Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TOWN OF NORTH ANDOVER (7)
y Town of North Andover NORTF► OftTau`a'�q. Office of the Planning Department Community Development and Services Division • - 27 Charles Street North Andover,Massachusetts 01845 1Ss�cuus�s Telephone(978)688-9535 Fax(978)688-9542 Notice Of Decision Any appeal shall be filed Within(20)days after the Date of filing this Notice mar In the Office of the Town Clerk r Date of Issuance:February 18,2004 Date of Hearing:January 20,2004, N February 3,2004,February 171, 2004(decision) Petition of: DiNisco Design Partnership,Limited, 87 Summer Street,Boston,MA 02210 Premises Affected: North Andover High School, 675 Chickering Road,North Andover,MA, Map 84, Lot 29,Map 84,Lot 30, Map 92, Lot 2, Map 92,Lot 3,Map 94, Lot 3, Map 94, Lot 4, Map 94, Lot 5,Map 100,Lot 5. Referring to the above petition for Modification to a Site Plan Review Special Permit. The application was determined to be complete and was noticed and reviewed in accordance with the Sections 8.3, 10.3 and 10.31 of the Town of North Andover Zoning Bylaw and MGL c.40A,sec.9 So as to allow: Amendments to the site plan special permit for revisions to playfield layouts; substituting synthetic turf for natural turf; addition of a running track, bleachers,press box/concession/toilet/storage building,field lighting and a storage building;and repaving of existing tennis courts. After a public hearing given on the above date,the Planning Board voted to APPROVE, the Site Plan Review Special Permit,based upon the attached conditions: Cc: Applicant Signed: d Engineer Julie Parrin ,Town Pknner Abutters on behalf of: DPW Alberto Angles,Chairman Building Department George White,Vice Chairman Conservation Department Felipe Schwarz,Clerk- Health Department John Simons MA Richard Nardella James Phinney,Associate Member BWkRD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Site Plan Review-Special Permit-AMENDMENT 675 Chickering Road—North Andover High School The Planning Board herein approves the amendment to the Site Plan Special Permit for the construction of a 300,649 square foot high school building approved by the Planning Board on May 14, 2001. The amendment includes changes to the northern and southern playfields including the construction of a synthetic material track field complex in the northern field that will host field hockey, soccer, a high jump area and three pole vault areas. In addition, a 720 s.f storage building, bleachers for approximately 250 people, a scoreboard and a retaining wall will be added in the northern playfield. Changes to the southern playfield include reconfiguration of the two originally proposed soccer fields to the west into one synthetic turf field to be utilized for football, soccer and lacrosse. This field will be lighted and bleachers for approximately 1200 people, a press box, a 3,615 s.f concession stand, toilet and storage building are proposed to be constructed north of this playfield. Grading of the two fields to the east have been revised to allow for potential future softball use. Resurfacing of the existing tennis courts will be included under this Amendment to the Special Permit. This Special Permit amendment was requested by DiNisco Design Partnership,Limited, 87 Summer Street, Boston, MA 02110 for the property owned by the North Andover School Department, 43 High Street, North Andover, MA 01845, for property located at 675 Chickering Road,North Andover, MA. This application was filed with the Planning Board on December 2, 2003. The applicant submitted a complete application which was noticed and reviewed in accordance with Sections 8.3, 10.3, and 10.31 of the Town of North Andover Zoning Bylaw and MGL Chapter 40A, Section 9. The Planning Board makes the following findings as required by the North Andover Zoning Bylaws Section 8.3 and 10.3: FINDINGS OF FACT: 1. This Special Permit is being issued as an Amendment to the Special Permit issued on May 14, 2001 for construction of the school facility. All conditions outlined in the original Special Permit remain in effect. 2. The specific site is an appropriate location for the project as it is located within a Residential 2 Zone and the modified use is accessory to the permitted high school facility. 3. The modified use of the playfields as developed will not adversely affect the neighborhood. Landscaping is provided and no additional parking spaces have been created as a result of the modifications to the playing fields. 4. There will be no nuisance or serious hazard to vehicles or pedestrians. The modification did not require an additional traffic review study nor has the accesslegress drives to the site been substantially altered. l 7 ' 5. The landscaping approved as a part of this plan meets the requirements of Section 8.4 as amended by the Planning Board, of the North Andover Zoning Bylaw; 6. The modified site drainage system is designed in accordance with the Town Bylaw requirements and has been reviewed and approved by the Outside Consulting Engineer, Vanasse, Hangin,Brustlin,Inc. 7. The applicant has met the requirements of the Town for Site Plan Review as stated in Section 8.3 of the Zoning Bylaw. 8. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. The project is extending municipal water, sewer and utilities to the property to adequately address the needs of the project. Finally the Planning Board finds that the project modifications generally complies with the Town of North Andover Zoning Bylaw requirements as listed in Section 8.3(5) but requires conditions in order to be fully in compliance. The Planning Board hereby grants the modification approval to the applicant provided the following conditions are met: SPECIAL CONDITIONS: 1. Prior to the endorsement of the revised plans by the Planning Board, the applicant must comply with the following conditions: a) The final plan must be reviewed and approved by the DPW, VHB and the Town Planner and subsequently endorsed by the Planning Board. The final plans must be submitted for review within ninety days of filing the decision with the Town Clerk. 2. Prior to FORM U verification(Building Permit Issuance): a) The Planning Board must endorse the final site plan mylars and three (3) copies of the signed plans must be delivered to the Planning Department. b) One certified copy of the recorded decision must be submitted to the Planning Department. 3. The outdoor lighting facilities associated with southern playfield must be constructed in accordance with the approved referenced plan sheets, SKZ-1.20 and SKZ-1.20A. The lights shall not cast glare onto any residential premises or onto any portion of a way so as to create a traffic hazard. 4. Any signage plans must conform to Section 6, Signage and Outdoor Lighting 2 Regulations of the Town of North Andover Zoning Bylaw and must be approved by the Building Department. In no way is the applicant to construe that the Planning Board has reviewed and approved signage plans, associated with either the playfields or the concession stand, for Zoning Compliance, as that is the jurisdiction of the Building Department. 5. Prior to verification of the Certificate of Occupancy(concession stand): a) The applicant must submit a letter from the architect and engineer of the project stating that the building, signs, landscaping, lighting and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. 6. The applicant must continue to retain the services of an Environmental and Construction Monitor as outlined in the original Special Permit and monthly reports shall be submitted to the Planning Department throughout the construction duration of the project. 7. Upon completion of the installation of the outdoor light structures associated with the southern playfields, the Planning Department must be contacted to arrange a night visit to review and confirm the lighting does not cast a glare onto residential premises or onto any portion of a way so as to create a traffic hazard. 8. Any action by a Town Board, Commission,or Department,which requires changes in the plan or design of the building, as presented to the Planning Board, may be subject to modification by the Planning Board. 9. Any revisions shah be submitted to the Town Planner for review. If these revisions are deemed substantial, the applicant must submit revised plans to the Planning Board for approval. 10. Upon Completion of the Project: a) The Planning Staff shall review the site. Any screening as may be reasonably required by the Planning Staff will be added at the applicant's expense. b) A final as-built plan showing final topography, the location of all on- site utilities, structures, curb cuts, playfields, parking spaces and drainage facilities must be submitted to and reviewed by the Planning Staff and the Division of Public Works. 3 11. The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control. 