission from the plans contained in the Abbreviated Notice of Resource Area Delineation, are accurately drawn from the following resource area(s): ❑ Bordering Vegetated Wetlands ❑ Other Resource Area(s), specifically: ❑ Inaccurate: The boundaries described on the referenced plan(s)and in the Abbreviated Notice of Resource Area Delineation were found to be inaccurate and cannot be confirmed for the following resource area(s): ❑ Bordering Vegetated Wetlands ❑ Other Resource Area(s), specifically: The boundaries were determined to be inaccurate because: wpaform4b.doc•rev.12/15/00 Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP Fide"umber: WPA Form 4B - Order of Resource Area Delineation LI I2242-1146 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ©wded by DEP B. Order of Delineation (cont.) This Order of Resource Area Delineation determines the boundaries of those resource areas noted above and is binding as to all decisions rendered pursuant to the Massachusetts Wetlands Protection Act (M.G.L. c.131, § 40) and its regulations (310 CMR 10.00) regarding such boundaries. This Order does not, however, determine the boundaries of any resource area or Buffer Zone to any resource area not specifically noted above, regardless of whether such boundaries are contained on the plans attached to this Order or to the Abbreviated Notice of Resource Area Delineation. This Order must be signed by a majority of the Conservation Commission.The Order must be sent by certified mail (return receip ested) or hand delivered to the applicant.A copy also must be mailed or hand delivered at the s e tim o the appropriate DEP Regional Office(see Appendix A) Sig atures: This Order is valid for three years from the date of issuance. This Order is issued to the applicant and the property owner(i different)as follows: ❑ by hand delivery on (�y certi ied ail, return receipt requested on Date Date C. Appeals The applicant, the owner,any person aggrieved by this Order,any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located,are hereby notified of their right to request the appropriate DEP Regional Office(see Appendix A)to issue a Superseding Order of Resource Area Delineation.The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Appendix E: Request for Departmental Action Fee Transmittal Form,as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L.c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal bylaw or ordinance, and not on the Massachusetts Wetlands Protection Act or regulations,the Department of Environmental Protection has no appellate jurisdiction. wpaform4b.doc•rev.12/15/00 Page 3 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection- Wetlands WPA Appendix A - DEP Regional Addresses Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Mail transmittal forms and DEP payments,payable to: Commonwealth of Massachusetts Department of Environmental Protection Box 4062 Boston, MA 02211 DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tyringham 436 Dwight Street Agawam Conway Hancock Montague Plainfield wales Alford Cummington Hatfield Monterey Richmond Ware Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick Springfield,MA 01103 Ashfield Deerfield Heath Monson Russel Washington Becket 413-784 1100 ket Easthampton Hinsdale Mount Washington Sandisfield Wendel Belchertown East Longmeadow Holland New Ashford Savoy Westfield Fax:413-784-1149 Bemardston Egremont Holyoke New Marlborough Sheffield Westhampton Blandford Erving Huntington New Salem Shelburne West Springfield Brimfield Florida Lanesborough North Adams Shutesbury West Stockbridge Buckland Gill Lee Northampton Southarrpton Whately Charlemont Goshen Lenox Northfield South Hadley Wilbraham Cheshire Granby Leverett Orange Southwick Williamsburg Chester Granville Leyden Otis Springfield Williamstown Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor Chicopee Greenfekf Ludlow Pelham Sunderland Worthington Clarksburg Hadley Middlefield Peru Tolland DEP Central Region Acton Chariton Hopkinton Millbury Rutland Uxbridge 627 Main Street Ashbumham Clinton Hubbardston Milville Shirley Warren Ashby Douglas Hudson New Braintree Shrewsbury Webster Worcester,MA 01605 Atha Dudley Holliston Northborough Southborough Westborough Phone:508-792-7650 Auburn Dunstable Lancater Northbridge Southbridge West Boylston Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield Bane Fitchburg Leominster Oakham Sterling Westford TDD:508-767-2788 Bellingham Gardner Littleton Oxford stow Westminster BerlinGrafton Lunenburg Paxton Sturbridge Wkrohendon Blackstone Groton Marlborough Pepperell Sutton Worcester Bolton Harvard Maynard Petersham Templeton Boxborough Hardwick Medway Phllipston Townsend Boylston Holden Mendon Princeton Tyngsborough Brookfield Hopedale Milford Royaiston Upton DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provinostown Tisbury 20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro Attleboro Dighton Gosnold Nantucket Rehoboth Wareham Lakeville,MA 02347 Avon