Loading...
HomeMy WebLinkAboutTHIBODEAU PE, BRUCE t A Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 242-1473 WPA Form 5 — Order of Conditions MassDEPFile# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town A. General Information Important: North Andover When filling 1.From: out forms Conservation Commission on the 2. This issuance is for computer, (check one): a. ®Order of Conditions b.[]Amended Order of Conditions use only the tab key to 3.To: Applicant: move your cursor-do Bruce Thibodeau, P. E. not use the a. First Name b. Last Name return key. _ D u i�0iirl r�nuuvei rvv c.Organization 384 Osgood Street d. Mailing Address North Andover MA 01845 e. City/Town f.State g.Zip Code 4. Property Owner(if different from applicant): a. First Name b.Last Name Trustees of Reservations (Map 36, Parcel 9)/Town of North Andover(Map 37C, Parcel 4) c. Organization 572 Essex Street/ 120 Main Street d. Mailing Address Beverly/North Andover MA/MA 01915/01845 e. City/Town f.State g.Zip Code 5. Project Location: Pleasant Street @ Steven 's Pond North Andover a. Street Address b.Cityrrown Map 36/Map 37C Parcel 9, 4 c.Assessors Map/Plat Number d. Parcel/Lot Number Latitude and Longitude,if known: 42d41.4m s 71d6.4m s d. Latitude e.Longitude wpaform5.doc• rev.03/2/2010 Page 1 of 12 y Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEPFile# Massachusetts Wetlands.Protection Act M.G.L c. 131, §40 eDEP Transaction# North Andover City/Town A. General Information (cont.) 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex North a.County b.Certificate Number(if registered land) 719 253 c.Book d.Page 4/1/10 4/14/10 4/29/10 7. Dates a.Date Notice of Intent Filed b. Date Public Hearing Closed c.Date of Issuance a. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Steven's Pond Hydro-Raking Area a. Plan Title Aquatic control Technology b. Prepared By c.Signed and Stamped by 3/2010 d. Final Revision Date e.Scale f.Additional Plan or Document Title g.Date B. Findings i. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act(the Act). Check all that apply: a. ❑ Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution ® Protection of d. ® Private Water Supply e. ® Fisheries f. Wildlife Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project,as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. wpaform5.doc- rev.03/2/2010 Page 2 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEPFile# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town B. Findings (cont.) Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth. in the wetland regulations. Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order-of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3. ® Buffer Zone Impacts: Shortest distance between limit of project 0 disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.linear feet Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement -10 -10 4. ® Bank a.linear feet b,linear feet c.linear feet d.linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. ® Land Under 70,000 temp 70,000 temp 70,000 70,000 Waterbodies and a.square feet b.square feet c.square feet d.square feet Waterways e.cty dredged f.cly dredged 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet a. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 9. ❑ Riverfront Area b.total sq.feet Sq ft within 100 ft r enn�rra fcc} d.square feet o ennorc foot f.square feet Sq ft between 100- 200 ft t f h.square feet s n enn�ro foot q i enn�ro fno} �• uare feet q wpaform5.doc- rev.03/2/2010 Page 3 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 242-1473 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town B. Findings (cont.) Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 10. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below 11. ❑ Land Under the Ocean a.square feet b.square feet c.Gy dredged d.c/y dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. cu yd cu yd ❑ Coastal Beaches a.square feet b.square feet c.nourishment d. nourishment 14. ❑ Coastal Dunes cu yd cu yd a.square feet b.square feet c.nourishment d.nourishment 15. ❑ Coastal Banks a.linear feet b. linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a.square feet b.square feet c.cly dredged d.cly dredged 19. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.cty dredged b.cly dredged 21. ❑ Land Subject to Coastal Storm a.square feet b.square feet Flowage wpaform5.doc• rev.03/2/2010 Page 4 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEPFile# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town B. Findings (cont.) *#22. If the 22 ❑ Restoration/Enhancement*: project is for the purpose of restoring or a.square feet of BVW b.square feet of salt marsh enhancing a wetland resource area 23. ❑ Stream Crossing(s): in addition to the square footage that a. number of new stream crossings b. number of replacement stream crossings has been C. General Conditions Under Massachusetts Wetlands Protection Act entered in Section B.5.c BBV )(Salt or The following conditions are only applicable to Approved projects. Marsh)above, Failure to comply with all conditions stated herein, and with all related statutes and other please enter regulatory measures, shall be deemed cause to revoke or modify this Order. the additional 9 y fy amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on unless extended in writing by the Department. 