12. The fallowing information shall be deemed part of the decision: Application Package including: DiiNisco Design Partnership Limited Hand Delivered Letter Dated 02 December 2003, including Attachment 1: Table of Contents, Attachment 2: Application for Site Plan Special Permit, Attachment 3: Memorandum (29 October 2003), Attachment 4: Rendered Site Plans,Attachment 5: Letter from Rick Rice to North Andover Building Department, Attachment 6: Request to Amend the Conservation Commission Order of Conditions (24 October 2003), Attachment 8: Certified Abutters List, Attachment 9: Previous Site Plan application; Plans Titled: North Andover High School Athletic Complex,North Andover, Massachusetts Prepared For: North Andover School Department 675 Chickering Road,North Andover, MA 01845 Prepared By: DiNisco Design Partnership,Limited 87 Summer Street Boston,MA 02110;& Gale Associates,Inc.,Engineers,Architects Planners, 163 Libbey Parkway, Weymouth,MA 02819 Scale: Varies,typically 1"=30' or 1"=40' Sheets: SKZ-1.1-1.1A(North Fields-Layout,Materials &Planting plan) (Dated 1/20/04& 1/6/04; SKZ-1.2. (North Fields-Grading&Erosion Control Plan)(Dated 1/20/04); SKZ-1.3(North Fields-Utility Plan)(Datedl/20/04); SKZ-1.4 (North Fields-Drainage Layout Plan)(Dated 1/20/04); SKZ-1.5(South Fields-Layout,Materials&Planting Plan)(Dated 11/24/03); SKS 1.6(South Fields-Grading&Erosion Control Plan)(Dated 1/20/04); SKZ-1.7)South Fields-Irrigation Layout Plan) (Dated 11/24/03); SKZ-1.8(South Fields-Utility Plan) (Dated 11/24/03); SKZ-1.9(South Fields-Drainage Layout Plan)(1/20/04); SKZ-1.10(Details Sheet)(Dated 1/20/04); SKZ-1.11(Details Sheet)(Dated 1/20/04); 4 SKZ-1.12(Details Sheet)(Dated 11/24/03); SKZ-1.13(Details Sheet)(Dated 11/24/03); SKZ-1.14(Details Sheet) (Dated 11/24/03); SKZ-1.1 5(Details Sheet)(Dated 11/24/03); SKZ-1.1 6(Bleacher Layout Sheet)(Dated 11/24/03); SKZ-1.17(Bleacher Detail Sheet) (Dated 1/20/04); SKZ-1.18(Bleacher Foundation Plan) (Dated 11/24/03); SKZ-1.19(Bleacher Detail Sheet) (Dated 11/24/03); SKZ-1.20 (Lighting Layout Plan&Details) (Dated 11/24/03); SKZ-1.20A(Lighting Level Plan) (Dated 11/24/03); SKZ-1.21 (Tennis Courts Existing Conditions and Demolition Plan) (Dated 11/24/03); SKZ-1.22 (Tennis Courts Layout&Grading Plan)(Dated 11/24/03); SKZ-1.23 (Tennis Court Detail Sheet)(Dated 11/24/03); SKZ-3.1 (Floor Plans)(Dated 10/24/03); SKZ-3.2(Exterior Elevations)(10/24/03); 1.3.7(Stormwater Drainage Plan-North)(Dated 1/25/02); 1.3.8(Stormwater Drainage Plan-Middle) (Dated 1/25/02); 1.3.9(Stormwater Drainage Plan-South)(Dated 12/14/01); 1.3.10(Stormwater Drainage Plan-North)(Dated 12/14/01); 1.3.11 (Stormwater Drainage Plan-North) (Dated 12/14/01); Report Titled: Revised Stormwater Management Design& Stormwater Runoff Calculations for the Proposed Athletic Field Revision,Revised January 6,2004; Prepared By: Schofield Brothers ofNew England, Inc. 1071 Worcester Road Framingham,MA 01701,in cooperation with Gale Associates Inc., 163 Libbey Parkway Weymouth, MA 02189; Report Titled: North Andover High School Proposed Athletic Complex Stormwater Management Design and Runoff Calculations; Revised Report, October 24, 2003, prepared. by Gale Associates, Inc. 163 Libbey Parkway; Weymouth, MA 02189; Letters/Correspondence/Reviews: VHB review letter addressedto Ms. Julie Parrino, Planning Director, dated January 13, 2004 (6 pages); 5 Schofield Brothers response letter addressed to VHB dated January 22, 2004 (10 pages including Modified Post Development Conditions Watershed Map dated 1/20/04); Memorandum prepared by Dale Harris of Gale Associates addressed to Ms. Julie Parrino, Planning Director, dated January 23, 2004(4 pages); VHB final review letter addressed to Ms. Julie Parrino, Town Planner, dated January 27, 2004 (1 page); cc: Applicant Engineer File 6 s LlMassachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File"umber: WPA Form 5 - order of Conditions 242-1045 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: From: When filling out forms on North Andover the computer, Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do ❑ Order of Conditions not use the return key. ® Amended Order of Conditions t� To: Applicant: Property Owner(if different from applicant): North Andover School Committee Town of North Andover Name Name 43 High Street 400 Osgood Street Mailing Address Mailing Address North Andover MA. 01845 North Andover MA. 01845 City/Town state Zip Code City/Town state Zip Code 1. Project Location: 675 Chickering Roan,-,. North Andover Street Address , City/Town Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex North 1170 337 County Book Page Certificate(if registered land) 3. Dates: 10/6/00 1/28/04 2/19/04 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents(attach additional plan references as needed): See Attached Title Date Title Date Title Date 5. Final Plans and Documents Signed and Stamped by: Dale Harris, P. E. Name ,I 6. Total Fee: N/A (from Appendix B:Wetland Fee Transmittal Form) Wpaform5.doc•rev.12/15/00 Page 1 of 7 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP 1045 File"umber: 242-1 WPA Form 5 - Order of Conditions 0 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ® Public Water Supply ❑ Land Containing Shellfish ® Prevention of Pollution ® Private Water Supply ❑ Fisheries ® Protection of Wildlife Habitat ® Groundwater Supply ® Storm Damage Prevention ® Flood Control Furthermore,this Commission hereby finds the project,as proposed, is: (check one of the following boxes) Approved subject to: ® the following conditions which are necessary, in accordance with the performance standards set fprth in the wetlands regulations,to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions.modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intend fFiese conditions shall control Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act.Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is necessary is attached to this Order as pe010 CMR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. Wpaform5.doc-rev.12/15/00 Page 2 of 7 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP We"Umber: WPA Form 5 -� Order of Conditions 242-1045 L11 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath, paper; cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Ind under the name of the owner of the land upon which the proposed work is to be done. In the ca?.-of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection"[or, "MA DEP"] "File Number 242-1045 " 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. Wpaform5.doc•rev.12/15/00 Page 3 of 7 AMENDMENT-NORTH ANDOVER HIGH SCHOOL-242-1045 At their meeting of January 28, 2004, The North Andover Conservation Commission(NACC)voted unanimously to amend the Order of Conditions associated with the design and use of the North and South Playfields, in addition to the repaving of the existing tennis courts. Amendments to the North Playfield include the construction of a synthetic material Track and Field complex with associated storage building, bleachers, scoreboard and retaining wall, which were originally designed and approved as two soccer fields. Amendments to the South Playfield include reconfiguration of two soccer fields into one synthetic. turf field. Condition#28 of the Order of Conditions shall be amended to include the following record documents associated with the approval: Site Plans prepared by: Gale Associates,Inc. 163 Libbey Parkway Weymouth,MA 02819-0004 Entitled: North Fields-Layout,Materials& Planting Plan- SKZ-1.1,dated November 24,2003; Npxth Fields.-Layout,Materials& Planting Plan-Sheet 2- KZ-LlA ,dated January 6,2004; North Fields-Grading& Erosion Control Plan-SKZ-1.2, dated November 24,2004,final revised date 1/6/04; - North Fields-Utility Plan-SKZ-1.3,dated November 24,2003, final revised date 1/19/04; North Fields-Drainage Layout Plan-SKZ-1.4,dated October 24,2003,final revised date 1/19/04; South Fields-Layout,Materials& Punting Plan-SKZ-1.5, dated November 24,2003; South Fields-Grading& Erosion Control Plan-SKZ- 1.6, dated November 24,2003; South Fields-Irrigation Layout Plan-SKZ-1.7,dated November 24,2003; South Fields-Utility Pun-SKZ- 1.8,dated November 24,2003; South Fields-Drainage Layout Plan-SKZ-1.9, dated November 24, 2003,final revised date 1/6/04; Details Sheet SKZ 1.10& SKZ 1.11,dated November 24,2003, final revised date 1/6/04; Details Sheet-SKZ-1.12-SKZ-1.15,dated November 24,2003; Bleacher Layout Plan-SKZ-1.16,dated November 24,2003 Bleacher Detail Sheet-SKZ-1.17,dated November 24,2003, final revised date 1/6/04; Bleacher Foundation Plan--SKZ-1.18,dated November 24, 2003; Bleacher Detail Sheet-SKZ 1.19,dated November 24,2003; AMENDMENT-NORTH ANDOVER HIGH SCHOOL-242-1045 Lighting Layout Plan & Details-SKZ- 1.20,dated November 24,2003; Lighting Level Plan SKZ-1.20A,dated November 24,2003; Tennis Courts Existing Conditions & Demolition Plan-SKZ- 1.21, dated November 24,2003; Tennis Courts Layout& Grading Plan-SKZ-1.22, dated November 24,2003; Tennis Court Detail Sheet-SKZ- 1.23,dated November 24, 2003; Site Details, Sheets 1.1.25- 1.1.27,dated December 14,2001; Site Details,Sheet 1.1.29,dated December 14,2001; Site Details, Sheet 1.1.31,dated December 2001,last revised date, January 31,2002; Irrigation Details,Sheet 1.1.32,dated December 14,2001; Planting Details,,Sheet 1.1.33,dated December 14,2001, last revised date,January 31,2002; Floor Plans, Sheet 3.4.1,dated September 10,2003; Modified Post Development Conditions Watershed Map Plan, Sheet D-2A,dated October 24,2004,last revised date 12/30103. Reports: Revised Stormwater Management Design and Stormwater Runoff CAlculations For the Proposed Athletic Field Revision,dated 4, ary 6,2004. Prepared by Schofield Brothers of New England,Inc. 1071 Worcester Road Framingham,MA 01701 Wildlife Habitat Evaluation,prepared by Epsilon Associates Inc., dated January 5,2004 Letters: Eggleston Environmental Stormwater Management Reviews, dated November 5,2003,December 3,2003,and January 14,2004 The Commission finds that the following additional condition necessary and shall be included as a part of this Amendment: The resource areas and their associated buffer zones shall be policed on a monthly basis for loose/uncontained trash and/or debris and such trash and/or debris shall be properly disposed of This condition shall remain in perpetuity and shall survive the issuance of a Certificate of Compliance. Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands LI WPA Form 5 - Order of Conditions 242- JOU Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings cont. 9 (cont.) Additional conditions relating to municipal ordinance or bylaw: See Attached This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4,from the date of issuance. Date • This Order must be signed by a majority of the Conservation Commission.The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant.A copy also must be mailed or hand delivered at the same time to th ppropriate Department of Environme Protection Regional Office(see Appendix A)and the pro rty owner(if different from applica Sign res: r On l /4k Of o c) Day Month and Year before me personally appeared J to me known to be the person described in and who executed the foregoing instrument and acknowl ged that he/she executed the same as his/her free act and deed. No ry Public or My Com(niss"ibn Expires This Order is issued to the applicant as follows: ❑ by hand delivery on W(by certified mail, return receipt requested,on Q g ® Date Da e Wpaform5.doc•rev.12/15/00 Page 5 of 7 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File"umber: WPA Form 5 - Order of Conditions 242-1045 . Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Providedby DEP B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Findings as to municipal bylaw or ordinance Furthermore, the North Andover hereby finds (check one that applies): Conservation Commission ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Municipal Ordinance or Bylaw Citation Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: North Andover Wetland Protection Bylaw Chapter 178 Municipal Ordinance or Bylaw Citation The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. Wpaform5.doc•rev.12/15/00 Page 4 of 7 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 5 Order of Conditions 242-1045 1 Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ldle'llcle ( C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be.�:}oted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. Ir.Qhe case of registered land,this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. North Andover Conservation Commission Wpaform5.doc•rev.12/15/00 Page 6 of 7 Massachusetts Department of Environmental Protection DEP File Number: Ll Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions242-1045 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP 0/ D. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. --------------------------------------------------------------------------------------------------------------------------- To: North Andover Conservation Commission Please be advised that the Order of Conditions for the Project at: 242-1045 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Wpaform5.doc•rev.12/15/00 Page 7 of 7 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Appendix E - Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 r, 0 A. Request Information Important: 1. Person or a makingrequest (If appropriate, name the citizen group's representative): When filling out forms on the computer, Name use only the tab key to Mailing Address move your cursor- do City/Town State Zip Code not use the return key. Phone Number Fax Number(if applicable) raD Project Location Mailing Address rsawn CitylTown State Zip Code 2. Applicant;(as shown on Notice of Intent(Form 3), Abbreviated Notice of Resource Area Delineation (Form 4A); or Request for Determination of Applicability (Form 1)): Name `c. Mailing Address Cityrrown State Zip Code Phone Number Fax Number(if applicable) 3. DEP File Number: B. Instructions 1. When the Departmental action request is for(check one): ❑ Superseding Order of Conditions ❑ Superseding Determination of Applicability ❑ Superseding Order of Resource Area Delineation Send this form and check or money order for$50.00, payable to the Commonwealth of Massachusetts to: Department of Environmental Protection Box 4062 Boston, MA 02211 wpaform5.doc•Appendix E•rev.2/19104 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Appendix E - Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Instructions (cont.) 2. On a separate sheet attached to this form, state clearly and concisely the objections to the Determination or Order which is being appealed. To the extent that the Determination or Order is based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. 3. Send a copy of this form and a copy of the check or money order with the Request for a Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP Regional Office(see Appendix A). 4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. wpaform5.doc•Appendix E•rev.2/19/04 Page 2 of 2 f 1 Massachusetts Department of Environmental Protection I DEP File Number. Bureau of Resource.Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 242-1045 L11 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: When filling out 1. Applicant: forms the computer, use North Andover School Committee Name only the tab key to move 675 Chickering Road your cursor- Mailing Address do not use the North Andover MA. 01845 return key. City/Town State Zip Code 2. Property Owner(if different): IL 0 Town of North Andover Name 400 Osgood Street Mailing Address North Andover MA. 01845 City/Town State Zip Code B. Finding Information The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on: 3/1/01 Date for work at: 675 Chickering Road Street Address Assessor's Map/Plat Number Parcel/Lot Number recorded at the Registry of Deeds for: Essex North 1170 337 County Book Page Certificate(if registered land) is hereby extended until: 3/1/05 Date This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest extension. Only unexpired Orders of Conditions or Extension may be extended. Date the Order was last extended (if applicable): Date Issued by: North Andover Conservation Commission �I wpaformTdoc•rev.12/15/00 Page 1 of 3 I R Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 242-1045 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Finding Information (cont.) This Order of Conditions Extension must be signed by a majority of the Conservation Commission and a copy sent to the applicant and the appropriate DEP Regional Office (see Appendix A). Signatures: On 17 - h Of d oo Y Day Month and Year before me personally appeared f+ MC,s�,z_ to me known to be the person described in and who executed the foregoing instrument and acknowledged. that he/she executed the same as his/her free act and deed. DONNA M.WEDGE ti PUDUC Notary Public My Com WO&W01611FATHOFppg Mp CammR �D7 C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions(see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach page 3 of Form 7 and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. IIS wpaform7.doc•rev.12/15/00 Page 2 of 3 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File"Umber: WPA Form 7 Extension Permit for Orders of Conditions 242-1045 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Recording Confirmation (cont.) To: North Andover Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: 675 Chickering Road 242-1045 Project Location DEP File Number has been recorded at the Registry of Deed of: County for: Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: Date Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpaformTdoc•rev.12/15/00 Page 3 of 3 ►h/�► iCs r P Limita r ch i t e c t s a n d p l a n n e r s ed HAND DELIVERED 02 December 2003 Heidi Griffin North Andover Planning Board 27 Charles Street North Andover, MA 01845 Reference: North Andover High School Athletic Complex North Andover, MA Subject: Request to Amend the Notice of Decision Dear Heidi and Planning Board Members: We submit to the Planning.Board a Request to Amend the Notice of Decision for the Site Plan' Special Permitfo'rahe North Andover High School project. We are requesting approval to modify the approved site plan for the northern playfields, the,southern playfields and to repave the existing tennis courts. Our'submission,includes the materials]isted below(some of the materials; as noted, have been previously submitted with a draft application for preliminary review): • Application-(10)copies total of Which'(3) are time stamped; one is the signed original.. • Plan Sets—{10)copies of which (3) are full size and (7)are half size.(Z Copies of the half-size plan set previously submitted with draft application) • Request to Amend the Conservation Commission Order;of Conditions (3) copies with full size drawings. (1 Copy previously submitted with draft application) • Previous-Application for Site Plan Special Permit-(1) copy. (Previously submitted with draft application) • Plans as Approved,excerpted from the Construction Document Set.—(2) full size copies. (1 Copy previously submitted with.draft-application) • Two sets of envelopes addressed to abutters and thirty envelopes not addressed, all with the required postage. Kenneth DiNisco Richard N.Rice Gary E.Ainslie Christopher Huston Donna DiNisco 8 7 S u m m e r S-t r e e"t B o s t o n M A 02 1 1 U , 6 1 7 . 4 2 6 . 2 8 5 8 f a z 4 2 6 „1 4 5 7 www . diniSeo,: com Heidi Griffin, 02 December 2003 Page 2 If there are any questions please do not hesitate to contact Rick Rice or myself. Sincerely Jon Ox an AIA ' e DiNISC DESIGN ro cc: Timothy McIntosh., Vanasse Hangen Brustlin,Inc. Louis Minicucci (Attachments 1 4 only) Paul Szymanski Nancy Kurtz Patrick Saitta Kenneth DiNisco (Attachments 1-4 only) Richard Rice (Attachments 1 -4 only) Enclosures: Attachments 1 9,LF1 =LF2 (See Table of Contents,Attachment 1). 99430.0 CorlPlanDeptl[LlskePMRvwAppl-AmemW4verLtr 02 ►1�/V�Jl,4NParchitects and planners Limited NORTH ANDOVER HIGH SCHOOL ATHLETIC COMPLEX NORTH ANDOVER, MA REQUEST TO AMEND THE NOTICE OF DECISION ATTACHMENT 1 TABLE OF CONTENTS 29 October 2003 Table of Contents (29 October 2003) ................. . ........ .................... .......Attachment 1 Application.for Site Pian Special Permit........ . ............ . ............ .................. Attachment 2 Memorandum (29 October.2003) ..... ..... .......... . ......... .. ............... ............Attachment 3 Rendered Site Plans..... ................. ............... ............ .:............ ...... .........Attachment 4 • Proposed Site Plan o Athletic Complex Site Plan(29 October 2003) o Athletic Complex,Site Plan-North Fields (29 October 2003) o Athletic Complex Site Plan—South Fields(29 October 2003) • Site Plan as Approved (11 May 2001) Letter from Rick Rice to North Andover Building Department Athletic Fields Upgrade/ Parking Counts (28 October 2003) ... .. ..:... ..... .....Attachment 5 Request to Amend the Conservation Commission Order of Conditions(24 October 2003)................ ......... .. ............ ............I... Attachment 6 Note: The cover letter and introduction to Stormwater Management Design and Runoff Calculations have been included in all sets. A complete copy of the application with three full size drawing sets have been forwarded to the Planning Board as requested and one copy of the application and full size drawing set.forwarded to VHB. Certified Abutters List(13 August 2003)..............:......... ........... ....... ... ....... Attachment 8 North Andover High School Previous Application for Site Plan Special Permit(16 Febuary 2001).... ........ Attachment 9 Note: Only one copy of this attachment has been forwarded to both ` Planning Board and VHB as requested. Kenneth DiNiseo Richard N.Rice Gary E.Ainslie, Christopher Huston Donna DiNisco 8 7 Summer Street B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4.5 7 www . dinisco . com Attachment 1 —Table of Contents- North Andover High School Page 2 LARGE FORMAT ATTACHMENTS PROPOSED PLANS North Andover High School Athletic Complex (24 October 2003)............... Attachment LF1 SKZ-T.1 Title Sheet SITE SKZ-1.1 North Fields—Layout, Material& Planting Plan SKZ-1.2 North Fields—Grading& Erosion Control Plan SKZ-1.3 North Fields—Utility Plan SKZ-1.4 North Fields Drainage Layout Plan SKZ-1.5 South Fields-Layout, Material& Planting Plan SKZ-1.6 South Fields—Grading & Erosion Control Plan SKZ-1.7 South Fields- Irrigation Layout Plan SKZ-1.8 South Fields—Utility Plan SKZ-1.9 South Fields—Drainage Layout Plan SKZ-1.10 Detail Sheet SKZ-1.11 Detail Sheet SKZ-1.12 Detail Sheet SKZ-1.13 Detail Sheet SKZ-1.14 Detail Sheet SKZ-1.15 Detail Sheet SKZ-1.16 Bleacher Layout Plan SKZ-1.17 Bleacher Detail Sheet SKZ-1.18 Bleacher Foundation Plan SKZ-1.19 Bleacher Detail Sheet SKZ-1.20 Lighting Layout Plan&Details SKZ-1.20ASite Lighting Calculation Plan SKZ-1.21 Tennis Courts Existing Conditions and Demolition Plan SKZ-1.22 Tennis Courts Layout& Grading Plan SKZ-1.23 Tennis Court Detail Sheet ARCHITECTURAL SKZ-3.1 Bleacher Building- Plans SKZ-3.2 Bleacher Building Elevations Attachment 1 —Table of Contents—North Andover High School Page 3 PLANS AS APPROVED North Andover High School (14 December 2003) Conformed Drawings Include Addenda 1 —4 (31 January 2002) Excerpt.................................................................... ...............................Attachment LF2 Note: Only two full size copies of this drawing set have been forwarded to the Planning Board as requested and one full size set forwarded to VHB. T-1 Title Sheet Volume 1 T-1 Title Sheet Volume 2 SITE 1.1.1 Materials Plan - Overview 1.1.2 Materials Plan - North 1.1.3 Materials Plan - Middle 1.1.4 Materials Plan South 1.1.6 Layout Plan- Overview 1.1.7 Layout Plan - North 1.1.8 Layout Plan- Middle 1.1.9 Layout Plan - South 1.1.11 Grading Plan - Overview 1.1.12 Grading Plan North 1.1.13 Grading Pian - Middle 1.1.14 Grading Plan South 1.1.16 Planting Plan - Overview 1.1.17 Planting Plan - North 1.1.18 Planting Plan - Middle 1.1.19 Planting Plan - South 1.2.0 Site Utilities Legends& Utilities 1.2.1 Site Utilities- Overall Site Plan 1.2.2 Site Utilities Site Utilities Site Plan Part A 1.2.3 Site Utilities- Site Utilities Site Plan Part B 1.2.4 Site Utilities Site Utilities Site Plan Part C 1.3.6 Stormwater Drainage Pian -Overview 1.3.7 Stormwater Drainage Plan - North 1.3.8 Stormwater Drainage Plan - Middle 1.3.9 Stormwater Drainage Plan -.South ELECTRICAL 10.1.2 Electrical Site Plan 10.1.4 Site Lighting Plan Sheet#1 10.1.5 Site Lighting Plan - Sheet#2 10.1.7 Lighting Fixture Schedule E-1 Site Lighting Calculation Plan E-2 Site Lighting Calculation Plan 99430.0 CorlPlanDept/lllsitePlnRvwrAppl-Amend/OI-Memo See Section 8.3 of the!North Andover Zoning Bylaw for more detailed information Town of North Andover Planning Board w t Please type or print clearly: 1. Petitioner: DiNisco Design Partnership,Limited Address: 87 Summer Street,Boston MA 02110 Telephone Number: (617)426-2858 2. Owners of the Land: North Andover School Department Address: 43 High Street,North Andover MA 01845 Telephone Number: 978-794-1503 Number of years ownership: 32 If applicant is not the owner,please state interest in property: Architect 8.3-2.a.i& 8.3-8.c 3. Request for a Special Permit under Section of the North Andover Zoning Bylaw to Request to amend the site plan special permit for: Revising playfield layout; substituting synthetic turf for natural turf at some fields, adding a running track,bleachers, press box/concession/toilet/storage building, field lighting,and a storage building; and repaving the existing tennis courts. See attached memorandum for additional detail. 4. Location of Property: 675 Chickering Road,North Andover MA 01845 Zoning District: Residential 2 Assessors: Map: 84 Lot# 29 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 84 Lot# 30 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 92 Lot# 2 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 92 Lot# 3 Registry of Deeds: Book#: 1170 Page# 337 Assessors Map: 94 Lot# 3 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 94 Lot# 4 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 94 Lot# 5 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 100 Lot# 5 Registry of Deeds: Book#: 1170 Page# 335 5. ExistingLot: Lot Area (Sq. Ft): 2,100,463 SF Building Height: 42 Street Frontage; 2,900+/-FT Side Setbacks: 1,760 FT/340 FT Font Setback: ' 162 FT Rear Setback: 374 FT Floor Area Ration: 0.10:1 Lot Coverage: 7% 6. Proposed Lot(if applicable): Lot Area(Sq.Ft.) 2,100,463 SF Building Height:40 FT(3 story)/50 FT(aud/gym) Street Frontage: 2,900+/- SF Side Setback: 230 FT/840 FT Front Setback: 32 FT Rear Setback: 150 FT Floor Area Ratio: 0.15:1 Lot Coverage: 8.3% 7. Required Lot(as required by Zoning Bylaw); Lot Area (Sq.Ft.): 43,560 SF Building Height: 65 FT(SECT 7.4.4) Street Frontage: 150 Fr Side Setback: 30 FT Front Setback: 30 FT Rear Setback: 30 FT Floor Area Ratio: N/A Lot Coverage: N/A & Existing Building(if applicable): Ground Floor(Sq.Ft.)148,743 SF #of Floors 2 Total Sq.Ft.; 204,471 SF Height: 42 FT Use: N/A Type of Construction:N/A 9. Proposed Building: High School Ground Floor(Sq.Ft.)_171,378 SF #of Floors 3 Total Sq.Ft.; 300,649 SF Height: 48 FT Q story/50 FT aud/gym) Use: Educational Type of Construction: 213/2C Proposed Building: Storage Building Ground Floor(Sq.Ft.)_ 720 SF #of Floors 1 Total Sq Ft.; 720 SF Height: 20 FT Use: Accessory Use Type of Construction:2C Proposed Building: Press Box/Concession/Toilet/Storage Building Ground Floor(Sq.Ft.).j„912 SF #of Floors 2 Total Sq.Ft.; 3,615 SF Height: 20 FF Use: Accessory Use Type of Construction:2C 10. Has there been a previous application for a Special Permit from the Planning Board on these premises? Yes . If so,when and for what type of construction? 16 Februga 2001 For new high school See attached previous annlication. 1 L Petitioner and Landowner signature(s); Every application for a Special Permit shall be made on this form which is the official form of the Planning Board. Every application shall be filed with the Town Clerk's Office. It shall be the responsibility of the petitioner to furnish all supporting documentation with this application. The dated copy of this application received by the Town Clerk or Planning Office does not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and legal notification. Failure to comply with application requirements, as cited herein and in the Planning Board Rules and Regulations may result in a dismissal by the Planning Board of this applicatio in ete. Petitioner's Signature: it 1 1% Print or type name here: Rifhard Rice, ice President, DiNisco Design Partnership,Ltd. Owner's Signature: Print or type.name here: Paul Szymanski,Director of Management Support Services, North Andover School Department ►l�� ldT � architects and pIa.'nners Lted ATTACHMENT 3 MEMORANDUM 29 October 2003 Reference: North Andover High School Athletic Complex North Andover,.MA Subject: Request to Amend,the Notice of Decision This Memorandum sets forth the facts relied upon in this Request to Amend the Notice of Decision for the Site Plan Special Permit for the North Andover High School project.This Memorandum only addresses those items in the Site Plan Special Permit Application which the proposed changes impact the information provided in the previous Application. The specific points are referenced below and numbered inaccordance with Section 6 of the current submission instructions. 6.c DESCRIPTION OF PROPOSED CHANGES TO:THE PROJECT We are requesting an amendment to the Notice of Decision issued on 14 May 2001 for the North Andover High School project. We are.requesting approval to modify the approved plans for both the northerly and southerly located athletic fields, and to repave the existing tennis courts. Proposed changes to the northern playfields in the construction of a synthetic material trackkrand field complex.Within the confines of the track there will be a permeable synthetic - playing field that will host field hockey and soccer, and on the outskirts of the field, a high jump area and three pole vault areas:. East of the track,two shot-put arenas,two long/triple jump courses are proposed and to the north a'discuss/hammer area is proposed to be built, as well, as a natural turf softball field (with beam clay infield). The site plan as approved contains two soccer fields.Also proposed for the northern playfields is a storage building of approximately 720 square feet,bleachers for approximately 250 people, a scoreboard, and a retaining wall. Fencing and walks have been reconfigured and the drainage plan revised to accommodate the changes. Proposed changes to the southern playfields include reconfiguring the two originally proposed soccer fields furthest to the west into one synthetic turf multipurpose football/soccer/lacrosse field that will be lighted. . Bleachers for approximately 1,200 people and a press box/ concession/toilet/storage building are proposed to be constructed north of this,playfield. Grading of the two fields furthest to the east-has-been revised to allow for a potential future softball field. Fencing and walks have been reconfigured, and the drainage plan revised to accommodate the above changes. The proposed work on the existing tennis courts is for the replacement of the existing failing pavement. The area of pavement will not change and no change in the drainage is necessary or proposed for this work. See the attached rendered site plans, Proposed Plans drawing set and Plans As Approved drawing set. Kenneth DiNisco Richard N.Rice Gary E.Ainslie Christopher Huston Donna DiNisco 8 7 Su m m e r Street B o s t o n M A 0 2 1 1-0 6 1 7 . 4 2 6 2 8 5 8 f a x 4 2 6 . 1 4-5 7 . www,. d i n i s C 0 C 0m. Memorandum, North Andover Planning Board,29 October 2003 Page 2 6.e TOPOGRAPHY Grading has been revised to accommodate the proposed changes. See the grading pians in the attached Proposed Plans drawing set and Plans As Approved drawing set. 6.g STORMWATER DRAINAGE PLAN The stormwater drainage plan has been revised to accommodate the proposed changes. See the attached Request to Amend the Conservation Commission Order of Conditions. 