HomeMy WebLinkAboutBARRETT CONSTRUCTION CO R
RECI=:y) #
310 CMR 10.99 DANIEL L'
TOW4 C.t.f.IRK
Form 8 NORTH ,
ff D ite No. 242-583
JA*27ft f ff 1.9
(To oe vroviaed by DEP)
• Commonwealth C,ly lown ' North Andover
'i�. _•_
of Massachusetts Barrett Construction Co.
Apoucant
Lot 3A Coventry Lane
Certificate of Compliance
Massachusetts Wetlands Protection Act, G.L. c. 131, §40
From North Andover Conservation Commission Issuing Authority
To Barrett Construction Co. 671 WnArprlg Rd, North Andover, MA 01845
(Name) (Address)
Date of Issuance January 21 1993
This Certificate is issued for work regulated by an Order of Conditions issued to Barrett rnnetr„rt;nn Co .
dated 5/10/92 and issued by the NArr
1. It is hereby certified that the work regulated by the above-referenced Order of Conditions has
been satisfactorily completed.
2. ❑ It is hereby certified that only,the following portions of the work regulated by the above-refer-
enced Order of Conditions have been satisfactorily completed:(if the Certificate of Compliance
does not include the entire project,specify what portions are included.)
3. ❑ It is hereby certified that the work regulated by the above-referenced Order of Conditions was
never commenced.The Order of Conditions has lapsed and is therefore no longer valid.No future
work subject to regulation under the Act may be commenced without filing a new Notice of Intent
and receiving a new Order of Conditions.
(Leave Soace Blank)
s-1
Effective 11/10/89
t ,
4. This certificate shall be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located.The Order was originally recorded on 5/27/92 (date)
at the Registryof Deeds, North Essex , Book , Page TradesV #14.738
5, q The following conditions of the Order shall continue:(Set forth any conditions contained in the
Final Order,such as maintenance or monitoring,which are to continue for a longer period.)
Issued by North Andover Conservation Commission
Signature(s)
i
17
When issued by the Conservation Commi n this Certificate must be signed by a majority of is members.
On this AS � day . 19 ` . before me
personally appeared ,to me known to be the
person described in and who executed the foregoing instrument and acknowledged that he/she executed
the same as his/her free act and deed.
1`4ry Public My commission expires�-
Detach on dotted line and submit to the NORTH ANDOVER CONSERVATION COMMISSION
To NACC issuing Authority
Please be advised mat the Certificate of Compitance for the prosect at: 3A Coventry Lane
FileNumoer 242-58-1 has been recorded at the Registry of Deeds, Northern Essex
and has been noteo to the chain of title of the affected orocerty on 9
it reccroea tanc.*.^e instrument numoer,wntca saentnaes tnts transaction is
If regtstereo land,the cocument numoer wntch'tdenoftes this transaction is
Signature aooucani
TOWN OF NORTH ANDOVER �3���' �'E
MASSACHUSETTS 5
JL 15
f NORTH
lift 0
r
Any appeal shall be filed
within (20) days after the
date of filing of this Notice
In the Office of the Town NOTICE OF DECISION
Clerk.
Date. . .. July 8. 1992. . . . . . . .
Date of Hearing . . . . . ,7,. •1992•
Petition of . .William K. Barrett
Premises affected • .Lot 3A Coventry Lane • • • .• , • • • • • • • • • • . • • •
Referring to the above petition for a special permit from the requirements
of the . North• • •
Andover co ing.$ylaw.� Section 4.136, Para�2.B. 1. , .. . .WatershedProtection
so as to permit • the•construction of a single family dwelling within 100'. .of, ,a• tributary
. . . . . . .
to Lake Cochichewick.
. . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .
After a public hearing given on the above date, the Planning Board voted
CONDITIONALLY
to APPROVES . . . . . . . .
the , .SPECIAL PERMIT.. .. . . . . . . . . . . . . . . . . . . . . . . . .. .
cc: Director of Public Works
Board of Public works based upon the following conditions:
Highway Surveyor
Building Inspector
Board of Health
Assessors Sig! e
Conservation Commission ;
Police Chief George Perna, Chairman
Fire Chief . . . . . . . . . . . .
Applicant Joseph Mahoney
Engineer . . . . . •
File •Richard Nardella
Interested Parties • • • • • . • • • • • • • • • • •
.Richard Rowena. . . . . . . . . . .
�lnrara »cr I3narLl —
BARRETT CONSTRUCTION CO.,
LOT 3A, COVENTRY LANE
NORTH ANDOVER, MASSACHUSETTS
SPECIAL PERMIT FOR CONSTRUCTION WITHIN
THE WATERSHED PROTECTION DISTRICT.
NORTH ANDOVER ZONING BYLAW, SECTION 4.136
FINDINGS OF FACT:
The Planning Board makes the following findings regarding this Special Permit as required by
section 4.136 of the Zoning Bylaws:
1. The proposed use and site design for this lot are appropriate, due to its location
in Town.