Duxbury Halifax NewBedlord Rochester welmest Phone:508-946-2700 Barnstable .Eastham Hanover North Attleborough Rockland West Bridgewater Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport Boume Easton Harwich Norwell Scituate West Tisrury TDD:508-946-2795 Brewster Edgartown Kingston oak Bluffs Seekonk Whitman Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham Brockton Fall River Mansfield Pembroke Somerset Yarmouth Carver Falmouth Marion Plainville Stoughton Chatham Foxboroug h Marshfield Plymouth Swansea Chilmark Franklin Mashpse PlymPlon Taumor DEP Northeast Region Amesbury Chelmsford Hingham Menvnac Quincy Wakefield 205 Lowell Street Andover Chelsea Holbrook Methuen Randolph Walpole Arlington Cohasset Hull Middleton Reading Waltham Wilmington,MA 01887 Ashland Concord Ipswich Mills Revere watertown Phone:978-661-7600 Bedford Danvers Lawrence Milton Rockport Wayland Balm Dedham � �rn y wow"978-661-7615 eerDover L � ertem TDD:978-661-7679 Billerica Dracut Lowell Needham Salisbury West,Newbury Boston Essex Lynn Newbury Saugus Weston Boxford Everett Lynhfiel d Newburypon Shertwm Westwood Braintree Framingham Malden Newton SomenMle Weymouth Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington Burlington Gloucester Marblehead Nath Andover Sudbury Winchester Cambridge Groveland Medfield North Reading Swampscott Winthrop Canton Hamilton Medford Norwood Tewksbury Woburn Carlisle Haverhill Melrose Peabody Topsfield Wpaform4b.doc•Appendix A•rev.11/22/00 Page 1of 1 i Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Appendix E — Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Request Information Important: When filling out 1. Person or party making request(if appropriate, name the citizen group's representative): forms on the computer, use Name only the tab key to move your cursor- Mailing Address do not use the return key. CityrTown State Zip Code rQ Phone Number Fax Number(if applicable) Project Location Mailing Address City/Town State Zip Code 2. Applicant(as shown on Notice of Intent(Form 3),Abbreviated Notice of Resource Area Delineation (Form 4A);or Request for Determination of Applicability(Form 1)): Name Mailing Address City/Town State Zip Code Phone Number Fax Number(if applicable) 3. DEP File Number: B. Instructions 1. When the Departmental action request is for(check one): ❑ Superseding Order of Conditions ❑ Superseding Determination of Applicability ❑ Superseding Order of Resource Area Delineation Send this form and check or money order for$50.00,payable to the Commonwealth of Massachusetts to: Department of Environmental Protection Box 4062 Boston MA 02211 Wpaform4b.doc•Appendix E•rev.2/00 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands L11 WPA Form 5 - Order of Conditions 242-1065 Massachusetts Wetlands Protection Act'M.G.L. c. 131, §40 Provided by DEP A. General Information Important: From: When filling out forms on North Andover the computer, Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do ® Order of Conditions not use the return key. ❑ Amended Order of Conditions t� To: Applicant: Property Owner(if different from applicant): DPW Town of North Andover Town of North Andover Name Name reran 384 Osgood St. 120 Main St. Mailing Address Mailing Address North Andover MA 01845 NoOrth Andover MA 01845 City/Town State Zip Code City/Town State Zip Code 1. Project Location: Boxford Street North Andover Street Address City/Town 104D 38 Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex 5186 249 County Book Page Certificate(if registered land) 3. Dates: 3/9/01 1/9/02 1/10/02 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents(attach additional plan references as needed): Foster Farm Fields North Andover, MA sheets EX1, L1, L2, L3&L4 11/15/01 Title Date O&M Plan prepared by GEOD Consulting, Inc. 56R Rolad St. Boston, MA 02129 Title Date Title Date 5. Final Plans and Documents Signed and Stamped by: Michael J. Sergi, P.L.S.-sheet EX1 Benjamin W. Gary, Jr. R.L.A.-all sheets Christopher Emilius, P.E.-sheet L3 6. Total Fee: (from Appendix B:Wetland fee Transmittal Form) W aform5.doc•rev.1/11/02 Pageiof7 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands L11 WPA Form 5 - Order of Conditions 242-1065 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ® Public Water Supply ❑ Land Containing Shellfish ® Prevention of Pollution ® Private Water Supply N Fisheries ® Protection of Wildlife Habitat ® Groundwater Supply Z Storm Damage Prevention ® Flood Control Furthermore,this Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to ® the following conditions which are necessary, in accordance with the performance standards set forth in the wetlands regulations, to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. Wpaform&doc•rev.1/11/02 Page 2 of 7 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions 242-1065 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DEP"] "File Number 242-1065 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. Wpaform5.doc-rev.1/11/02 Page 3 of 7 