6.h BUILDING(S) LOCATION The proposed plans include a new storage building in the northern playfields and a press box concession/toilets/storage building in the southern playfields.See the floor plans and site plans in the attached Proposed Plans drawing set and Plans as Approved drawing set. 6.i BUILDING ELEVATIONS See Elevations,SKZ-3.6.1 of Attachment of the Proposed Plans drawing set. 6.j LOCATION OF PARKING / WALKWAYS The number parking spaces in the parking lot south of the new high school has been reduced by 10 spaces to accommodate the new press box/concession/toilets/storage building. The number of spaces available along the emergency access drive at the northern playfields has been reduced by 6. A summary of parking changes is as follows: As Proposed Approved Revisions Parking Spaces 510 500 Overflow Parking—Site Drive 65 65 Overflow Parking— Emergency Access Drive 80 80 Total655 645 The location of walkways has been revised to accommodate the proposed changes. See the layout and materials plans of the attached Proposed Plans drawing set and Plans as Approved drawing set. See the attached Proposed Plans drawing set and Plans As Approved drawing set and the letter from Rick Rice to North Andover Building Department regarding Athletic Fields Upgrade/Parking Counts. 6.k LOCATION OF WETLANDS / NOTICE OF INTENT The stormwater drainage plan has been revised to accommodate the proposed changes. See the attached Request to Amend the Conservation Commission Order of Conditions. 6.1 LOCATION OF WALLS / SIGNS The proposed plans include a new retaining wall and new scoreboard in the northern playfields and a new scoreboard in the southern playfields.An additional wall sign is also proposed for the new press box/concession/toilets/storage building.. See the attached Proposedosed Plans drawing set and Plans As Approved drawing set. Memorandum, North Andover Planning Board, 29 October 2003 Page 3 6.m LOCATION OF ROADWAYS The layout of the emergency access drive at the northern playfields (including the location of the Prescott Street curb cut) has been revised to accommodate the proposed changes to the northern playfields. The curb cut for the revised emergency access drive has been relocated approximately 20 feet to the west of the previous location. The site drive at the parking lot south of the new high school has been revised to accommodate the proposed press box/ concession/toilets/storage building. See the attached Proposed Plans drawing set and Plans As Approved drawing set. 6.o LANDSCAPING PLAN The landscaping plan has been revised to accommodate the proposed changes. See the attached Proposed Plans drawing set and Plans As Approved drawing set. 6.q LIGHTING FACILITIES The proposed changes include sports field lighting located on six poles for the new multipurpose field at the southern playfields. See SKZ 1.5 for location of four poles, SKZ-1.20 for pole and fixture details and ZKA-1.20A for lighting level plan. 6.s TRAFFIC IMPACT The traffic impact from the proposed new facilities would be no more than that from the as approved plans which includes use of the gym for large town events which has a seating capacity of 3,200. This compares to the bleacher seating of 250 at the northern playfields and 1, 200 at the southern playfields. Concurrent use of the gym for town events at4he same time as the playfields are used for significant athletic events is unlikely and if necessary will be controlled by scheduling to avoid conflicts. 6.t COMMONWEALTH REVIEW The Request to Amend the Conservation Commission Order of Conditions has been forwarded to the Massachusetts Department of Environmental Protection—Northeast Region. 6.0 UTILITES Site Utilities have been revised to accommodate the proposed changes. See the attached Proposed Plans drawing set and Plans As Approved drawing set. 6.w COMMUNITY IMPACT The proposed changes provide the equivalent of four more available fields (taking into account the greater availability of the synthetic turf fields) as well as provide better athletic facilities both for the school sports program as well as town recreation including the town soccer league. 99430.0 Cor/PlanDeW!!SitePlnRvwAppl Am&xW3-Memo f i r ,, •r< t /y0 � Ida r ,��... �k {,r}�' j }ti Y f �'•i. d" /Fq1, 4 ,y"` C q-� '.AL O74 r'NL y �� S fyya f i T) E , Y f MYtP �# gx � '£�IFL,' �,� ii -Fa H �, , It .�u: "9 •�, t C 71L IV, Ix r F ji •✓�� � � � e a7,* '+W1 Hsi� �7 t^. ti --- - -~ SHOT PUT +• �•'-Yx _ :;,•S ,� �j LONG/TRIPLE JUMP RUNE-400M7RALK()15'AAD1U5) - HIGH F k .y M t� POLE JUMP JUMP VAULT t UYMEWTUR SNTF,RELD OFT ALI FIEL �OyEApLEELEAfeMER __ A - s � �� L s .�..' 'r� M�'� � ��F ��, i€ ' • Y',/ � �- nor M 3 " X0 x 0 60 120 Athletic Complex - North Fields N 29 October 200: NORTH ANDOVER HIGH SCHOOL North Andover, MALimited architects and planner Zvi y11' ti.. W � �„i • - ;#`�'�K� fx' Y i\��� l 'r” �� � �t� 6 t 1 � i s A tt ..� � t}� £nr �tl d+ 1•"s 5�}?,srz,,+.�, "� ,��4'° � E.. !'����.»�;` \ G � ����v =.•b,��� ��:it +.• / ^° .7 r 41C mot-10M ry ", { \FIELDL*HT y e ss �i`!1 ti �\ POLE.rn. ,� � ,4�� � ti•` y�+ r��',� at���t r� p f IIID ��ti7A VtLL W F � .'{ � �i��ll �� m � dW � �/�/// � /� r' +. 3 Sci�;X•z d"�,v Slt � t��R'.-'} NV VN :! � F T.: 0 60 120 N Athletic Complex - South Fields 29 October 200 NORTH ANDOVER HIGH SCHOOL NW� N4� P North Andover MA Limited ' architects and planner , /v4P , a r c h i t e c t s a n d p l a n n e r s Limited VIA FACSIMILE 28 October 2003 Robert Nicetta, Building Commissioner Town of North Andover Office of the Building Department 27 Charles Street North Andover, MA 01845 Reference: North Andover High School North Andover, MA Subject: Athletic Fields Upgrade/Parking Counts Dear Bob: The School Building Committee has voted to upgrade the athletic fields at the new high school to include a running track and synthetic turf field at the north playfields, and a synthetic turf field with bleachers and a press box/concession/toilet building at the south playfields. The purpose of this letter is to advise you of the net reduction of 10 parking spaces (from 655 to 645)that result from the construction of the HP accessible press box building as summarized below: As Proposed Approved Revisions Parking Spaces 510 500 Overflow Parking—Site Drive 65 _65 Overflow Parking— Emergency Access Drive 80 80 Total 655 645 Please note that the 1,200 seat bleachers take the place of the informal seating on the hillside of the original site plan,and do not increase the total parking load on site. The maximum"public use" parking load remains the gym (when used for large events with a seating capacity of 3,200), which will not be scheduled concurrently with the outdoor fields use. The proposed revisions to the site plan are being submitted to the Planning Board for a request to amend the Notice of Decision for the Site Plan Special Permit. We request that you advise us if the above change in parking is consistent with the zoning requirements for the building. Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco 8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7 w w w . d i n i s c o . c o m Robert Nicetta, 28 October 2003 Page 2 Thank you for your continued assistance with this project. Srcl,y, Richard N. Rice DiNISCO DESIGN RNR/dp cc: Louis Minicucci Paul Szymanski Patrick Saitta Enclosure: Letter from Rick.Rice to North Andover Building Department(dated 02/02/01) 99430.0 corwrwn st 27 ATTACHMENT 11 a a . r c h i t e c t s. a n d p t 'a n n e r s Limited 02 February 2001 Town of.North Andover er Building Department , �. 27 Charles Street. North Andover, MA 01845 Attention: Robert Nicetta, Building Commissioner Re: North Andover High School North Andover,MA Subject: Parking Requirements Dear Bob: The purpose of this letter is to describe the parking-proposed for the new high school project. As we have discussed, schools are not a listed use in the North Andover Zoning By-law, and the Building Inspector shall make a determination as to a sufficient quantity of parking,per the by-law. EXISTING SCHOOL At present, there exists 350 parking spaces serving the students, faculty and staff of the existing 1000 student high school. NEW HIGH SCHOOL The new high school is being designed to accommodate 1500 students(a 50 percent increase in enrollment). Parking for new facility will include a total of 510 spaces in two lots "Overflow"parking is provided by 65 parallel parking spaces along the outside of the access drive (with the inside curb kept clear for a fire lane); in addition it is possible to park another 80 cars in an unpaved area along the emergency access drive which runs along the north ptayfields to a gate at Prescott Street. Administratively,.the School Department can regulate those students allowed to drive to school, thus controlling daytime parking needs. While.additional parking may be advantageous for the largest public usage of the 9 9 P 9 building(i.e. town meeting)the site simply cannot support additional parking for such an infrequent event given wetlands constraints and the need to maximize open space for playfields. i � Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston 8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7 W w w . d i n i s c o c o m Robert Nicetta 02 February 2001 Page 2 MIDDLE SCHOOL PROJECT By of comparison,the 1200 student middle school protect included a total of 191 spaces in three lots, plus 43 parallel parking spaces.along the outside curb of the access drive,for a total of 234 spaces. At recent visits to the middle school during the school day,.more than 100 spaces in the most remote portions of the parking lots were observed to be unused.