7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken,until all proceedings before the Department have been completed. wpaform5.doc• rev.03/2/2010 Page 5 of 12 I Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEP'File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MassDEP"] "File Number 242-1473 " 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. vvpaform5.doc• rev.03/2/2010 Page 6 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19. The work associated with this Order (the"Project') is (1) ❑ is not(2)®subject to the Massachusetts Stormwater Standards. If the work is subject to the Stormwater Standards,then the project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. wpaform5.doc• rev.03/2/2010 Page 7 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEPFile# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 18(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement) for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan")and certifying the following: i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f)through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f)through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wpaform5.doc rev.03/2/2010 Page 8 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions(if you need more space for additional conditions, please attach a text document): See Attached wpaform5.doc- rev.03/2/2010 Page 9 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEPFile# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 \ eDEP Transaction# North Andover City/Town D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The North Andover hereby finds (check one that applies): Conservation Commission a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: 1.Municipal Ordinance or Bylaw 2.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. b. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: North Andover Wetlands Protection Bylaw Chapter 178 1. Municipal Ordinance or Bylaw 2.Citation 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows(if you need more space for additional conditions, attach a text document): See Attached wpaform5.doc- rev.03/2/2010 Page 10 of 12 DEP FILE #242 - 1473 Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other ro osals submitted with the Notice of Intent the conditions shall control. GENERAL CONDITIONS 20. The proposed work includes: Hydro-raking to remove nuisance aquatic vegetation at Stevens Pond and improve the natural capacity of the resource area to function. The area to be hydro-raked is approximately 400 feet long by 175 feet out from shore. The removal of nuisance aquatic vegetation will help to retard lake eutrophication as well as improve dissolved oxygen and habitat value. No herbicides or algaecides are proposed as part of this project. 21. The work shall conform to the following: Applicant: Bruce Thibodeau, P.E. North Andover Director of Public vv orks 384 Osgood Street North Andover, MA 01845 Notice of Intent filed by: see above Dated: 03/29/10 Site Plans prepared by: Aquatic Control Technology, Inc. 11 John Road Sutton, MA 01590 Titled: Stevens Pond Hydro-Raking Area Dated: 3/2010 22. The term"Applicant" as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 23. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 242-1473,Pleasant Street-Stevens Pond Hydro-Raking OOC.doc 1 NACC 4/29/2010 DEP FILE #242 - 1473 24. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 25. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However,the NACC, agent of the NACC or the Department of Environmental Protection(DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued,to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland ByLaw and Regulations, and may require any information,measurements,photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further,work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 26. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 27. The work authorized hereunder shall be completed within three gears from the date of this order. 28. This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least LhiM days(30) prior to the expiration date of the Order (Refer to Section 8.3 (p.37) of the North Andover Wetland Regulations). 29. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 30. Where the Department of Environmental Protection(DEP) is requested to make a determination and to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 31. Any future project which proposes a wetland crossing in order to access certain portions of the property will not be qualified as a limited project roadway under 310 CMR 10.53(e). 32. The following wetland resource areas are affected by the proposed work: Bank and Land Under Waterbodies and Waterways. This resource area is significant to the interests of the Act and Town ByLaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of this resource area to the identified interests. 242-1473,Pleasant Street-Stevens Pond Hydro-Raking OOC.doc 2 NACC 4/29/2010 DEP FILE #242 - 1473 33. The NACC agrees with the applicant's delineation of the wetland resource_ area as being the limit of mean annual high water. 34. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty five foot(25) No-Disturbance Zone and a fifty foot (50') No-Construction Zone shall be established from the edge of the adjacent wetland resource area except as follows: The area historically used as a public beach and swimming area which is detailed in the previously approved Negative Determination of Applicability dated May 8, 1997 and associated Request for Determination of Applicability dated April 25, 1997. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. 35. This document shall be included in all construction contracts, subcontracts,and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 36. The owners of the project and their successors in title agree that the Order does not in itself impose upon the Town any responsibility to maintain the beach and swimming area and that said Town shall not be liable for any damage in the event of failure. By acceptance of this Order,the owners agree to indemnify and hold harmless to the Town and its residents for any damage attributable to alterations undertaken on this property pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding,storm damage or any other form of water damage. PRIOR TO CONSTRUCTION 37. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 38. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording 242-1473,Pleasant Street-Stevens Pond Hydro-Raking OOC.doc 3 NACC 4/29/2010 DEP FILE #242 - 1473 information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 39. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts DEP, File Number 242-1473." 40. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. No work shall begin on a project until written approval has been granted by the NACC. 41. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 42. Prior to any work commencing on-site, the applicant shall submit to the NACC for approval, a detailed sequence including dates of the hydro-raking and machinery access points. Approval of the sequence is required prior to construction. 43. The proposed limits of work are clearly marked on the plan. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this limit at any time. 44. Prior to commencement of any activities on site, a meeting shall be scheduled at the site with representatives from the Department of Public Works, the Aquatic Control Technology, Inc. contractor(s) and the Conservation Department to review the proposed work and ensuing conditions and determine if any erosion and sedimentation controls would be necessary. All erosion prevention and sedimentation protection measures found necessary during the hydro-raking activities shall be implemented at the direction of the NACC or its agent. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed immediately upon the Commission's request. 45. The applicant shall have on hand at the start of any soil disturbance,removal or stockpiling, a minimum of 10 hay bales and sufficient stakes for staking these bales (or an 242-1473,Pleasant Street-Stevens Pond Hydro-Raking OOC.doc 4 NACC 4/29/2010 DEP FILE #242 - 1473 equivalent amount of silt fence, 1 hay bale to equal 3 feet of fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 46. A representative from the North Andover Department of Public Works shall be designated to be on site during all work activities to ensure that the conditions in this Order are fully complied with and that water quality impacts to the pond remain within the scope of this approval. 47. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring, or assigning any portion of said land to another party, subject to said Orders of Conditions, the "Compliance Certification Form Affidavit" attached via"Appendix A" signed under the pains and penalties of perjury, stating that said applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5) business days prior to the closing of said land transaction. 49. This Order shall be included in all contracts,subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site supervisor responsible for the coordination of the proposed work and to ensure compliance with this Order. STORMWATER MANAGEMENT CONDITIONS 50. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions,unless specifically approved in writing by the Commission. 51. Water quality in down gradient BVW's shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. DURING CONSTRUCTION 52. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 242-1473,Pleasant Street-Stevens Pond Hydro-Raising OOC.doc 5 NACC 4/29/2010 DEP FILE #242 - 1473 53. Work activities shall follow the removal techniques,procedures and specifications as submitted in the Notice of Intent received on April 1,2010. 54. No change in grade/deepening or alteration of the pond bottom or along the shores/banks of the pond shall be allowed during or as a result of the approved activities. 55. Vegetation removal activities shall be limited to those areas directly surrounding the Town's marked beach/swim area, unless otherwise approved by this department. 56. Collected nuisance vegetation shall be taken off site and transported to the Cyr Recycling Center and shall be composted. 57. Erosion control devices shall be inspected regularly; any entrapped silt shall be removed to an area outside of the buffer zone and wetland resource areas; silt fence and hay bales shall be replaced as necessary. The areas of construction shall remain in stable condition at the close of each construction day. All erosion controls shall be in place throughout the duration of any construction on site or unless authorized by the Conservation personnel. 58. No dewatering activities are proposed. If emergency de-watering requirements arise, the applicant shall submit a contingency plan to the Commission for approval,which provides for the pumped water to be contained in a settling basin to reduce turbidity prior to discharge into a resource area. A ring of hay bales shall surround the discharge area and a silt sock shall be used. De-watering activities anticipated shall be supervised and witnessed by the designated Environmental Monitor. This designee must be on-site while work specific to de-watering activities are occurring and until complete. Activities shall be monitored daily by the Environmental Monitor to ensure that sediment laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction under the MA Wetlands Protection Act and / or the North Andover Wetlands Bylaw. 59. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed, seeded and mulched,with a layer of mulch hay. All disturbed areas must be graded,loamed and seeded prior to November 1St of each year. Outside of the growing season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until climate conditions allow for seeding. During construction, any area of exposed soils that will be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means approved by the NACC. 60. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 61. Construction equipment/vehicles shall not be staged overnight within 100 feet of a wetland resource area. 242-1473,Pleasant Street-Stevens Pond Hydro-Raking OOC.doc 6 NACC 4/29/2010 DEP FILE #242 - 1473 62. There shall be no stockpiling of soil or other materials within fifty (50) feet of any resource area except as follows: the temporary placement of raked vegetation directly on the beach to allow for partial dewatering for up to 2 days prior to being trucked off-site. Soils or other materials shall be stockpiled in locations approved by this department or within the designated areas as shown on the approved plan referenced herein. Further, due to the existing grade on the site,any approved temporary stockpile areas shall be adequately surrounded by erosion controls to prevent migration of soils to the resource area. 63. Washings from trucks,or other debris, sand,vegetation, shall not be directed to any drainage system or wetland resource area. 64. All waste generated by, or associated with, the approved activity shall be contained within the limit of work, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local ByLaw. 65. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. MR CONSTRUCTION 66. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland protection ByLaw. 67. Fertilizers utilized for landscaping and lawn care shall be slow release,low-nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland Protection ByLaw and shall remain in perpetuity. 68. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilizedermanentl against erosion. This shall be done b P Y g Y loaming and seeding according to NRCS standards. Stabilization will be considered complete once full vegetative cover has been achieved. 242-1473,Pleasant Street-Stevens Pond Hydro-Raking OOC.doc 7 NACC 4/29/2010 DEP FILE #242 - 1473 69. Immediately upon completion of work activities, the Conservation Department shall be notified for a post construction inspection. 70. Upon approved site stabilization by Conservation staff, the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. 71. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A-"Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditionsprior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from DPW stating that work was done as approved with photos of current conditions. 72. The following special conditions shall survive the issuance of a Certificate of Compliance (COC)for this project: ➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas except in those locations approved under DEP # 242-1473. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC (refer to Section 3.4 (page 15) of the Regulations for performance standards within these zones) The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local ByLaw; ➢ Discharge or spillage of pollutants (Condition#65); ➢ Prohibition of underground fuels(Condition#66); ➢ Limitations on the use of fertilizers, herbicides, and pesticides (Conditions #67). 242-1473,Pleasant Street-Stevens Pond Hydro-Raking OOC.doc 8 NACC 4/29/2010 Massachusetts Department of Environmental Protection Provided by MassDEP: -Ll� Bureau of Resource Protection -Wetlands 242-1473 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town E. Signatures This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4,from the date of issuance. 1.Date of Iss6ance Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant.A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically,and the property owner,if different from applicant. Signatures: ❑ by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. wpaform5.doc• rev.03/2/2010 Page 11 of 12 DEP FILE 4 242 - 1473 APPENDIX A -AFFIDAVIT I on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) 1. I am the of (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP or NACC number) the North Andover Conservation Commission. &/or 2. I am the of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. 1 hereby affirm and acknowledge that I have received said Order of Conditions and have read ffhe same and understand each. (DEP File#) and every condition which has been set forth in said Order of Conditions. 4. I hereby affirm and acknowledge that on this day of 19 I inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. (DEP File#) 5. 1 hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File#) Signed under the pains and penalties of perjury this day of 19 (Signature-authorized agent of applicant or owner) 242-1473,Pleasant Street-Stevens Pond Hydro-Raking OOC.doc 9 NACC 4/29/2010 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 242-1473 WPA Form 5 Order of MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# North Andover City/Town G. Recording Information Prior to commencement of work, this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below. North Andover Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: North Andover Conservation Commission Please be advised that the Order of Conditions for the Project at: Pleasant Street @ Steven 's Pond 242-1473 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: Essex North County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant wpaform5.doc• rev.03/2/2010 Page 12 of 12 [LJ, Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1381 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: North Andover When filling From: Conservation Commission out forms on the computer, 2. This issuance is for(check one): ® Order of Conditions ❑ Amended Order of Conditions use only the tab key to 3. To: Applicant: move your cursor-do not William J. Hmurciak, P. E. Town of North Andover(DPW) use the return a. First Name b.Last Name c.Company key. 384 Osgood Street d.Mailing Address North Andover MA. 01845 e.Cityrrown f.State g.Zip Code 4. Property Owner(if different from applicant): Town of North Andover a. First Name b.Last Name c.Company 120 Main Street d.Mailing Address North Andover MA. 01845 e.City/Town f.State g.Zip Code 5. Project Location: Pleasant Street at Stevens Pond North Andover a.Street Address b.City/Town Map 37C Parcel 50 c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known (note: 42, 41, 23, N 71, 06, 19 W electronic filers will click for GIS locator): e.Latitude f.Longitude 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex North a.County b.Certificate(if registered land) c.Book d.Pa2e 1/12/07 `�1 ` 2 7. Dates: a.Date Notice of Intent Filed b.Date Public Baring Closed c.Dat of Is uance 8. Final Approved Plans and Other Documents(attach additional plan or document references as needed): Existing Site Plan a. Plan Title Weston & Sampson Engineers, Inc. James F. Finegan, P. E. b.Prepared By c.Signed and Stamped by 1/12/07 V= 10' d. Final Revision Date e.Scale f.Additional Plan or Document Title g.Date 9. Total WPA Fee Paid: Exempt under 810 $500.00 CMR 4.02 b.State Fee Paid c.City/Town Fee Paid wpaf0rm5.d0c• rev.3/1/05 Page 1 of 9 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1381 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings 1. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued.A description of the performance standards which the proposed work cannot meet is attached to this Order. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and wetland boundary(if available) linear feet Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 3. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet 4. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 5. ❑ Land Under a.square feet b.square feet c.square feet d.square feet Waterbodies and Waterways e.cu.yd dredged f.cu.yd dredged wpaform5.doc• rev.3!1!05 Page 2 of 9 LLIMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1381 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 6. El Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet 7. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 8. ❑ Riverfront area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet T square feet Sq ft between 100-200 ft e.square feet f.square feet e.square feet f.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) 9. ❑ Designated Port Indicate size under Land Under the Ocean, below Areas 1o. ❑ Land Under the Ocean a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 11. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 12. ❑ Coastal Beaches a.square feet b.square feet c.Gy nourishmt. d.c/y nourishmt. 13. ❑ Coastal Dunes a.square feet b.square feet c.cly nourishmt. d.cly nourishmt 14. ❑ Coastal Banks a.linear feet b.linear feet 15. ❑ Rocky Intertidal Shores a.square feet b.square feet 16. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 17. ❑ Land Under Salt Ponds a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 18. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 19. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.cu.yd dredged b.cu.yd dredged 20. ❑ Land Subject to Coastal Storm Flowage a.square feet b.square feet wpaform5.doc• rev.3/1/05 Page 3 of 9 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1381 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection"[or, WA DEP"] "File Number 242-1381 " wpaform5.doc• rev.3/1/05 Page 4 of 9 ILI Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1381 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy Standards. Special Conditions: If you need more See attached space for additional conditions, select box to attach a text document wpaform5.doc• rev.3/1/05 Page 5 of 9 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands SEP File Number: WPA Form 5 - Order of Conditions 242-1381 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Findings Under Municipal Wetlands Bylaw or Ordinance i. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The North Andover hereby finds(check one that applies): Conservation Commission 3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: a. Municipal Ordinance or Bylaw b.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. 4. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: North Andover Wetland Protection Bylaw Chapter 178 a. Municipal Ordinance or Bylaw b.Citation The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. If you need more c. The special conditions relating to municipal ordinance or law are as follows: space for p 9 P Y additional See attached conditions, select box to attach a text document wpaform5.doc- rev.3/1/05 Page 6 of 9 DEP FILE # 242 - 1381 Therefore, the North Andover Conservation Commission (hereafter the "NACU) hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local Bylaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 18. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 19. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland Bylaw and Regulations,and may require any information, measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 20. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 21. The work authorized hereunder shall be completed within three years from the date of this order. 22. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section 8.3 (p.37)of the North Andover Wetland Regulations). 23. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 24. Where the Department of Environmental Protection(DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 25. This Order of Conditions is issued under File No.242-1381. C:AWinword\OOC/Lakedamrepair.doc 1 NACC 3/14/2007 DEP FILE # 242 - 1381 26. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 27. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of thep P tY ro er referenced in the Notice of Intent supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 28. The proposed work includes: the replacement and repair of an existing outlet dam structure and associated grading and the installation of a new underground utility at Stevens Pond and Lake Cochichewick off of Pleasant Street within the buffer zone to BVW,LUW, associated bank, BLSF, and the local 25' no-disturbance zone and 50' no- build zone. 29. The work shall conform to the following(except as noted in the remainder of this document where revisions may be required): Notice of Intent filed by: Town of North Andover DPW(Applicant) C/o J.William Hmurciak, P.E. 384 Osgood Street North Andover,MA 01845 Dated January 12,2007 Town of North Andover (Owner) 120 Main Street North Andover,MA 01845 Notice of Intent prepared by: Weston&Sampson Engineers,Inc. (Representative) Five Centennial Drive Peabody, MA 01%0 Site Pians prepared by: Weston &Sampson Engineers, Inc. Entitled "Lake Cochichewick Structure and Dam Project",dated 1/12107,consisting of sheets 2-9. Stamped &Signed by James F. Finegan,P.E. Other Record Documents: Lake Cochichewick Outlet Dam- Inspection/Evaluation Report, prepared by Weston & Sampson Engineers, Inc., dated October 5,2006, Cofferdam/Dewatering Detail sheet(no title or date). 30. The following wetland resource areas are affected by the proposed work: BVW,LUW, Bank, BLSF and associated buffer zones. C:\Winword\OOC/Lakedamrepair.doc 2 NACC 3/14/2007 DEP FILE# 242 - 1381 31. These resource areas are significant to the interests of the Act and Town ByLaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 32. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as shown on the approved plans referenced herein. 33. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty-five foot (25') No-Disturbance Zone and a fifty-foot (50') No-Construction Zone except in those previously disturbed areas and those areas approved under this filing shall be established from the edge of the adjacent wetland resource area. The applicant shall make every effort to minimize impacts to the resource areas and to the 25' No-disturbance zones. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No- Disturbance zone. (See Section 3.4 &Appendix F of the local Regulations). 34. This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 35. The owners of the project and their successors in title,in the event they proceed to alter areas subject to the Commissions jurisdiction under the order,agree that the Order does not in itself impose upon the Town any responsibility to maintain the proposed drainage system and that said Town shall not be liable for any damage in the event of failure. By acceptance of this Order, the owners agree to indemnify and hold harmless to the Town and its residents for any damage attributable to alterations undertaken on this property pursuant to the Order. Maintenance of the drainage system, if accepted by the Town as part of a public way, becomes the responsibility of the Town. 36. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. "PRIORO CONSTRUCTION 37. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed,until all proceedings before the Department or Court have been completed. C:\Winword\OOC/Lakedamrepair.doc 3 NACC 3/14/2007 DEP FILE #242 - 138.1 38. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 39. A sign shall be displayed at a visible street location not less than two square feet or more than three square feet in size bearing the words"Massachusetts DEP, File Number 242- 1381." 40. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing(at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC. 41. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 42. Prior to any work commencing on site, the applicant shall submit to the NACC for approval, a detailed construction sequence, including a dated timetable of construction, the construction of compensation and retention areas, installation of sedimentation/erosion control devices, roadway infrastructure, phasing associated with the development and the construction of the associated stormwater management structures. The construction sequence shall specify that all work including stabilization measures shall be completed between low flow conditions (July 1St to September 1st). 43. Wetland flagging shall be checked prior to start of construction and shall be re-established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked with stakes or flags C:\Winword\OOC/Lakedamrepair.doc 4 NACC 3/14/2007 DEP FILE # 242 - 1381 and shall be confirmed by the NACC. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond this line at any time. All flags used for the above purposes shall be of a color different from other flagging used on the site. 44. A row of staked hay bales backed by trenched siltation fence shall be placed between all construction areas and wetlands. Additional erosion control measures (i.e. - sandbags, checkdams,filter fabric,jutematting, cofferdam, etc.) shall be placed and implemented as necessary as described in the Notice of Intent or as determined by the Project Manager, Site Contractor, Erosion Control Monitor,and/or the Conservation Department. If necessary, haybale check dams and/or other appropriate erosion control measures shall be implemented and installed immediately downstream from the proposed work. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. The NACC reserves the right to impose additional conditions on portions of this project to mitigate any impacts which could result from site erosion,or any noticeable degradation of surface water quality discharging from the site. For example,installation of erosion control measures may be required in areas not shown on the plan(s)referenced in this Order of Conditions. Should such installation be required by the NACC,they shall be installed immediately upon(within 24 hours) of the Commission's request. 45. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of 30 hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. All additional emergency erosion controls shall be on site prior to the commencement of any work on site and will be verified by the Conservation Department during the pre-construction meeting. 46. A check payable to the Town of North Andover shall be provided in the amount of$10,000, which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer through the NACC before commencement of work. Said deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provisions, satisfactory to the NACC, have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local Bylaw. 47. The applicant shall designate a Qualified Professional Wetland Scientist as an "Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be C:\Winword\OOC/Lakedamrepair.doe 5 NACC 3/14/2007 DEP FILE #242 - 1381 contacted, due to an emergency at the site, during any 24-hour period, including weekends. Proof of the retained monitor must be submitted to the Conservation Department on letterhead by the retained consulting firm for subsequent review and approval by the NACC or agent thereof. This person shall be given the authority to stop construction for erosion control purposes. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal ofn Y Pp a entrapped silt. 48. ON EVERY MONDAY of each week, or otherwise arranged by the NACC, in which construction activities occurs on-site and for as long thereafter as ground remains unstable, it is the applicant's responsibility to ensure that the Environmental/Erosion Control Monitor (EMC) monitor the site and submit written reports to the NACC. The EMC shall certify that,to the best of his/her knowledge and belief based on a careful site inspection, all work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The EMC must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation,turbidity,and/or other water quality impacts. Monitoring reports shall include current condition of erosion and sedimentation controls; describe any erosion or sedimentation repair and/or replacement; and describe any erosion or sedimentation problems and mitigation measures implemented. 49. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring,or assigning any portion of said land to another party, subject to said Orders of Conditions,the "Compliance Certification Form Affidavit" attached via "Appendix A" signed under the pains and penalties of perjury,stating that said applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5) business days after to the closing of said land transaction. 50. Once these above mentioned pre-construction requirements are complete,the applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative,the contractor,the engineer, wetland scientist and the applicant to ensure that all of the Conditions of this Order are understood. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice for each pre-construction meeting (e.g. 72 hours). C:AWinword\OOC/Lakedamrepair.doc 6 NACC 3/14/2007 DEP FILE # 242 - 1381 STORMWATER MANAGEMENT CONDITIONS 51. All drainage structures shall be properly installed and functional. Further,all drainage structures shall be properly maintained during construction. 52. There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission. 53. Water quality down gradient shall not differ significantly following completion of the project from the pre-development conditions. There shall be no sedimentation into wetlands or water bodies from discharge pipes or surface runoff leaving the site. DURING CONSTRUCTION - __ I i - J 54. Accepted engineering and Best Management Practices (BMPs) for construction standards shall be followed in the conduct of all work. 55. All work activities shall be conducted duringlow or no flow conditions specifically from � P Y July 191 to September 1St of any given year,to decrease downstream turbidity and to prevent migration of sediments. 56. Erosion control devices shall be inspected regularly;any entrapped silt shall be removed to an area outside of the buffer zone and wetland resource areas; erosion control devices shall be replaced as necessary. The areas of construction shall remain in stable condition at the close of each construction day. All erosion controls shall remain in place throughout the duration of any construction on site. 57. The Environmental Monitor shall be on site during all construction activities to ensure that work is being performed in compliance with this Order. The monitor must visually inspect any sedimentation/erosion control measures and assume responsibility for their maintenance and that they are functioning as intended. In addition,all wetland resource areas must be visually inspected for siltation,turbidity,and/or other water quality impacts. 58. Upon completion of work activities, disturbed stream bank and buffer zone areas shall be immediately seeded with the appropriate seed mix and stabilized with jute matting if necessary. 59. Prior to the removal of existing vegetation in the resource areas or the 25-foot no- disturbance zone,the Conservation Department shall be contacted to determine whether this vegetative removal is necessary and provides specific wildlife habitat value and/or function. The Conservation Department shall have the authority to require additional mitigation C:\Winword\OOC/Lakedamrepair.doe 7 NACC 3/14/2007 DEP FILE # 242 - 1381 and/or restoration activities of any removed or significantly disturbed vegetation within these jurisdictional resource areas not approved under this filing. 60. Any approved removal of native vegetative species shall be considered for use in creating (or maintaining existing) additional wildlife habitat throughout the project site. Any such enhancement areas shall be placed-as directed by the Conservation Department. 61. Upon beginning work, the applicant shall submit written progress reports every week detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 62. All catch basins shall contain oil/gasoline traps, and it shall be a continuing condition of this order, even after a Certificate of Compliance is issued, that the oil/gasoline traps in the catch basins be maintained. All catch basins shall be free of all accumulated silt and debris before Compliance is issued and the owner or his/her agent shall so specify in the request for Compliance. 63. The sewer lines on the site, where they cross-wetland resource areas, shall be tested for water tightness in accordance with North Andover DPW standards. 64. The Erosion Control Monitor shall be on site during and/or following a major storm event of 1 inch of rain or greater to ensure that soils remain stable,erosion controls are adequate and secure, and that all BMP's are adequately functioning. 65. Approved de-watering activities anticipated shall be supervised and witnessed by the designated erosion control monitor. This designee must be on-site at all times while dewatering is occurring_ De-watering activities shall be conducted as approved under this filing unless otherwise directed by the Conservation Department or the Erosion Control Monitor. Dewatering activities shall be monitored daily by the erosion control monitor to ensure that sediment-laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland Bylaw. If emergency de-watering requirements arise,the applicant shall submit a contingency plan to the Commission for approval,which provides for the pumped water to be contained in a settling basin,to reduce turbidity prior to discharge into a resource area. 66. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators,motor vehicles or parts on any of the foregoing. 67. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or loamed, seeded and mulched, with a layer of mulch hay. All disturbed areas must be graded, loamed and seeded prior to November 1s'of each year. Outside of the growing season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until climate conditions allow for seeding. C:\Winword\OOC/Lakedamrepair.doc 8 NACC 3/14/2007 DEP FILE # 242 - 1381 68. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 69. Equipment shall not be staged overnight within 50-feet of a wetland resource area. 70. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. 71. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. 