L1Massachusetts Department of Environmental Protection DEP File Number. Bureau of Resource Protection - Wetlands 1 WPA Form 5 - Order of Conditions 242-1065 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings (cont.) Additional conditions relating to municipal ordinance or bylaw: See attached Conditions This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4, from the date of issuance. Date This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office (see Appendi7aendpr y owner(if different from applicant). Signatures: !v 'Al On 9t Of Jan/2002 Day Mont DA DIANE MAGEE Notary Public before me personally appeared Commonwealth of Massachusetts My Commission Expires Scott Masse Februa 14,2t1� to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. Psotary Pu is My Commission Expires This Order is issued to the applicant as follows: 71. by hand delivery on ❑ by certified mail, return receipt requested,on Date Date Wpaform5.doc•rev.1/2/02 Page 5 of 7 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands L11 WPA Form 5 Order of Conditions 242-1065 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form,as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L.c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. North Andover Conservation Commission Wpaform&doc•rev.1/2/02 Page 6 of 7 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands L11 WPA Form 5 - Order of Conditions 242-1065 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. -------------------------------------------------------------------------------------------------------------------------- To: North Andover Conservation Commission Please be advised that the Order of Conditions for the Project at: Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for. Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land,the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Wpaform5.doc•rev.1/2/02 Page 7 of 7 r1mMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Appendix E — Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Request Information Important: 1. Person or party making request(If appropriate, name the citizen group's representative): When filling out forms on the computer, Name use only the tab key to Mailing Address move your Cursor-do City/Town State Zip Code not use the return key. Phone Number Fax Number(if applicable) rab Project Location Mailing Address Btum City/Town State Zip Code 2. Applicant(as shown on Notice of Intent(Form 3), Abbreviated Notice of Resource Area Delineation (Form 4A); or Request for Determination of Applicability (Form 1)): Name Mailing Address City/Town State Zip Code Phone Number Fax Number(if applicable) 3. DEP File Number: B. Instructions 1. When the Departmental action request is for(check one): ❑ Superseding Order of Conditions ❑ Superseding Determination of Applicability ❑ Superseding Order of Resource Area Delineation Send this form and check or money order for$50.00, payable to the Commonwealth of Massachusetts to: Department of Environmental Protection Box 4062 Boston, MA 02211 wpafonn5.doc•Appendix E•rev.1/2/02 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Appendix E — Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Instructions (cont.) 2. On a separate sheet attached to this form, state clearly and concisely the objections to the Determination or Order which is being appealed. To the extent that the Determination or Order is based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. 3. Send a copy of this form and a copy of the check or money order with the Request for a Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP Regional Office(see Appendix A). 4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. wpaform5.doc•Appendix E•rev.1/2/02 Page 2 of 2 DEP FILE #242—1065 Foster Farm Fields Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 18. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. 19. This Order does not grant any property rights or any exclusive privileges,it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued,to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland ByLaw and Regulations, and may require any information, measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 20. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by- laws or regulations. 21. The work authorized hereunder shall be completed within three years from the date of this order. 22. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section VIII (B)(p.33) of the North Andover Wetland Regulations). 23. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. Order of Conditions 1 NACC 1/10/02 DEP FILE#242- 1065 Foster Farm Fields 24. Where the Department of Environmental Protection (DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 25. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 26. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 27. LIMITED PROJECT: Any future project which proposes a wetland crossing in order to access certain portions of the property will not be qualified as a limited project roadway under 310 CMR 10.53(e). 