- Please note that thetotal number of,spaces proposed for the high school is more than double those provided at the middle school. Should you have any comments or questions regarding this matter, please do not hesitate,to contact me. Sincer . Richard Rice DiNISCO DESIGN cc: Louis Minicucci Nancy Kurtz Paul Szymanski Pat Saitta Kenneth DiNisco 99430.0 COrCIy/'rwrVSt 07 Gale Associates, Inc. GALE 163 Libbey Parkway I P.O. Box 890189 1 Weymouth, MA 02189-0004 P 781.335.6465 F 781.335.6467 www.gainc.com October 24,2003 North Andover Conservation Commission 27 Charles Street North Andover, MA 01845 Attn: Julie Parrino, Conservation Administrator Re: North Andover High School Order of Conditions Amendment Request (DEP File No.242-1045) Gale JN 710920 Dear Ms. Parrino and Commission Members: On behalf of the applicants, the Town of North Andover School Building Committee, we are hereby requesting an amendment to the Order of Conditions issued on March 1, 2001 for the North Andover High School project. We are requesting approval to modify the approved plans for both the northerly and southerly-located athletic fields, and to repave the existing tennis courts. The newly proposed plan for the North Playfield involves the construction of a synthetic material track and field complex. In the original plan submitted with the NOI, this area was proposed to contain two soccer fields. Within the confines of the track there will be a permeable synthetic playing field that will host field hockey and soccer, and on the outskirts of the field, a high jump area and three pole vault areas. East of the track, two shot-put arenas, two long/triple jump courses are proposed and to the north a discuss/hammer area is proposed to be built, as well as a natural turf softball field(with beam clay infield). Also proposed for the North.Playfield is a storage building,bleachers for approximately 250 people, a scoreboard, and a retaining wall. Fencing has been reconfigured and the drainage plan revised to accommodate the changes. Proposed modifications to the South Playfield plan include reconfiguring the two originally proposed soccer fields furthest to the west into one synthetic turf multipurpose football/soccer/lacrosse field that will be lighted. Bleachers for approximately 1,200 people and a bleacher building are proposed to be constructed north of this playfield. The bleacher building will include a press box, concession stand, toilets, and a storage area. These above-mentioned modifications will result in an increase in impervious surface within the site over the previous plan. Drainage designs and grading, however, will prevent an increase in runoff peak to the adjacent BVW, or to the river, in compliance with the concept for the approved plan. n he Some of the newly proposed work is within the 100-Foot Wetland Buffer Zone and t 200- Foot Riverfront Area (RA), but the proposed amendments will not increase the amount of altered area within these setbacks. The proposed erosion and sedimentation controls during construction will not need to be changed for the proposed modifications. Finally, the applicants are also requesting approval to repave the existing tennis courts located near the high school entrance. These courts are located within the RA and Buffer Zone, but Boston Baltimore Orlando San Francisco Order of Conditions Amendment �� North Andover High School L E _.Aji11L October 24, 2003 Page t they are in dire need of repair. The area of pavement will not change and no drainage is necessary or proposed for that work. The modifications proposed are entirely within the area proposed for the approved project, and generally within the scope of the project. The work will not result in any increased encroachment within the various buffer zones or result in any increased environmental impact. For those reasons,we feel it is appropriate to request a modification to the existing Order of Conditions, rather than file a new Notice of Intent. Attached to this request are the following plans and supporting information: Attachment 1: Certified List of Abutters and Abutter Notification Attachment 2: Plans entitled: "North Andover High School Athletic Complex", sheets SKZ 1.1 to SKZ 1.33, (excluding sheet numbers SKZ 1.24, 1.28, 1.30) prepared by Gale Associates, Inc dated October 24, 2003. Sheet 3.4.1 "Floor Plans", prepared by DiNisco Design Partnership dated September 10, 2003. Attachment 3: "North• Andover High School Proposed Athletic Complex Stormwater Management Design and Runoff Calculations, Revised Report", dated October 24, 2003 by Gale Associates, Inc. Attachment 4: Plans Entitled: "North Andover High School Stormwater Drainage Plan", sheets 1.3.7 to 1.3.11, dated 14 December 2001, with sheets 1.3.7, 1.3.8 revision 3, dated 25 January 2002 (these are the current construction plans reviewed and approved by the Conservation Commission for the site and are submitted here to facilitate review of the proposed changes). Eight copies of this request including attachments are included as required, and two copies have been submitted to the Mass DEP Northeast Region and one copy has been sent directly to Eggleston Environmental Also, as required, we have sent the attached notification to all project abutters. If you have any questions, or need additional information,please do not hesitate to contact us. Very truly yours, GALE ASSOCIATES,INC. D01-A-(YI Dale K. Harris,P.E. Project Manager Enclosures cc: DEF Northeast DiNisco Design Partnership (for further distribution) Lisa Eggleston, Eggleston Environmental North Andover School Building Committee G:\710920\1etters\ooc_Amendment NORTH ANDOVER HIGH SCHOOL—ATHLETIC COMPLEX REVISIONS October 24, 2003 This amended report presents an analysis of stormwater management practices for the above project in accordance with the Department of Environmental Protection/Coastal Zone Management, Stormwater Policy Handbook and Stormwater Technical Handbook ("the Policy"). The entire report containing the hydrologic computations and design information relative to the existing and original proposed stormwater conditions for the North Andover High School Site was submitted to the Conservation Commission by Schofield Brothers of New England, Inc. (revision dated January 8, 2001), and an Order of Conditions was issued for the project. The athletic portion of the project has been revised to include a new 400 meter running track with an artificial filled turf system infield at the upper tie of the locus, and a new multi-purposed filled turf premium football/soccer field on the lower tier of the site. The necessary stormwater,revisions are included herein, with the modifications to the previous calculations outlined for ease of cross-referencing. The additional impervious area of the track surface (versus the previously proposed under-drained natural turf soccer/field hockey fields) was accounted for in the HydroCAD stormwater model, and was considered as "clean runoff'with regards to the Policy. However, the volume of treatment necessary is provided in the design of the drainage collection within the artificial turf under-drain system. The volume of water to be treated for water quality (according to Standard #1) was analyzed according to the Policy (see Figure 1) by taking the required 1/" of runoff over the total additional contributing impervious area (track surface= approximately 85,000 s.f.). A resulting stormwater volume of 3,532 c.f. of stormwater runoff is required to be treated for water quality. The "clean stormwater runoff' will then collect in an interior trench drain system (with catch basins) which then ties into the under-drain collection system under the turf base. The herringbone under-drain system will be elevated a minimum of 2 inches within the gravel sub-base to provide a "dead space" volume of over 4,600 c.f., which will accommodate the necessary treatment volume before discharging to the proposed drain system. The stormwater BMP's (Best Management Practices) for the entire site have already been designed and approved to treat the total site stormwater runoff and achieve 80% T.S.S. annual load removal(according to standard#4) The volume of water to be recharged to groundwater (according to standard #3) was analyzed according to the Policy (see Figure 2) by taking the required depth of runoff over the impervious track area covering an existing hydrologic soil group. These soils are generally "B" soils (MRCS soil "CmB") requiring a volume of recharge of 0.25 inches multiplied by the total impervious area,and"C" soils (MRCS soil"WrB") requiring a volume of recharge of 0.10 inches multiplied by the total impervious area. A resulting volume of 1520 c:f. is required to approximate the additional annual recharge to groundwater. Again, this volume is more than provided for in the"dead space" volume of over 4,600 c.f. below the gravel sub-base and under-drain system. Additionally, the originally proposed BMP's included a detention galley system designed to capture a volume much larger than required to approximate the current existing conditions and promote ground water recharge, and this system will remain in place under the multi-purpose premium turf field. Peak flow stormwater attenuation is also provided in the turf field under-drain system. Though a slight increase is expected in total runoff volume from the previous calculations (due to the inability to take into account groundwater infiltration caused by varying soils and perched groundwater), the peak runoff rates and volumes for the required storm events (1, 2, 10, 100-year storms) approximate the originally approved proposed conditions. The post-development peak discharge rates do not exceed pre-development rates at the down gradient property line of Cochichewick Brook "design point 1" (according to Standard#2), and in fact a decrease is calculated for all storm events. The summary table at the end of this narrative compares the existing, originally proposed, and current proposed conditions peak flows and volumes of runoff from the project(see Revised Summary Table (3) & (3A)). The previous design relied upon a detention area known as the lower soccer fields (subcatchment area 21 and pond 1). This area was designed to impound excessive stormwater amounts, until these could drain at a controlled rate over an extended time period. The high point ridge elevation of these fields was 107.0, with the ponding elevation for the 100-year storm event at 105.5. This design was modified accordingly as necessitated by the location and elevation of the multi-purpose synthetic turf field, and the lower soccer fields and detention area were essentially reduced by half(see Revised Summary Table 3), from 820 feet to 460 feet in length. The HydroCAD calculations take this modification into account, and attenuation of project peak flows is still provided with a maximum ponding elevation of 105.9 reached at this location during the 100-year storm event. The gravel sub- 1 base under the artificial turf fields(at both locations)provides local stormwater attenuation �1 within the void space, which acts as a detention basin area. The under-drain piping system acts as an outlet control providing additional relief on down gradient subcatchment areas. No additional impervious area beyond the high school regulation track is required for the modification to the athletic facilities. The current design utilizes the natural features of the site along with the previously proposed under-drainage systems and other proposed BMP's to treat and regulate off-site stormwater drainage so that the post development peak flow rates will not create problems downstream from the site in the wetland watershed. The erosion control plan during construction and maintenance plan will remain as previously provided and approved. Additional maintenance will be as required for high-end athletic facilities to include light brooming of the track and regular fibrillation/sweeping of the artificial turf surfaces. This will be in lieu of necessary herbicide/pesticide applications, mowing, and irrigation requirements for natural turf fields, and will be more environmentally sensitive to these resource areas adjacent to the proposed fields. Detailed drainage analysis and HydroCAD calculations are in the following appendix. GALE ASSOCIATES, INC. G:\710920\reports\stormwater.doc Sep 11 03 10: 51a Schofield Brothers 5088791797 P. c TOWN OF NORTH-ANDOVER UST OF PARTIES OF U1[rmm.