72. All waste generated by,or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local Bylaw. 73. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1)business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. E I C AFTER CONSTRUCTION 74. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Towri s Wetland Protection Bylaw and shall remain in perpetuity. 75. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by loaming and seeding according to SCS standards. If the latter course is chosen, stabilization will be considered complete once vegetative cover has been achieved. 76. Upon approved site stabilization by Conservation staff,the erosion controls shall be removed and properly disposed of and all exposed unvegetated areas shall be seeded. C:\Winword\OOC/Lakedamrepair.doc 9 NACC 3/14/2007 DEP FILE # 242 - 1381 77. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A - "Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map/parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i. An"As-Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth, for the public record. This plan will include: Y "As-Built" post-development elevations of all drainage & stormwater management structures constructed within 100 feet of any wetland resource area. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone than the entire structure must be depicted to accurately verify compliance. "As-Built" post-development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone,which is regulated as a resource area under the local Wetland Protection Bylaw. Y Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, additions,fences,sheds, stone walls, pools, retaining walls, subsurface utilities and decks. A line showing the limit of work and the extent of existing erosion control devices. "Work" includes any disturbance of soils or vegetation. Location of all subsurface utilities entering the property. C:\Winword\OOC/Lakedamrepair.doc 10 NACC 3/14/2007 DEP FILE # 242 - 1381 78. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established from the edge of adjacent wetland resource areas except in those locations approved under this filing. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local Bylaw (Condition#33); ➢ Discharge or spillage of pollutants (Condition#73); ➢ Limitations on the use of fertilizers,herbicides, and pesticides (Condition#74). C:\Winword\OOC/Lakedamrepair.doe 11 NACC 3/14/2007 DEP FILE #242 - 1381 APPENDIX A —AFFIDAVIT I, on oath do hereby depose and state: (authorized agent of applicant and/ or owner) (PLEASE CHECK AT LEAST ONE BLOCK) 1) I am the of (position with applicant) (applicants name) the applicant upon whom the Order of Conditions have been (DEP or NACC File#) placed upon by the North Andover Conservation Commission(NACC). and / or 2) I am the of (position with owner) (owner) the owner upon whose land Order of Conditions have been (DEP or NACC File#) placed upon by the NACC. ♦ I hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each and every condition,which has been set forth in said Order of Conditions. ♦ I hereby affirm and acknowledge that on this day of 20 , 1 inspected said property together with any and all improvements,which have been made to the same and hereby certify that each and every condition set forth in the Order of Conditions are presently in compliance. ♦ I hereby affirm and acknowledge that this document will be relied upon by the NACC, as well as any potential buyers of said property, which is subject to the Order of Conditions. Signed under the pain and penalties of perjury this day of ,20 (Authorized agent of applicant or owner) C:\Winword\OOC/Lakedamrepair.doc 12 NACC 3/14/2007 L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1381 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 E. Issuance This Order is valid for three years, unless otherwise specified as a special b condition pursuant to General Conditions#4, from the date of issuance. 1.Date of Iss ance Please indicate the number of members who will sign this form: 6 This Order must be signed by a majority of the Conservation Commission. 2.Number of signers The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property er ' different from applicant. Signatures: Notary Acknowledgement Commonwealth of Massachusetts County of On this Day of Month Year Before me, the undersigned Notary Public, S'r,;f+ t1CA.5SC— personally appeared Name of Document Signer proved to me through satisfactory evidence of identification, which was/were i Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member ofCi mow Conservation Commission � DONNA IIIR=YVEDCE LL/B-nom�!�,�2�� WARypJpuC Signature of Notary Public s -F commowil A V OF MASSACHUSETTS my comm Ezphes Aug.7,2009 DOS✓1' �- �/� Printed Name of Notary Public Place notary sea[and/or any stamp above �f 17 `20oq My Commissi Expires(Date) This Order is issued to the applicant as follows: dtby hand delivery on ❑ by certified mail, return receipt requested, on 3%y162 Dat— a r— Date wpaform5.doc• rev.3/1/05 Page 7 of 9 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1381 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant.Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or Determination, or providing written information to the Department prior to issuance of a Superseding Order or Determination. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. Section G, Recording Information is available on the following page. wpaform5.doc• rev.3/1/05 Page 8 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1381 L1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of this form shall be submitted to the Conservation Commission listed below. North Andover Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. --------------------------------------------------------------------------------------------------------------------------- To: North Andover Conservation Commission Please be advised that the Order of Conditions for the Project at: 242-1381 Project Location DEP File Number Has been recorded at the Registry of Deeds of. County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant wpaform5.doc- rev.3/1/05 Page 9 of 9