28. The proposed work includes: the construction of three athletic fields (grass with irrigation), a gravel access driveway with a paved entrance, a gravel parking lot for 100 cars,fencing,a vehicular control gate,and irrigation system. 29. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): Applicant: North Andover Division of Public Works 384 Osgood Street North Andover,MA 01845 Representative: Moriece&Gary Landscape Architects 56 Roland Street Charlestown,MA 02129 Plans Prepared by: Moriece&Gary Landscape Architects 56 Roland Street Charlestown,MA 02129 Record Plans: Foster Farm Fields North Andover,Massachusetts Sheets EX1 and Ll,L2,L3 and L4.Date: 11/15/01 Stamped by: Michael J.Sergi,P.L.S.-Sheet EXl Benjamin W.Gary,Jr.,R.L.A.-All sheets Christopher Emilius,P.E.-Sheet L3 O&M Plan prepared by: GEOD Consulting,Inc. 56R Roland Street Boston,MA 02129 Order of Conditions 2 NACC 1/10/02 DEP FILE#242— 1065 Foster Farm Fields 30. The following wetland resource areas are affected by the proposed work: Buffer Zone to Ephemeral Pool and Bordering Vegetated Wetland (BVW). These resource areas are significant to the interests of the Act and Town ByLaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 31. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as shown on the plans dated referenced herein. 32. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty five foot (251 No-Disturbance Zone and a fifty foot (501 No-Build Zone shall be established from the edge of the adjacent wetland resource area except as follows: a 50' No- Disturbance Zone and 75' No-Build Zone shall be established in the areas adjacent to the two vernal pools shown on the record plans. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No-Disturbance zone. (See Section III(D) &Appendix G of the local Regulations). 33. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission. 34. This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 35. The owners of the project and their successors in title, in the event they proceed to alter areas subject to the Commission's jurisdiction under the order, agree that the Order does not in itself impose upon the Town any responsibility to maintain the proposed drainage system and that said Town shall not be liable for any damage in the event of failure. By acceptance of this Order,the owners agree to indemnify and hold harmless to the Town and its residents for any damage attributable to alterations undertaken on this property pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. Maintenance of the drainage system, if accepted by the Town as part of a public way,becomes the responsibility of the Town. Order of Conditions 3 NACC 1/10/02 DEP FILE #242— 1065 Foster Farm Fields 36. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. PRIOR TO CONSTRUCTION 37. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 38. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 39. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words"Massachusetts DEP,File Number 242-1065." 40. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC 41. A plan shall be submitted prior to construction describing operational procedures for the proposed recreational fields. This plan shall include information on the placement of waste receptacles and the frequency,of trash pick-up and other site maintenance activities. Order of Conditions 4 NACC 1/10/02 DEP FILE#242—1065 Foster Farm Fields 42. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 43. Prior to any work commencing on-site, the applicant shall submit to the NACC for approval, a detailed sequence of construction, including the construction of compensation and retention areas, installation of sedimentation/erosion control devices and re-vegetation to be completed before other work begins on-site. 44. Wetland flagging shall be checked prior to start of construction and shall be re- established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with stakes or flags and shall be confirmed by the NACC. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this line at any time. All flags used for the above purposes shall be of a color different from other flagging used on the site. 45. A row of staked hay bales backed by trenched siltation fence shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commission's request. 46. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of 50 hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 47. A check payable to the Town of North Andover shall be provided in the amount of $10;000 which shall be in all respects satisfactory to Town Counsel,Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or Order of Conditions 5 NACC 1/10/02 DEP FILE#242—1065 Foster Farm Fields parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provisions, satisfactory to the NACC, have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. 