SITE PLAN REVIEW
Date: December 18,2008
Date of Public Meeting: December 2, 2008
Petition of- North Andover School Department
North Andover,MA 01845
Premises Affected: North Andover Modular Pre-K School
Chickering Road
North Andover,MA 01845
Referring to the above petition for Review of a Site Plan,according to the requirements of the North Andover
Zoning Bylaw,Sections 8.3, 10.3,and 10.31 and MGL C.40A,Sec.9
So as to allow the construction of a 13,000 sq. ft. modular building on existing school property, adjacent to
the Atkinson School and the Middle School, with associated drainage, landscaping and parking
improvements in the Residential 4 District.
After a public meeting given on the above date,the Planning Board recommended approval of the attached
conditions imposed on the project.
Although the School Department is exempt from the requirement to apply for a Site Plan Review Special
Permit, The North Andover School Committee did voluntarily submit the appropriate documentation,
including site plans, to the North Andover Planning Board, so that the Planning Board could review the
documents and provide comments related to parking, stormwater management, landscaping and location
of the building.
On#half'ofthe No
Andover Planning Board
John Simons,Chaifmw
Richard Rowen
Timothy Seibert
Michael Walsh
Courtney LaVolpicelo
North Andover School Department
Site Plan Special Permit—Construction of Pre-K School Building with Stormwater Management Improvements
The Planning Board herein APPROVES the construction of a 13,000 sq. ft. modular building on existing
school property, adjacent to the Atkinson School and the Middle School, with associated drainage,
landscaping and parking improvements. The project is located on Chickering Road in North Andover,
Massachusetts, 01845, in the Residential 4 (R4) District. This Special Permit was requested by the North
Andover School Department The application was filed with the Planning Board on November 4,2008. The
public meeting on the above referenced application was opened on December 2, 2008, and closed by the
North Andover Planning Board on December 2, 2008. The applicant submitted an application, which was
noticed and reviewed in accordance with Section 8.3, 10.3,and 10.31 of the Town of North Andover Zoning
Bylaw and MGL C.40A,Sec.9.
The Planning Board makes the following findings as required by the North Andover Zoning Bylaws
Section 8.3 and 10.3:
FINDINGS OF FACT:
1) The specific site is an appropriate location for the project as it is located in the Residential 4 (R-4)
Zoning District and consists of the construction of a 13,000 sq. ft. modular building on existing
school property, adjacent to the Atkinson School and the Middle School, with associated drainage,
landscaping and parking improvements;
2) The use as developed will not adversely affect the neighborhood as the building has been situated in a
location that will have the least amount of visual impact on the neighborhood as possible. The
building will be located approximately 100 ft. from Chickering Road and will be screened by
significant existing tree cover;
3) There will be no nuisance or serious hazard to vehicles or pedestrians. The overall layout of the site
has been designed to be incorporated into the existing school campus,and will utilize existing parking
as well as traffic entrances and exits to the site;
4) A new landscaping plan has been proposed which provides plantings along the front of the building,
as well as in front of the visitor/accessible parking area and circular driveway at the entrance to the
building. All plantings and screening depicted on the approved plans referenced herein shall remain
in perpetuity over the life of the project;
5) Adequate and appropriate facilities will be provided for the proper operation of the proposed use.
The building is currently serviced by town water and sewer. The Division of Public Works has
reviewed the application, utilities, and drainage and stormwater management plan and deemed them
to be adequate. The applicant has agreed to make specific changes to the stormwater management
plan as requested by the town engineer. (See letter from E.Willis dated November 25,2008 and reply
from Ben Gary dated December 1, 2008)
Finally the Planning Board finds that this project generally complies with the Town of North Andover
Zoning Bylaw requirements as listed in Section 8.3.5, but requires conditions in order to be Jly in
compliance. The Planning Board hereby grants an approval to the applicant provided the fwi4
conditions are met: 3>Bc
-�
SPECIAL CONDITIONS: --
1) Permit Definitions:
2
North Andover School Department
Site Plan Special Permit-Construction of Pre-K School Building with Stormwater Management Improvements
A) The "Plans" refer to the plans prepared by Marshal Gary LLC, 687 20 Cabot Road, Concord,
MA 01801 entitled "North Andover Modular Pre-K School, North Andover, MA", dated
November 3, 2008, consisting of Sheets L-1 through L-7, along with floor plans and elevations by
Tappe Associates,dated 10/31/08.
B) The "Project" refers to the construction of a 13,000 sq. ft. modular building on existing school
property, adjacent to the Atkinson School and the Middle School, with associated drainage,
landscaping and parking improvements.