•. PAGE / OF r►-i P q z • PA R 2 .J- -P 0412 :L71 3 SUBJECT PROPERTY MAP IPAR # "ME ADDRESS No 2.KA 4 r1Q2QvE2Z wiG47CLHot, (20 - ABUTTERS: • 1 o 21 J 'L I oR � `T. I Kvi oa s c I. i 'i"'f-j•� A.� ��41.t.D14+1t l Q. � r' �►/ d ,,,-2 � � 1o O 0 D _ + a t LAR ©h/ ,-,t2TrF 1 I ! 1'!?s'�tZG- r2i 7�'t_ Jc.¢wLo tvo�tfJ vr'1t /44�s 5' /0-2- 1 AYH9 1 j a- I-->. �.S-:2-� as S . si /� 2 1 nr p '/-7 LA F I o 0 o> 1 l 1 vrz 71 y 1-2-1-4bo 05 � ziREi NofIIV1 - -,A 80i TfF?_ xr. ( I w�tt..�/�-+"/ � 14/1�'N/ �"'2 � o 'C'r-4nr �✓r R 101 rL o),4 07 a t rl T2s �•,r�. 1 f?c7. 3 oat 2<0. 5 11 A 4-1. .rs j .¢�x c-C7"tN._. I12,' w rZ j j4 � - 14 4,ne ITam- Is IL M v _ 96; W rC I n/ 17 n r1� f 1 00 Y�•, ' .1 ! � C ft., G 0 2 ,1 • 1 s. I t I R��E►2T S 2►�E//��t7 S" - THIS CERTIFIES Q THAT ON .�. .fi :"- THIS LIST OF NAMES&ADDRESSES OF PARTIES OF INTEKtST WAS P E9-FRED BY THE A .PPLICANT FROM THE RECORDS OF THE ASSESSORS OFFICE. 447f _j AS RS OFFIC ' CwVmd by Board of Asse88or 6kdfldover Sep 11 03 10: 51a Schofield Brothers 5088791797 P. 3 't J `.t TOWN OF NORTH ANDOVER UST OF PARTIES OF INTEREST: OF Y SUBJECT PROPERTY_T MAP PAR # " NAME; ADDRESS 1(otLT'rf C,? rK-'rZ l-S✓(r- MJ ABUTTERS: - l =— I y r . !*7 i • 2' ' %� ( l�tJ fZ � !4 2 r ry C= r+ 3; JZ I Trorz74 iyr QZV- Jg�j . ' 4: I Z1 tj < at/i L/ L 1 :22 LCff► c k f=M tZ0 i I' i r✓v=v!� s: sic (hoc,+ Su ,✓ w . R tz yr • � 6' F ►� IK z 6 r c vt rn1 J I I I i��z77f v,—p, 71 2 ; 1 gA TO N -0 ID-z-21 • 81 i'*9 TZvs L L, _ rz s .u' r-r .r it kn 14 0 P T o.. 's rYT M, Ent t.wjr of I • 121 Z I l-O I '. + ' r '13! I • 141 I`/�. „ I ! . '`.' ( `T 6 -;�Q/c,i �rH4 t2C • fs� j oo J ra • 16104 v i; '2 i za ;v.w+, •off �$ mob"D a � 17;10� i : P L �Z®;�� : :, �s>✓r'�t�'�i � pJ2:'jvTc.O 7' • 18` O , .� f's7/�S '. "Ir o o D S i I: 1�vg it 71 l// Q THIS CERTIFIES THAT ON;:- . .. . THfS ttST OF NAMESS ADC)RESSES OF PARTIES OF P' INTERE T 1NAS P 0A, BY TH ' f, LICANT FROM THE RECORDS OF THE ASSESSORS OFFICE. ASSES§)MtOFFICE • c ,bx Orth And 0 ver Sep 1 1 ua u'4: �:fUp S6H6f s""d Hi^ot-h*kr .,.. 5088' "91'737 •.. TOWN OF NORTH ANDOVER LIST OF PARTIES OF MINTER€ST: PAGE -Z OF y SUBJECT PROPERTY MAP PAR NA.1JE AflJ)ti1SS ABUTFERS: • 1 /o '7 THaV-t '7 O Goat _ P. Ro tltc✓rc.L. fi r2 T f - V 2. , c.as ck cm t r+/ Rt. 3 /c7. 1 ISRT .Y/ trk 'FI: 2 v v Is e 4: / ' (11./�/V owF Z Otto 5 14"N . WV KG f .� 7/t �uz. t 6 i J / (' ' c�(Z1�•?E/ N- f V rd?.v. IV 1 At , . FtPik TtZ 1 o - �.L q L� i [ q i2i-� +phi v �-- p/ �•"'�jie,3 UeaI i y . Gt!{g "" •r c tin.r Cr* D 91 p r 10 Ir f-�/V e r~- I o �o • 11; i 2 j /L�r� p0l 1-11/ C M713, Jt - rV N fz f - `-V SG•� /* -T/ a-,� ! •a i ply u +. .re 14 3 3 I DaNfl� S C - Lvr+s/r. _ e 1 a 16 I • _ :_ �_ Trd—Ft�`st Ohl/�7®rtl- t2 S 16 i. Nva: •• ,� a J`"fz y�, c� / 1 LM THIS C IFIES ONLY THAT ON THIS LIST O.F NAMES&ADDRESSES OF PARTIES OF INTEREST AS PREP BY THE LICIT FROM THE RECORDS DF THE ASSESSORS OFFICE. ASSESSO. S; FICE Csdfiea by__" oases" �Y Board of Nor Andover' Sep 11 03 10: 51a Schofield Brothers 5088791797 p. 5 TOWN OF NORTH ANDOVER _ UST OF'PARTIES OF INTEREST: PAGE LtOF SUBJECT PROPERTY MAP JPAH #j NAME ADDRESS &�jg--04. PZhoW d SG Q o S <j+ ABUTTERS: QST v�E'►Z e S� 2! 12.Z I owe �ri/+Y 'r IIS o 30'7 O I I G C►, p ,:J S�c� l ATr ' (J�/G i �NT.1.�i✓ ��• � ! G --:� � q ► 3. 1 2 irs Q c ix'!>m-r/� v r, 2 r�(oa L L'Z- C3 —A- -a —LRr�� S I=i..-. 63S 51 3 I ZS( uv >✓ "'� ; .N ci I c.1"r c.►t -c r:wc, R • s! f GI v �G = tri`' I zF � � 2�•,r 2 71 q Z I i ! oma . -7 7 T c- ry CAxZr1y t9Vv 0 vr.-M kzr iq n i $i L2 04 IJI I ,�►r, d sl I I c �- 101 IAf 2= I n of ' W 121 13k I I :14; 1 171 , i 1'8 THIS CERTIFIES QNLY THAT QN / Q THIS LIST dF T `NAMES&ADDRESSES OF PARTIES OF INTERS 'S PREPAR Y THE •- ` FROM THE RECORDS OF THE ASSESSORS OFFICE. Lof ASSESSOMO-F-PtCE �_vp 1 pied byD BoarA�ssdwbM Andover M �tdt architects and planners HAND DELIVERED 2 0 December 2003 Heidi Griffin North Andover Planning Board r- 27 Charles Street North Andover, MA 01845 Reference: North Andover High School Athletic Complex s' .- North Andover, MAS C , t t Subject: Request to Amend the Notice of Decision Cr Dear Heidi and Planning Board Members: We submit to the Planning Board a Request to Amend the Notice of Decision for the Site Plan Special Permit for the North Andover High School project.We are requesting approval to modify the approved site plan for the northern playfields, the southern playfields and to repave the existing tennis courts.Our submission includes the materials listed below(some of the materials, as noted, have been previously submitted with a draft application for preliminary review): Application-(10) copies total of which (3) are time stamped;one is the signed original. Plan Sets-(10) copies of which (3)are full size and (7) are half size.(2 Copies of the half-size plan set previously submitted with draft application) Request to Amend the Conservation Commission Order of Conditions (3)copies with full size drawings. (1 Copy previously submitted with draft application) Previous Application for Site Pian Special Permit-(1)copy. (Previously submitted with draft application) • Plans as Approved, excerpted from the Construction Document Set.-(2) full size copies. (1 Copy previously submitted with draft application) • Two sets of envelopes addressed to abutters and thirty envelopes not addressed, all with the required postage. Kenneth DiNisco Richard N.Rice Gary E.Ainslie Christopher Huston Donna DiNiseo 87 Summer Street Boston MA 02110 617 . 426 . 2858 fax 426 . 1457 www . dinisco . com - Heidi Griffin, 02 December 2003 Page 2 If there are any questions please do not hesitate to contact Rick Rice or myself. Sincerely Y! Jon Ox an AIA DiNISC DESIGN ro cc: Timothy McIntosh, Vanasse.Hangen Brustlin,Inc. Louis Minicucci (Attachments 1 -4 only) Paul Szymanski Nancy Kurtz Patrick Saitta Kenneth DiNisco (Attachments 1 —4 only) Richard Rice (Attachments 1 4 only) Enclosures: Attachments i —9 LF1 --LF2 (See Table of Contents,Attachment 1) 99430.0 Cor/Planoept/.7!SitePlnRvwAppl-AmendLCoverLtr 02 ►lam/V� D411up P44444ldf architects and planner s NORTH ANDOVER HIGH SCHOOL ATHLETIC COMPLEX NORTH ANDOVER, MA REQUEST TO AMEND THE NOTICE OF DECISION ATTACHMENT 1 TABLE OF CONTENTS 29 October 2003 Table of Contents (29 October 2003) ................... ......... ...... ............... ....... Attachment 1 Application-for Site Plan Special Permit.... .................. ......... ......... .............Attachment 2 Memorandum (29 October 2003) ... ......... ................... ........ ............... ........ Attachment 3 Rendered Site Plans............ ........ ......... ........................ ... ..,......... .......... Attachment 4 • Proposed Site Plan o Athletic Complex Site Plan (29 October 2003) o Athletic Complex Site Plan-North Fields (29 October 2003) o Athletic Complex Site Plan—South Fields(29 October 2003) • Site Plan as Approved(11 May 2001) Letter from Rick Rice to North Andover Building Department Athletic Fields Upgrade/Parking Counts (28 October 2003) . ......... .. Attachment 5 Request to Amend the Conservation Commission Order of Conditions (24 October 2003).......................................................... Attachment 6 Note: The cover letter and introduction to Stormwater Management Design and Runoff Calculations have been included in all sets. A complete copy of the application with three full size drawing sets have been forwarded to the Planning Board as requested and one copy of the application and full size drawing set,forwarded to VHB. Certified Abutters List (13 August 2003)... ......... ............................ .............Attachment 8 North Andover High School Previous Application for Site Plan Special Permit (16 Febuary 2001).............Attachment 9 Note: Only one copy of this attachment has been forwarded to both Planning Board and VHB as requested. ' Kenneth DiNtsco. Richard N.Rice Gary E.Ainslie Christopher Huston Donna DlNisco 8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7 www . din is c o . c o m Attachment 1 —Table of Contents— North Andover High School Page 2 LARGE FORMAT ATTACHMENTS PROPOSED PLANS North Andover High School Athletic Complex (24 October 2003)...............Attachment LF1 SKZ-T.1 Title Sheet SITE SKZ-1.1 North Fields—Layout, Material & Planting Plan SKZ-1.2 North Fields—Grading &Erosion Control Plan SKZ-1.3 North Fields-Utility Plan SKZ-1.4 North Fields—Drainage Layout Plan SKZ-1.5 South Fields— Layout, Material & Planting Plan SKZ-1.6 South Fields—Grading & Erosion Control Plan SKZ-1.7 South Fields Irrigation Layout Plan SKZ-1.8 South Fields— Utility Plan SKZ-1.9 South Fields— Drainage Layout Plan SKZ-1.10 Detail Sheet SKZ-1.11 Detail Sheet SKZ-1.12 Detail Sheet SKZ-1.13 Detail Sheet SKZ-1.14 Detail Sheet SKZ-1.15 Detail Sheet SKZ-1.16 Bleacher Layout Plan SKZ-1.17 Bleacher Detail Sheet SKZ-1.18 Bleacher Foundation Plan SKZ-1.19 Bleacher Detail Sheet SKZ-1.20 Lighting Layout Plan &Details SKZ-1.20A Site Lighting Calculation Plan SKZ-1.21 Tennis Courts Existing Conditions and Demolition Plan SKZ-1.22 Tennis Courts Layout&Grading Plan SKZ-1.23 Tennis Court Detail Sheet ARCHITECTURAL SKZ-3.1 Bleacher Building-Plans SKZ-32 Bleacher Building—Elevations Attachment 1 -Table of Contents— North Andover High School Page 3 PLANS AS APPROVED North Andover High School (14 December 2003) Conformed Drawings Include Addenda 1 —4 (31 January 2002) Excerpt........... . ...... ... ... . ...... ....... ............................ ....... Attachment LF2 Note: Only two full size copies of this drawing set have been forwarded to the Planning Board as requested and one full size set forwarded to VHB. T-1 Title Sheet Volume 1 T-1 Title Sheet Volume 2 SITE 1.1.1 Materials Pian-Overview 1.1.2 Materials Plan North 1.1.3 Materials Plan - Middle 1.1.4 Materials Plan -South 1.1.6 Layout Plan - Overview 1.1.7 Layout Plan - North 1.1.8 Layout Plan- Middle 1.1.9 Layout Plan - South 1.1.11 Grading Plan-Overview 1.1.12 Grading Plan - North 1.1.13 Grading Plan - Middle 1.1.14 Grading Plan -South 1.1.16 Planting Plan - Overview 1.1.17 Planting Plan - North 1.1.18 Planting Plan - Middle 1.1.19 Planting Plan - South 1.2.0 Site Utilities-Legends& Utilities 1.2.1 Site Utilities Overall Site Plan 1.2.2 Site Utilities - Site Utilities Site Plan Part A 1.2.3 Site Utilities- Site Utilities Site Plan Part B 1.2.4 Site Utilities- Site Utilities Site Plan Part C 1.3.6 Stormwater Drainage Plan -Overview 1.3.7 Stormwater Drainage Pian - North 1.3.8 Stormwater Drainage Plan- Middle 1.3.9 Stormwater Drainage Plan - South ELECTRICAL 10.1.2 Electrical Site Plan 10.1.4 Site Lighting Plan- Sheet#1 10.1.5 Site Lighting Plan -Sheet#2 10.1.7 Lighting Fixture Schedule E-1 Site Lighting Calculation Plan E-2 Site Lighting Calculation Plan 99430.0 Cor/PlanDept/!!!SitePlnRvwAppl-Amend/01-Memo See Section 8.3 of the North Andover Zoning Bylaw for more detailed information Town of North Andover Planning Board A...:. .. Please type or print clearly: CD l Co 1. Petitioner: DiNisco Design Partnership.Limited Address: 87 Summer Street,Boston MA 02110 Telephone Number: (617)426-2858 2. Owners of the Land: North Andover School Department Address: 43 High Street,North Andover MA 01845 Telephone Number: 978-794-1503 Number of years ownership: 32 If applicant is not the owner,please state interest in property: Architect 8.3-2.a.i& 8.3-8.c 3. Request for a Special Permit under Section of the North Andover Zoning Bylaw to Request to amend the site plan special permit for: Revising playfield layout; substituting synthetic turf for natural turf at some fields, adding a running track, bleachers,press box/concession/toilet/storage building, field lighting,and a storage building; and repaving the existing tennis courts.See attached memorandum for additional.detail. 4. Location of Property: 675 Chickering Road,North Andover MAO 1845 Zoning District: Residential 2 Assessors: Map: 84 Lot# 29 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 84 Lot# 30 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 92 Lot# 2 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 92 Lot# 3 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 94 Lot# 3 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 94 Lot# 4 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 94 Lot# 5 Registry of Deeds: Book#: 1170 Page# 337 Assessors: Map: 100 Lot# 5 .Registry of Deeds: Book#: 1170 Page# 335 5. Existing,-Lot: Lot Area(Sq.Ft): 2,100,463 SF Building Height: 42 Street Frontage; 2,900+/-FT Side Setbacks: 1,760 FT/340 FT Font Setback: ' 162 FT Rear Setback: 374 FT Floor Area Ration: 0.10:1 Lot Coverage: 7% 6. Proposed Lot(if applicable): Lot Area (Sq.Ft.): 2,100,463 SF Building Height:40 FT(3 story)/50 FT(aud/gym) Street Frontage: 2,900+/- SF Side Setback: 230 FT/840 FT Front Setback: 32.1717 Rear Setback: 150 FT Floor Area Ratio: 0.15:1 Lot Coverage: 8.3% 7. Required Lot(as required by Zoning Bylaw); Lot Area(Sq.Ft.): 43,560 SF Building Height: 65 FT(SECT 7.4.4) Street Frontage: 150 FT Side Setback: 30 FT Front Setback: 30 FT Rear Setback: 30 FT Floor Area Ratio: N/A Lot Coverage: N/A & Existing Building(if applicable): Ground Floor(Sq.Ft.) 148,743 SF #of Floors 2 Total Sq. Ft.; 204,471 SF Height: 42 FT Use: N/A Type of Construction:N/A 9. Proposed Building: High school Ground Floor(Sq.Ft.) 171,378 SF #of Floors 3 Total Sq.Ft.; 300,649 SF Height: 48 FT(3 story/5o Fr aud/gym) Use: Educational Type of Construction: 2B/2C Proposed Building: Storage Building Ground Floor(Sq.Ft.) 720 SF #of Floors 1 Total Sq. Ft.; 720 SF Height: 20 FT Use: Accessory Use Type of Construction:2C Proposed.Building: Press Box/Concession/Toilet/Storage Building Ground Floor(Sq.Ft.) 1,912 SF #of Floors 2 Total Sq. Ft.; 3,615 SF Height: 20 FF Use: Accessory Use Type of Construction:2C 10. Has there been a previous application for a Special Permit from the Planning Board on these premises? Yes . If so,when and for what type of construction? 16 February 2001 For new high school See attached previous Wlication. 11. Petitioner and Landowner signature(s): Every application for a Special Permit shall be made on this form which is the official form of the Planning Board. Every application shall be filed with the Town Clerk's Office. It shall be the responsibility of the petitioner to furnish all supporting documentation with this application. The dated copy' of this application received by the Town Clerk or Planning Office does not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and legal notification. Failure to comply with application requirements, as cited herein and in the Planning Board Rules and Regulations may result in a dismissal by the Planning Board of this applicatio in ete. Petitioner's Signature: Print or type name here: Righard Rice ice President, DiNisco Design Partnership,Ltd. Owner's Signature: Print or type_name here: Paul Szymanski,Director of Management Support Services, North Andover School Department 1 1.,,,tea architects, and planners Transmittal 57 Summer Street Boston NIA 02:110 To: Town Clerk's Office /Town of North Andover Date: 03 December 2003 400 Osgood Street Project: North Andover High School North Andover MA 01845 Project No.:99-430.0 Attn: Joyce Bradshaw Fax No.: We are sending the following: Via: ❑ Letter(s) ❑ Fax ❑ Print(s) ❑ Courier ❑ Shop Drawing(s) ® Mail ❑ Specifications(s) ❑ Overnight Mail ® Other: As Noted ❑ Other: Date Description By Action 12/02/03 Application for Site Plan Special Permit - Request to Amend the Notice of Decision 1. Approved as submitted 3. Revise and resubmit 5. For your information 7. Reviewed,no approval required 2. Approve as noted 4. Approved as submitted 6. For your approval 8. Other Comments: Dear Joyce, As we discussed on the phone today and to comply with your filing requirements, I am forwarding for your records a complete copy of the application portion of our submission to the Planning Board for the North Andover High School Athletic Complex. Thank your for your help. Sincerely, r By: bon Oxman cc: Rick Rice This is Page 1 of . Please call 617-426-2858 if you do not receive all pages. Fax 617-426-1457 Notice of confidentiality: This transmittal is intended only for the addressee listed above and may contain information that is confidential and privileged. If you are not the addressee,contact us as soon as possible. Any use, disclosure, nnnwinn nr nnmmo tninnfinnc of tha rnntnnfe of chic trnncmiccinn is nrnhihifarl ".. 4 �. .- Mp'.. .x - .,, ...-: _ ,..« ..�., ..,, ,:z..,. yy .:�- - .. �. :: x:' � :yP:,♦•� `fir''• !ti '..,4� ,rf: I:,. k. .. / .e I... zF .. .. ♦. . ...✓'... ,� i. r -... .., .".: Y,. ,f.:h.. .sz: ` _ ,a t t { Y>y I L+ s .1 E _ • 3'. • { , K� i` n , r y •, a e I .'x r mp , ., .: y�y.:i�. ,L�:'^{,. ..' ` >.k:' �... ;4� . ,., "?'e,� r::h, s.,X�, .� e.,�`t...•�,y .a:'. 9 rr y k" ,. ::..:. < ._l a., .. / r.. ., ,£ ,. ',.,y ad. ... ♦ -..'... N. � �ft.�`.•/� 1'x:4, > „ / Wjl itz TRU P� ..�� -s'„Aj k✓- , -' ;/ �+” �..•u )V- ..� ,'^t,, :Y. €d?'"'' a r .s„' M1v 7>S. � �, s f � ,,,s., •���.,+., �W �rh' tLK:' 'tS }. J .`\ as' r , ' ' J .• h yy`` y � �,, ;�_, fit. I,,,,rte �*, ��7 �.ry, wk>�(, �' i` �� ,✓�, I�sr. w. > ,� �� +'"v �'` h ' s � ` u'Ya L� 7 - •t , , ,f^ "" ,/. Si' t :t � � .fes q"' fe.���''��nn _ .•66�r �a t , r y � - �'�� I �-' %at����• r ° ej,N4 �' r G � 17/T 3 ,m,,, Y ��- �' � 1 r1 � x T3^a�' ✓Gt 5/Y�4��¢ � Rr'�+tI��S�c��{{ro t'� * / �` ti I I �r r� 0-5 I X011 t /k r �•�` Vey . ' ��''�... �� �>' � a. �;. t{�; � , �. $. .�>i�a. „fir � ,,;sy :..' ,�, .�,; e.��. �\•@„ FlI q'•.i r :, +': ,6 •t 6 J. 4 m i S �... ... � �y .,', v ... ,try. `, n .»t{v,;.:. _t'•.n,..:. •i'.,.-..• ..'�.t _ ;a.. :: .veer '",,. h -`-ze;:. �.:aiS wl^,/)f': '.t-k':' .<t.^. `�; "' -- J`• ,1 I r -t , w KERING .. . , E fir. ,�_,,�s.,, � r-.,- ,. .►.�:►tt �`�. � ;�� t ' , y..W:,, t_..., ,,cif .,,✓r ,.�,f� ,� i� xsr.. :. �'' _. ,.:, ;.p r W!",.�. '. ,.. .. zz ,... �q�i, .rKw„1 ,.^'r.. .. \` b• `f{',y,.� :,,i„ 1� �G3a Ir, ky._ -. . . ,•yl�''� _ -. YY” cd : u y15y—' .F 0 100 200 N Site Plan as Approved 11 May 2001 NORTH ANDOVER HIGH SCHOOL North Andover, MA Luted architects and planners }y. a �d ., a ✓. .. �.. .-- -y .ip, %; r �-x i.'-._.K ,,:,-f - .: _ '.. 1. ,• . . ;.:, ... ..: `-c- `, ...,_,. .- �' r .+ t ' zs 3 r ; a .. , l I ay... i1. .. ? .. ,.. k e' ;t t':,( � /p1 1 gyta..: '•�'�. r r< / I ..r, t , 1� k c ' ,f r _ J t Al , liX,; ;" aft,; .. R � l`_'-",•> / `.. O , w 44b. , w r c K i z r .y . m t R 1 M1 I ! r` I i' I � •.. ,� ,�' .-�-�: t ern �• F - � �,� t '�• `.r a:-v '' :,;. i -• yA t vme, �,. x +L� •37 I i' :M. •.,%Y . i a .�i ll', ,,Y,vn _:2^ P. �'�� 1 r�Ft' C \.JiLOc•: 1 y, Y�` a i� sr�` a"},n i.i.Yn f e..;..t'�1 , YYo�"" �� Y t:+� ��'. Y� ¢I :.i'I� � .L,\ F�T .\ `� x :v `,•(a'� rP��la. t'�kS- "fr\,'.�'�tF '�+� ` r,. JJ ;: ins.,7�,1 w6 tC a >r � [ r r ; , I rr _.. -.r ..- �`\s ,.M.ir,u,r..a J i.l. ;lf ,:, .,,:' a ,,:- :,ti-P; - -: ,, I• ',r ' Y i �il�;i` I•.�, � '�'� i. .. � ,1 ,, `-,: \ •,:.: ',, t� �;: + ,'•';;. .: .\, � .: �' r .Til ! 4• :ii'h.� _ , .:' HCKERING tz .. �. AI , OA ' ;;;r nn�•,:.., ,. .a'y-' . '�- �.- .•�-:. .::,;. "`rf, p'�."„� k!>`•A4a"� r'�"L". .-"7� +s>'^" z�:�+ �.,. ,r � - tib a•.:r x:o ",:: , „ ;..; i_•t`F', ,� ,:�6�- c:,. t$;% � b,�. 4•c F. n - 'Y`:,. �. .'"7t F -.. r I ,F,r r: r�- w. r [6� _ v�, � ,F .7'•S - . t , , 0 100 200 N Athletic Complex 29 October 2003 NORTH ANDOVER HIGH SCHOOL D"� PmUzm44 North Andover MA Lied architects and planners