48. The applicant shall be responsible for placing signs on each parcel designating the applicable lot number as depicted on the plans approved and referenced herein. 49. The applicant shall designate a Wetland Scientist as an"Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site, during any 24-hour period, including weekends. This person shall be given the authority to stop construction for erosion control purposes. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. At least once during each week in which construction activities occurs on-site and for as long thereafter as ground remains unstabilized, the applicant shall submit a written report from the "Erosion Control Monitor"to the NACC certifying that, to the best of his/her knowledge and belief based on a careful site inspection, all work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation, turbidity,and/or other water quality impacts. 50. Prior to construction,the applicant shall permanently mark the edge of the"50'No- Disturbance Zone" adjacent to the two ephemeral pools and the 25' No- Disturbance Zone adjacent to the remaining wetlands (as shown on the site plan of record) with signs or markers spaced evenly every 50 feet incorporating the following text: "Protected Wetland Resource Area This will designate their sensitivity and assure no further inadvertent exicroachment into the wetland. These permanent markers are subject to review and approval by the NACC. The applicant shall instruct all agents to explain these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. 51. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring, or assigning any portion of said land to another party,subject to said Orders of Conditions,the "Compliance Certification Form Affidavit"attached via "Appendix A" signed under the pains and penalties of perjury, stating that said applicant and/or owner has read these Orders of Conditions and is in compliance Order of Conditions 6 NACC 1/10/02 DEP FILE#242— 1065 Foster Farm Fields with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5) business days prior to the closing of said land transaction. 52. Once these above mentioned pre-construction requirements are complete, the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative, the contractor, the engineer,wetland scientist and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre- construction meeting(e.g. 72 hours). DURING CONSTRUCTION 53. Upon beginning work, the applicant shall submit written progress reports every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 54. All leach basins shall contain a pre-treatment device (i.e. AquaShieldTM Filter System or its equivalent). The pre-treatment device in the leaching basins shall be permanently maintained. All leaching basins shall be free of all accumulated silt and debris before a Compliance is issued and the owner or his/her agent shall so specify in the request for Compliance. 55. De-watering activities anticipated at the roadway entrance location shall be supervised and witnessed by the designated erosion control monitor. This designee must be on-site while work specific to the roadway retaining wall installation is occurring and until this section is complete. De-watering activities shall be conducted as shown on the approved plans and shall be monitored daily by the erosion control monitor to ensure that sediment laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland ByLaw. If emergency de-watering requirements arise, the applicant shall submit a contingency plan to the Commission for approval which provides for the pumped water to be contained in a settling basin,to reduce turbidity prior to discharge into a resource area. Order of Conditions 7 NACC 1/10/02 0 DEP FILE#242—1065 Foster Farm Fields 56. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire ,lath , paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the foregoing. 57. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC. 58. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 59. There shall be no stockpiling of soil or other materials within twenty-five(25)feet of any resource area. 60. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system,or wetland resource area. 61. All waste generated by, or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local ByLaw. 62. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 63. During and after work on this project,there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication,or maintenance is to be done within 100 feet of a resource area. STORMWATER MANAGEMENT CONDITIONS 64. All construction and post-construction stormwater management shall be conducted in accordance with supporting documents submitted with the Notice of Intent,the Department of Environmental Protection Stormwater Management Policy and as approved by the NACC in this Order of Conditions. 65. All stormwater best management practices shall be maintained as specified in the Operation and Maintenance Plan submitted with the Notice of Intent and Order of Conditions 8 NACC 1/10/02