C) The "Applicant" refers to the North Andover School Department, the applicants for the Special
Permit.
D) The"Project Owner"refers to the person or entity holding the fee interest to the title to the Locus
from time to time,which can include but is not limited to the applicant,developer,and owner.
2) PRIOR TO THE START OF CONSTRUCTION
A)An updated site plan shall be provided to the Planning Office, showing the changes to be made to
the stormwater management system as outlined in the letter from town engineer E. Willis and
applicant's engineer B. Gary,referenced above.
B) A detailed construction schedule shall be submitted to the Planning Staff for the purpose of
tracking the construction and informing the public of anticipated activities on the site.
C) All applicable erosion control measures must be in place and reviewed and approved by the Planning
Department.
D) Yellow"Caution"tape must be placed along the limit of clearing and grading as shown on the plan.
The Planning Department must be contacted prior to any cutting and or clearing on site.
E) A pre-construction meeting must be held with the developer,their construction employees,Planning
Department and Building Department (and other applicable departments) to discuss scheduling of
inspections to be conducted on the project and the construction schedule.
E) The developer shall provide the Planning Board with copies of permits, plans and decisions
received from all North Andover Land-Use Boards.
3) PRIOR TO THE ISSUANCE OF A BUILDING PERMIT
A) Three(3)copies of the signed,recorded plans must be delivered to the Planning Department.
4 DURING CONSTRUCTION
A) Dust mitigation must be performed weekly, or more frequently as directed by the Town Planner,
throughout the construction process.
B) Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan and
reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times
3
North Andover School Department
Site Plan Special Permit—Construction of Pre-K School Building with Stormwater Management Improvements
and fenced off to minimize any dust problems that may occur with adjacent properties.
C) It shall be the responsibility of the developer to assure that no erosion from the construction site shall
occur which will cause deposition of soil or sediment upon adjacent properties or public ways,
except as normally ancillary to off-site sewer or other off-site construction. Off-site erosion will be
a basis for the Planning Board making a finding that the project is not in compliance with the plan;
provided, however, that the Planning Board shall give the developer written notice of any such
finding and ten days to cure said condition.
D) In an effort to reduce noise levels, the developer shall keep in optimum working order, through
regular maintenance,any and all equipment that shall emanate sounds from the structures or site.
6) AT COMPLETION OF CONSTRUCTION
A. The applicant must submit a letter from the architect and engineer of the project stating that the
building, landscaping, lighting and site layout substantially comply with the plans referenced at the
end of this decision as endorsed by the Planning Board. Alternatively,the applicant and/or property
owner may provide a bond, determined by the Planning Board, to cover the full amount of the
landscaping materials and installation if weather conditions do not permit the completion of the
landscaping prior to the use of the building.
B) The Planning Staff shall review the site. Any screening as may be reasonably required by the
Planning Staff will be added at the Project Owner's expense.
C) A final as-built plan showing final topography,the location of all on-site utilities, structures,curb
cuts,parking spaces and drainage facilities must be submitted to the Planning Department.
D) Once the building has been in full operation for at least 30 days,the applicant shall meet with the
Town Planner, the Police Dept, as well as other pertinent town departments to review the use of
the parking spaces on the site as well as the traffic patterns on site.
7) GENERAL CONDITIONS
A) Any plants,tree,shrubs, or fencing that have been incorporated into the Landscape Plan approved
in this decision that die or fall into disrepair must be replaced by the project owner in perpetuity.
B) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
C) Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the
respective utility companies.
D) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through
Friday and between 8:00 a.m. and 5:00 p.m. on Saturday.
E) No open burning shall be done except as is permitted during burning season under the Fire
Department regulations.
F) No underground fuel storage shall be installed except as may be allowed by Town Regulations.
4
North Andover School Department
Site Plan Special Permit—Construction of Pre-K School Building with Stormwater Management Improvements
G) The provisions of this conditional approval shall apply to and be binding upon the applicant, its
employees and all successors and assigns in interest or control
H) Any action by a Town Board, Commission, or Department, which requires changes in the plan or
design of the building, as presented to the Planning Board, may-be subject to modification by the
Planning Board.
I) Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed
substantial,the developer must submit revised plans to the Planning Board for approval.
J) The following information shall be deemed part of the decision:
Plan titled: Site Plan&Existing Conditions Plan
North Andover Modular Pre-K School
North Andover,Massachusetts 01845
Prepared for: North Andover School Department
North Andover,MA 01845
Prepared by: Marshall/Gary LLC
20 Cabot Road
Woburn,MA 01801
Scale: l"=40'
Date: November 3,2008
Sheets: L-1 through L-7