2. Adequate vehicular and pedestrian access into the surrounding site has been provided.
3. The applicant has met the requirements of the Town for a Special Permit as stated in
Section 4.136 of the Zoning Bylaw.
4. Adequate and appropriate facilities will be provided for the proper operation of the
proposed use.
5. This application for construction within the Watershed Protection District, Section
4.136 of the North Andover Zoning Bylaw,was specifically granted for construction or
regrading within 100' of a tributary to Lake Cochichewick. The Planning Board has
herein issued their approval for construction within the Watershed Protection District
with the condition that this lot be tied into the existing sewer system.The applicant has
made every effort to minimize the impact of the new construction on the Town's water
supply.
The.Planning Board finds under Section 4.136 of the Zoning Bylaw that the proposed site
plan generally complies with the Town Bylaw requirements but requires conditions in order
to be completely in compliance.
Upon reaching the above findings,the Planning Board approves this Special Permit based upon
the following conditions which shall be submitted to the Board prior to signing the documents
to be filed with the North Essex Registry of Deeds.
SPECIAL CONDITIONS:
1. This decision shall be filed with the North Essex Registry of Deeds.Included as part of
this decision are the following plans:
Plans entitled: Plan of Land in North Andover, MA.
Plan prepared by: D&A Survey Associates Inc., Malden, Mass.
Dated: March 24, 1992 Revised.: June 3, 1992
Any changes made to these plans shall be approved by the Town Planner.Any changes
that the planner may deem as substantial shall require approval by the Planning Board.
2. The Order of Conditions approved by the North Andover Conservation Commission
on 5/10/92, File # 242-583, shall be considered as part of this decision.
3. The contractor shall contact Dig Safe at least 72 hours prior to commencing any
excavation.
4. Gas, Telephone, Cable and Electric utilities shall be installed as specified by the
respective utility companies.
5. All catch basins shall be protected and maintained with hay bales to prevent siltation
into the drain lines during construction.
6. No open burning shall be done except as is permitted during burning season under the
Fire Department regulations.
7. No underground fuel storage shall be installed except as may be allowed by Town
Regulations.
8. Prior to a Certificate of Occupancy being issued for any structures, this site shall
have received all necessary permits and approvals from the North Andover Board of
Health.
9. Prior to the Building Permit being issued for the structure and again prior to occupancy
of the structure, the applicant shall receive a written determination from the
Conservation Administrator that all work being done under the jurisdiction of the
Conservation Commission is being satisfactorily performed and maintained.
10. The provisions of this conditional approval shall apply to and be binding upon the
applicant, it's employees and all successors and assigns in interest or control.
11. The applicant agrees,as a part of this conditional approval, that in no instance shall a
septic system be installed on lot 3A. The Planning Board has herein issued their
approval for construction within the Watershed Protection District with the
understanding that this lot will be tied into the sewer system.
12. In no instance shall the Applicant's proposed construction be allowed to further impact
the site than as proposed on the plan referenced above in condition#1 of this approval.
13. No pesticides, fertilizers or chemicals shall be used in lawn care or maintenance. The
applicant shall incorporate this condition as a deed restriction,a copy of the deed shall
be presented to the Planning Board prior to the issuance of a Building Permit.
14. Any Residential dwelling found on lot 3A shall be guttered and drained by a pipe system
into a leach pit. The leach pit shall be a minimum of 1000 gallon concrete pit with 24"
depth of 1.5" stone around and beneath. Any runoff associated with the proposed
driveway access shall be either directed toward the street or contained to the leach pit.
The leachpit shall be located outside the 100' wetland buffer as shown on the record
plans.
I5. Prior to the Applicant receiving a Certificate of Occupancy, Drainage easements and
wetland restriction easements shall be granted to the Town of North Andover. The
easements shall be recorded with the Essex North Registry of Deeds.
16. Prior to receiving a Certificate of Occupancy the applicant shall submit a certified copy
of an As-Built plan which shows all construction including, sewer lines, leach pits
and other pertinent site features.This As-Built shall be submitted to the Town Planner
for approval and shall be stamped by both a certified land surveyor and practicing
engineer.
17. As shown on the plans referenced in condition number one (1) of this approval all
structures shall remain at least 70 feet off the wetland delineation line. Any additional
structures which require a foundation shall not be allowed without the issuance of a
Special Permit as required by section 4.136 of the North Andover Zoning Bylaw.
18. A No-Cut line shall be established 50 feet from the edge of the wetland as shown
on the approved plans. This No-Cut buffer shall be marked in the field with a
haybale line prior to the issuance of a building permit.
cc: Director of Public Works
Board of Public Works
Highway Surveyor
* Y
1
Building Inspector
Board of Health
Assessors
Conservation Commission
Police Chief
Fire Chief
Applicant
Engineer
File